Biennial Problem Identification and Resolution Inspection Report 05000338/2023010 and 05000339/2023010
ML23150A252
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/31/2023
From: Matthew Fannon
Division Reactor Projects II
To: Stoddard D
Dominion Energy Virginia, Virginia Electric & Power Co (VEPCO)
References
IR 2023010
Download: ML23150A252 (17)


Text

SUBJECT:

NORTH ANNA POWER STATION - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000338/2023010 AND 05000339/2023010

Dear Daniel Stoddard:

On May 5, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your North Anna Power Station. On May 4, 2023, the NRC inspectors discussed the results of this inspection with Lisa Hilbert, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspection team reviewed the stations problem identification and resolution program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for problem identification and resolution programs.

Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.

Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

Finally, the team reviewed the stations programs to establish and maintain a safety-conscious work environment and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews the team found no evidence of challenges to your organizations safety-conscious work environment. Your employees appeared willing to raise nuclear safety concerns through at least one of the several means available.

No findings or violations of more than minor significance were identified during this inspection.

May 31, 2023 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Matthew S. Fannon, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 05000338 and 05000339 License Nos. NPF-4 and NPF-7

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000338 and 05000339

License Numbers:

NPF-4 and NPF-7

Report Numbers:

05000338/2023010 and 05000339/2023010

Enterprise Identifier:

I-2023-010-0030

Licensee:

Dominion Energy (Virginia Electric Company)

Facility:

North Anna Power Station

Location:

Mineral, VA

Inspection Dates:

April 17, 2023 to May 5, 2023

Inspectors:

J. Seat, Senior Project Engineer

N. Smalley, Resident Inspector

D. Turpin, Resident Inspector

A. Wilson, Senior Project Engineer (Team Leader)

Approved By:

Matthew S. Fannon, Chief

Reactor Projects Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at North Anna Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES - BASELINE

71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 03.04)

(1) The inspectors performed a biennial assessment of the effectiveness of the licensees Problem Identification and Resolution program, use of operating experience, self-assessments and audits, and safety conscious work environment.

Problem Identification and Resolution Effectiveness: The inspectors assessed the effectiveness of the licensees Problem Identification and Resolution program in identifying, prioritizing, evaluating, and correcting problems. The inspectors conducted an in-depth corrective action program review of the following systems or portions thereof: emergency diesel generators, service water, high head safety injection, and control room and emergency switchgear room HVAC. The inspectors also conducted a five-year review of equipment aging issues.

Operating Experience: The inspectors assessed the effectiveness of the licensees processes for use of operating experience.

Self-Assessments and Audits: The inspectors assessed the effectiveness of the licensees identification and correction of problems identified through audits and self-assessments.

Safety Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment.

INSPECTION RESULTS

Assessment 71152B 1) Corrective Action Program Effectiveness

Problem Identification: The inspectors determined that the licensee was generally effective in identifying problems and entering them into the corrective action program, and there was a low threshold for entering issues into the corrective action program. This conclusion was based on a review of the requirements for initiating condition reports as described in licensee procedure PI-AA-200, Corrective Action. Additionally, site management was actively involved in the corrective action program and focused appropriate attention on significant plant issues. The inspectors documented one observation regarding a delay in entering conditions adverse to quality into the corrective action program. The observation is discussed in detail in the Inspection Results section of this report. The licensee initiated condition report (CR) 1227223 based on this observation.

Problem Prioritization and Evaluation: Based on the review of condition reports, work orders, and work requests, the inspectors concluded that problems were prioritized and evaluated in accordance with licensee guidance. The inspectors determined that adequate consideration was given to system or component operability and associated plant risk. The inspectors determined that, in general, plant personnel had conducted cause evaluations in compliance with the licensees corrective action program procedures and cause determinations were appropriate, and considered the significance of the issues being evaluated.

Corrective Actions: Based on a review of corrective action documents, interviews with licensee staff, and verification of completed corrective actions, the inspectors determined that, generally, corrective actions were timely, commensurate with the safety significance of the issues, and effective, in that conditions adverse to quality were corrected. The team determined that the licensee was generally effective in developing corrective actions that were appropriately focused. The inspectors noted that while issue evaluations were generally sound, there were several examples where additional research was needed to verify that the appropriate corrective actions were taken, primarily due to a lack of clear documentation.

