IR 05000338/2024006
| ML25065A263 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 03/11/2025 |
| From: | Mark Franke NRC/RGN-II/DORS/PB4 |
| To: | Carr E Dominion Energy |
| References | |
| IR 2024006 | |
| Download: ML25065A263 (1) | |
Text
March 11, 2025
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000338/2024006 AND 05000339/2024006
Dear Eric Carr:
The NRC has completed its end-of-cycle performance assessment of North Anna Power Station reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at North Anna Power Station, Unit 1 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,
Green).
The NRC determined the performance at North Anna Power Station, Unit 2 during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRCs Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on a single inspection finding having low to moderate safety significance (i.e., White) in the Mitigating Systems Cornerstone originating in the fourth quarter of 2024, and all PIs within the expected range. In response to the finding, the NRC conducted a supplemental inspection from December 17-19, 2024, in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs. The subsequent supplemental inspection report and follow-up assessment letter, NORTH ANNA UNIT 2 - 95001 SUPPLEMENTAL INSPECTION SUPPLEMENTAL REPORT 05000339/2024040 AND FOLLOW-UP ASSESSMENT LETTER (ADAMS Accession Number ML25021A004) closed the finding and transitioned Unit 2 to the Licensee Response Column (Column 1) of the NRCs ROP Action Matrix as of December 19, 2024. Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2026. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact James Baptist at 404-997-4506 with any questions you have regarding this letter.
Sincerely, Mark E. Franke, Director Division of Operating Reactor Safety Docket Nos.: 05000338, 05000339 License Nos.: NPF-4, NPF-7 Enclosure:
North Anna Inspection Plan cc: Distribution via ListServ Signed by Franke, Mark on 03/11/25 SUBJECT:
ANNUAL ASSESSMENT LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000338/2024006 AND 05000339/2024006 DATED - MARCH 11, 2025 DISTRIBUTION:
R2 ACES RidsNRRDRO Resource ROPAssessment Resource RidsNrrPMNorthAnna Resource ADAMS ACCESSION NUMBER: ML25065A263 X
SUNSI Review X
Non-Sensitive
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII/DORS RII/DORS RII/DORS NAME J. Baptist C. Even M. Franke DATE 03/07/25 03/10/25 03/11/25
Site Inspection Activity Plan Enclosure North Anna 03/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count UNIT 2 IN-SERVICE INSPECTION
2 3/10/2025 3/14/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
PROBLEM IDENTIFICATION AND RESOLUTION
1,2 4/28/2025 5/2/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 5/12/2025 5/16/2025 IP 71152B 000747 Problem Identification and Resolution NORTH ANNA INITIAL EXAM
1,2 6/22/2025 6/28/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 8/3/2025 8/16/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
RP PUBLIC RAD SAFETY BASELINE INSPECTION
1,2 6/23/2025 6/27/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 6/23/2025 6/27/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program 1,2 6/23/2025 6/27/2025 IP 71151 000746 Performance Indicator Verification COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI)
1,2 7/14/2025 7/18/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 7/28/2025 8/1/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection CYBER SECURITY INSPECTION
UNIT 1 IN-SERVICE INSPECTION +SG
1 9/15/2025 9/26/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
EMERGENCY PREPAREDNESS PROGRAM INSPECTION
1,2 9/15/2025 9/19/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 9/15/2025 9/19/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 9/15/2025 9/19/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 9/15/2025 9/19/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 9/15/2025 9/19/2025 IP 71151 001397 Performance Indicator Verification RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION
1,2 9/15/2025 9/19/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 9/15/2025 9/19/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 9/15/2025 9/19/2025 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION
1,2 11/3/2025 11/6/2025 IP 71130.02 000734 Access Control 1,2 11/3/2025 11/6/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 11/3/2025 11/6/2025 IP 71130.07 000739 Security Training 1,2 8/11/2025 8/15/2025 IP 71130.10 000741 Cybersecurity
Site Inspection Activity Plan
MATERIAL CONTROL AND ACCOUNTING
NORTH ANNA REQUAL INSPECTION
1,2 1/26/2026 1/30/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance NORTH ANNA INITIAL EXAM
SECURITY BASELINE INSPECTION
EMERGENCY PREPAREDNESS EXERCISE INSPECTION
1,2 7/13/2026 7/17/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 7/13/2026 7/17/2026 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 7/13/2026 7/17/2026 IP 71151 001397 Performance Indicator Verification FOCUSED ENGINEERING INSPECTION (AGE-RELATED)
1,2 8/10/2026 8/14/2026 IP 71111.21N.04 001832 Age-Related Degradation 1,2 8/24/2026 8/28/2026 IP 71111.21N.04 001832 Age-Related Degradation SECURITY BASELINE INSPECTION
1,2 8/31/2026 9/3/2026 IP 71130.02 000734 Access Control 1,2 8/31/2026 9/3/2026 IP 71130.09 001656 Security Plan Changes 1,2 8/31/2026 9/3/2026 IP 71151 001338 Performance Indicator Verification RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
1,2 9/14/2026 9/18/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 9/14/2026 9/18/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 9/14/2026 9/18/2026 IP 71124.04 000728 Occupational Dose Assessment 1,2 9/14/2026 9/18/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 9/14/2026 9/18/2026 IP 71151 000746 Performance Indicator Verification 1,2 9/28/2026 10/2/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 9/28/2026 10/2/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 9/28/2026 10/2/2026 IP 71124.04 000728 Occupational Dose Assessment 1,2 9/28/2026 10/2/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 9/28/2026 10/2/2026 IP 71151 000746 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION +SG
2 9/21/2026 10/2/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
1,2 12/8/2025 12/12/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
1,2 5/11/2026 5/14/2026 IP 71130.05 000737 Protective Strategy Evaluation 1,2 11/3/2025 11/6/2025 IP 71130.09 001656 Security Plan Changes 1,2 11/3/2025 11/6/2025 IP 71151 001338 Performance Indicator Verification 1,2 4/26/2026 5/1/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 6/7/2026 6/20/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)