February 10, 2021

SUBJECT:

NORTH ANNA POWER STATION, UNIT 1 & 2 - SECURITY BASELINE INSPECTION REPORT 05000338/2021401, 05000339/2021401, 07200016/2021401, AND 07200056/2021401

Dear Mr. Stoddard:

On January 26, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at North Anna Power Station, Unit 1 & 2 and discussed the results of this inspection with Mr. F.

Mladen and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James C. Shehee, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-338, 50-339,72-016 and 72-056

License Nos. NPF-4 and NPF-7

Enclosure:

As stated

REGION II==

INSPECTION REPORT

Enclosure

Docket Numbers:

05000338, 05000339, 07200016, 07200056

License Numbers:

NPF-4 and NPF-7

Report Numbers:

05000338/2021401, 05000339/2021401, 07200016/2021401, and 07200056/2021401

Enterprise Identifier: I-2021-401-0021

I-2021-401-0022

I-2021-401-0023

Licensee:

Virginia Electric and Power Company

Facility:

North Anna Power Station, Unit 1 & 2

Location:

Mineral, VA

Inspection Dates:

January 11, 2021 to January 13, 2021 (Dominion Corporate Office)

January 25, 2021 to January 26, 2021 (North Anna Onsite)

Inspectors:

R. Patterson, Physical Security Inspector

J. Justice, Senior Physical Security Inspector

Approved By:

James C. Shehee, Chief Plant Support Branch Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at North Anna Power Station, Unit 1 &

2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

REPORT DETAILS

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin teleworking. The inspection documented below was completed through a combination of remote and onsite inspection.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

(1)

  • Tier I: All requirements
  • Tier II: None
  • Tier III: 02.09

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection elements:

(1)

  • Tier I: All requirements
  • Tier II: 02.05(a, d, e, h, i, j, k, l), 02.06(b, d, e, f, g), 02.07(a, c, d)
  • Tier III: 02.10, 02.11(a)

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations (1 Sample)

The inspector evaluated the physical security requirements for independent spent fuel storage installation programs.

(1) All inspection requirements for this IP dated October 6, 2020 were completed.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 26, 2021, the inspectors presented the security baseline inspection results to Mr. F. Mladen and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Corrective Action

Documents

1088855

1092847

1139928

1140043

Procedures

SY-AA-115

Personnel Processing and Access to Station Facilities

SY-AA-UAA-101

Unescorted Access Authorization Program

SY-AA-UAA-102

Personally Identifiable Information Breach Incident Response

Plan

Self-Assessments

Fleet AA and FFD Nuclear Oversight Audit

4/6/20

PIR1137794

Access Services Self-Assessment

2/19/2019

PIR1161028

NAPS Protective Services Security Program Self-

Assessment

4Q2020

71130.08

Miscellaneous

Dominion Fleet Behavior Observation Program Training and

KAs

Procedures

SY-AA-FFD-101

Fitness for Duty Program

SY-AA-FFD-102

Fitness for Duty Program Administration

SY-AA-FFD-103

Drug and Alcohol Collection

SY-AA-FFD-104

Drug and Alcohol Testing Program Administration

SY-AA-FFD-105

Fitness for Duty Onsite Testing

SY-AA-FFD-106

Fitness for Duty Testing Blind Proficiency Sample Processing 2

81311

Corrective Action

Documents

20-1161081

20-1161082

21-1164462

Procedures

North Anna Security Plan

SY-AA-116

Maintenance, Testing, and Calibrations

SY-AA-117

Security Program

SY-AA-118

Owner Controlled Area Access Control

SY-AA-119

Protected Area Access Control

SY-AA-120

Operability Testing

SY-AA-124

Alarm Response

SY-AA-131

Spent Fuel Transportation

SY-AA-SCPIP-

24

Compensatory Measures

SY-AA-SCPIP-

26

Response to ISFSI

5