Based on the samples reviewed, the team determined that the licensees corrective action program complied with regulatory requirements and self-imposed standards. The licensees implementation of the corrective action program adequately supported nuclear safety.

2) Operating Experience

The team determined that the stations processes for the use of industry and NRC operating experience information were effective and complied with regulatory requirements and licensee standards. The implementation of these programs adequately supported nuclear safety. The team concluded that operating experience was adequately evaluated for applicability and that appropriate actions were implemented in accordance with applicable procedures.

3) Self-Assessments and Audits

The inspectors determined that the licensee was effective at performing self-assessments and audits to identify issues at a low level, properly evaluated those issues, and resolved them commensurate with their safety significance. The self-assessments and audits were adequately self-critical and performance-related issues were being appropriately identified. The inspectors verified that action requests were created to document areas for improvement and findings and verified that actions generally had been completed consistent with those recommendations.

4) Safety-Conscious Work Environment Employees interviewed appeared willing to raise nuclear safety concerns through at least one of the several means available. Based on interviews with plant staff and reviews of the latest safety culture survey results, the team found no evidence of challenges to a safety conscious work environment.

Observation: Delay In Initiating Condition Reports For Conditions Adverse To Quality 71152B The inspectors observed three examples of delays in entering NRC identified conditions adverse to quality into the corrective action program. During the first week of the inspection, the inspection team identified issues during plant walkdowns that were communicated to licensee staff on April 20. The inspection team questioned a scaffold built in the service water pump house, where the scaffold did not have the semiannual inspection completed in accordance with procedure MA-AA-105, Scaffolding. The inspection team also questioned a catch container that had been hung in the auxiliary service water pump house, where the material should have been documented using a transient loading permit. These two NRC identified issues were known to licensee staff but were not placed into the corrective action program until May 2.

The inspectors also identified transient combustible material in the Unit 1 control room HVAC room. Specifically, a mop, bucket, and chair were identified in this room during an NRC walkdown on April 19. The inspectors questioned if this material should have required a fire transient loading sheet and if it was an appropriate storage location for the combustible material. The combustible material remained in the room through May 1 and a condition report was not entered into the corrective action program until May 4. The response received from licensee staff indicated that this material can be considered routine, permanent, day-to-day materials, which would be exempt from the requirements of CM-AA-FPA-101, Control of Combustible and Flammable Materials. However, the inspectors observed that permanent day-to-day materials are not defined in calculation ETE-NA-2011-021 (Evaluation of Permanently Stored Combustible Material), and the specific materials identified by the NRC were not listed by example in Attachment 1 of ETE-NA-2011-021, which represents the baseline for permanently stored combustible material. Regardless of the classification of the materials, the significance of this observation is minor based on the added mass of about 20 pounds of the items is considered negligible and has no impact to the Equivalent Fire Severity (EFS) of the area.

The inspectors noted that since these issues were not entered into the corrective action program until 12 - 15 days after the identification of the issue, there may have been a missed opportunity to receive a timely review by station management and operations staff, particularly to be screened for operability or potential impact on the plant. In this case, following review of the CRs by the station it was determined that there was no safety impact for the three issues identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On May 4, 2023, the inspectors presented the biennial problem identification and resolution inspection results to Lisa Hilbert, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EP-0017

