IR 05000338/2021402

From kanterella
Jump to navigation Jump to search
Unit and 2 - Security Baseline Inspection Report 05000338/2021402 and 05000339/2021402
ML21146A119
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/25/2021
From: Jannette Worosilo
NRC/RGN-II
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
References
IR 2021402
Download: ML21146A119 (8)


Text

May 25, 2021

SUBJECT:

NORTH ANNA POWER STATION, UNIT 1 & 2 - SECURITY BASELINE INSPECTION REPORT 05000338/2021402 AND 05000339/2021402

Dear Mr. Stoddard:

On April 29, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at North Anna Power Station, Unit 1 & 2 and discussed the results of this inspection with Mr. F.

Mladen and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jannette Worosilo, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000338 and 05000339 License Nos. NPF-4 and NPF-7

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000338 and 05000339

License Numbers:

NPF-4 and NPF-7

Report Numbers:

05000338/2021402 and 05000339/2021402

Enterprise Identifier: I-2021-402-0014

Licensee:

Virginia Electric and Power Company

Facility:

North Anna Power Station, Unit 1 & 2

Location:

Mineral, VA

Inspection Dates:

April 26, 2021 to April 30, 2021

Inspectors:

J. Brown, Physical Security Inspector

R. Patterson, Physical Security Inspector

Approved By:

Jannette Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at North Anna Power Station, Unit 1 &

2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin teleworking. The inspection documented below was completed through a combination of remote and onsite inspection.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 02.06 a - d, 02.07 a, 02.08 a - e
  • Tier III: 02.09

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:

Protective Strategy Evaluation (1 Sample)

(1)

  • Tier I: 02.03 a and 02.04 a - e
  • Tier II: 02.07 a - e
  • Tier III: 02.08 and 02.11 a

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revision(s) 33, 34 and 35 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17) (1 Sample)

(1) Units 1 and 2: January 2020 through April

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 29, 2021, the inspectors presented the security baseline inspection results to Mr. F. Mladen and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

20-1149506

20-1149578

Procedures

EPIP-5.05

Site Evacuation or Company Dismissal

OP-AA-100

Conduct of Operations

SY-AA-106

Security Safeguards Information, Security-Related

Information, and Controlled Unclassified Information

SY-AA-109

Security Compliance Reviews and Screening

SY-AA-118

Owner Controlled Area Access Control

SY-AA-119

Protected Area Access Control

SY-AA-SCPIP-

20

Safeguards Contingency Plan Implementing Procedure

71130.05

Corrective Action

Documents

Resulting from

Inspection

CR 2021 -

1170172

CR 2021-

1171240

Procedures

SY-AA-TR-201

Security Drill and Exercise

71151

Corrective Action

Documents

20-1138922

20-1146509

20-1147438

20-1149478

20-1150488

20-1162945

20-1163824

20-1168436

21-1167629

Procedures

SY-AA-126

Regulatory Assessment Performance Indictor Data Reporting

Work Orders

21-59203303146

Security Maintenance 2020