Combustible Loading Analysis North Anna Power Station,

Units 1 and 2

Rev. 22

ETE-CCE-2022-

0001

Implementation of Spent Fuel Cask Orientation Controls that

Conform to Original Licensing Basis

Rev. 0

Calculations

ETE-NA-2011-

21

Evaluation of Permanently Stored Combustible Material

Rev. 9

71152B

Corrective Action

Documents

CA11083924,

CA11108563,

CA11113092,

CA11214300,

CA11221094,

CA11221094,

CA11246090,

CA11328250,

CA11348778,

CA11431126,

CA1173379,

CA7612615,

CA8114916,

CA8457089,

CA8539011,

CA8543311,

CA8587871,

CA8591611,

CA8608563,

CA9178937,

CR1043540,

CR1055192,

CR1062889,

CR1097220,

CR1125435,

CR1126356,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR1136138,

CR1136938,

CR1138336,

CR1144530,

CR1149974,

CR1158147,

CR1162008,

CR1162240,

CR1166315,

CR1169253,

CR1169816,

CR1169889,

CR1169991,

CR1171277,

CR1171926,

CR1172237,

CR1173212,

CR1173394,

CR1173507,

CR1173825,

CR1174192,

CR1174622,

CR1174823,

CR1175205,

CR1175836,

CR1176116,

CR1176214,

CR1176575,

CR1176804,

CR1177032,

CR1177199,

CR1177249,

CR1177773,

CR1177824,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR1178210,

CR1178801,

CR1178906,

CR1179130,

CR1179442,

CR1179746,

CR1181190,

CR1181355,

CR1181542,

CR1182013,

CR1182197,

CR1182226

CR1182755,

CR1182825,

CR1183419,

CR1183893,

CR1184295,

CR1184427,

CR1184816,

CR1185017,

CR1187508,

CR1187510,

CR1188701,

CR1189232,

CR1189390,

CR1191508,

CR1193192,

CR1193959,

CR1194892,

CR1195347,

CR1195511,

CR1198094,

CR1198530,

CR1198941,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR1199000,

CR1199293,

CR1199453,

CR1200985,

CR1201209,

CR1201215,

CR1201299,

CR1201308,

CR1201515,

CR1201901,

CR1202614,

CR1203090,

CR1203216,

CR1203804,

CR1203956,

CR1204718,

CR1204953,

CR1205215,

CR1205378,

CR1205485,

CR1205695,

CR1205741,

CR1206541,

CR1207076,

CR1207336,

CR1208331,

CR1208534,

CR1209396,

CR1209567,

CR1209626,

CR1210037,

CR1210274,

CR1210277,

CR1210660,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR1211117,

CR1212304,

CR1213394,

CR1213473,

CR1213487,

CR1213830,

CR1214487,

CR1214742,

CR1214932,

CR1214938,

CR1215118,

CR1215319,

CR1216422,

CR1216605,

CR1216926,

CR1217001,

CR1217212,

CR1217421,

CR1217512,

CR1217588,

CR1217714,

CR1217751,

CR1218441,

CR1218825,

CR1219118,

CR1219832,

CR1219875,

CR1221182,

CR1221343,

CR1223140

CR1225269

Dry Boric Acid Observed in the Packing Area of 1-CH-MOV-

289A - NRC identified

Corrective Action

Documents

Resulting from

Inspection

CR1225270

Dry Boric Acid Observed in the Packing Area of 1-CH-MOV-

289B - NRC identified

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR1225274

Dry Boric Acid Observed in the Packing Area of 2-CH-MOV-

289A - NRC identified

CR1225277

Dry Boric Acid Observed in the Packing Area of 1-SI-MOV-

1864B - NRC identified

CR1225278

Dry Boric Acid Observed in the Packing Area of 2-CH-MOV-

289B - NRC identified

CR1225279

Dry Boric Acid Observed in the Packing Area of 1-SI-MOV-

1867B - NRC identified

CR1225282

Purpose of Copper Wire attached to 2-CH-MOV-2289B

Questioned - NRC Identified

CR1225283

Dry Boric Acid Observed in the Packing Area and on one

stud and nut of 2-CH-FCV-2122 - NRC identified

CR1225284

Unlatched Clip Observed on Insulation for 1-CH-FL-1

CR1225286

Dry Boric Acid Observed in the Packing Area of 1-CH-FCV-

1113A - NRC identified

CR1225288

Dry Boric Acid Observed in the Packing Area of 1-CH-FCV-

22 - NRC identified

CR1225289

Dry Boric Acid Observed in the Packing Area of 2-CH-FCV-

2113A - NRC identified

CR1225291

Dry Boric Acid Observed in the Packing Area of 1-CH--288 -

NRC identified

CR1226877

Hand rail not inspected - NRC identified

CR1226912

Transient Fire Loading sheet not used in ASWPH - NRC

identified

CR1227223

23 NRC PI&R Exit Meeting Observation

CR1227226

23 NRC PI&R Exit Meeting Comments

CR1227227

23 NRC PI&R Exit Meeting Minor Violation

CR1227231

NRC Identified Transient Combustibles in Unit 1 HVAC

Room on 4/19/2023

Unit 1 Cycle 29 Refueling Outage Safety Plan Review

08/11/2022

1R29 Risk Charter

Miscellaneous

SBDB-NAPS-HC

System Design Basis Document for Control Room

Ventilation System

Rev. 25

Procedures

0-ICM-SEC-MIS-

Instrument Corrective Maintenance

Rev. 6

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

001

0-MCM-1110-01

Removal of Reactor Vessel Head

Rev. 51

0-OP-5.50

NUHOMS EOS 37 PTH Dry Shielded Canister Loading and

Handling

Rev. 4

1-OP-4.1

Controlling Procedure for Refueling

Rev. 96

CM-AA-FPA-100

Fire Protection / Appendix R (Fire Safe Shutdown) Program

Rev. 20

CM-AA-FPA-101

Control of Combustible and Flammable Materials,

Rev. 15

EC-AA-110

Identifying and Addressing Nuclear Safety and Quality

Concerns

Rev. 1

ER-AA-102

Preventive Maintenance Program

Rev. 16

ER-AA-MRL-100

Implementing Maintenance Rule

Rev. 15

ER-AA-SYS-1001

System Health Report

Rev. 13

ER-AP-BAC-101

Boric Acid Corrosion Control Program Inspections

Rev. 16

NF-AA-PRA-370

Probabilistic Risk Assessment Procedures and Methods:

MRule (a)(4) Risk Monitor Guidance

Rev. 22

OP-AA-100

Conduct of Operations

Rev. 46

OP-AA-102

Operability Determination

Rev. 17

PI-AA-100-1003

Self Evaluation and Trending

Rev. 26

PI-AA-100-1004

Self-Assessments

Rev. 14

PI-AA-100-1007

Operating Experience Program

Rev. 19

PI-AA-200

Corrective Action

Rev. 40

PI-AA-300

Cause Evaluation

Rev. 18

PI-AA-300-3001

Root Cause Evaluation

Rev. 14

PI-AA-300-3004

Cause Evaluation Methods

Rev. 7

PI-AA-300-3007

Level of Effort Evaluation

Rev. 2

VPAP-0809

NUREG-0612 Heavy Load Program

Rev. 11

WM-AA-100

Work Management

Rev. 37

Maintenance Rule (a)(3) Periodic Assessment for the period

of 3/1/2020 to 9/1/2021

Q4-2022 Safety Injection System Health Report

04/03/2023

Audit 21-05

Corrective Action, Independent Review, and License

Conditions

Self-Assessments

Audit 21-06

Nuclear Training

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Audit 21-08

NAPS Fire Protection QA Program and Implementation

Audit 21-11

Offsite Dose Calculation Manual, Radiological Environmental

Monitoring Program, Environmental Protection Plan, & SPS

Refueling

Audit 22-01

Cyber Security, Fitness For Duty, and Unescorted Access

Authorization

Audit 22-02

Emergency Preparedness

Audit 22-06

Radiological Protection, Process Control Program, and

Chemistry

Audit 22-07

Operations

Audit 22-09

Maintenance

PIR1163886

Self Assessment on Operator Fundamentals

PIR1164272

21 Pre-PI&R Assessment

PIR1173243

IN 21-01, Lessons Learned from U.S. Nuclear Regulatory

Commission Inspections of Design-Basis Capab

PIR1178557

21 Teams DBAI Self-Assessment (NAPS)

PIR1179188

IN21-03, Operating Experience Related to the Duane Arnold

Energy Center Derecho Event on August 10, 2021

PIR1179189

IN21-02, Recent Issues Associated with Monitoring

Occupational Exposure to Radiation from Licensed

PIR1182118

21 Mid-Cycle Report

PIR1185894

21 EDG Self Assessment

PIR1185894

Perform a SA on the station EDG. Focus on improving

existing processes

PIR1191629

Part 21 2021-28-00 Callaway

PIR1199649

22 Pre-NRC Exercise Inspection

PIR1200431

23 Pre-PI&R Assessment

PIR1204788

Radiation Protection Program Review

PIR1217898

RP Department Self-Assessment on Communication and

Implementation of Operating Experience

PIR1220138

Part 21 2022-26-01 - Flowserve-Limitorque - Interim Report

Notification Regarding Peerles

Work Orders

WO59203398649,

WO59203323837,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

WO59203388524,

WO59203397751,

WO59203306992