IR 05000335/1991201

From kanterella
Jump to navigation Jump to search
Disagrees W/Two Deficiencies Re Inservice Testing Program Noted in Insp Repts 50-335/91-201 & 50-389/91-201. Preoperational Test Procedure Areas of Concern Do Not Represent Anomolies or Inconsistencies
ML17223B392
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/23/1991
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-342, NUDOCS 9201020011
Download: ML17223B392 (5)


Text

ACCELERATED DISTjGBUTION DEMONSTPWTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ESSION NBR:9201020011 DOC.DATE: 91/12/23 NOTARIZED:

NO CIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2,,Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Do'cument Control Desk)DOCKET 05000335 05000389 SUBJECT: Disagrees w/tw'o deficiencies re inservice testing program noted in Insp Repts 50-335/91-201

&50-389/91-201.

D Preoperational test procedure areas of concern do not represent anomolies or inconsistencies.

8 DISTRIBUTION CODE: A065D COPIES RECEIVED:LTR ENCL SIZE:/TITLE: Generic Ltr 89-13-Svc Water Sys Problems Affecting Safety-Related E A NOTES: RECIPIENT ID CODE/NAME NORRIS,J INTERNAL: CHU,A NRR/PDl-3 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME EG FILE 0 NSIC COPIES LTTR ENCL D D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TAL NUMBER OF COPIES REQUIRED: LTTR 5 ENCL D D h

P.O.Box 128, Ft.Pierce, FL 34954-0128

'IPIL December 23, 1991 L-91-342 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Service Water System Operational Ins ection Re ort 91-201 Florida Power and Light Company (FPL)received inspection report 91-201 on November 26, 1991.FPL has reviewed this report and has concerns with several of the conclusions reached by the Nuclear Regulatory Commission Inspection Team.FPL believes the requirements of GL 89-13 were being implemented in a satisfactory manner.FPL performed a review of the licensing-basis contained in the Unit 2 FSAR as required by GL 89-13.The Unit 1 review was not scheduled to be complete until after the Fall 1991 Unit 1 outage.FPL also performed a thorough review of the training materials associated with ICW as required by GL 89-13.(Deficiencies 91-201-01 and 91-201-02)

FPL tests the'C'CW pump in accordance with the plant's Technical Specifications.

Therefore, satisfactory surveillance-results document that the operability-of the'C'CW pump has been adequately demonstrated.(Deficiency 91-201-03)

FPL does not agree with the two items listed as deficiencies to our Inservice Testing program.(Deficiency 91-201-04)

It is FPL's view that the Preoperational Test procedure areas of concern do not represent anomalies or inconsistencies because the stated acceptance criteria were satisfied by these tests.(unresolved item 91-201-01)

~20iOr~OQji yiingp-r Apocg aaooossa PDR an FPL Group company ff St.Lucie Units 1 and 2 Service Water System Operational Inspection Report 91-201 Page two In conclusion, FPL would appreciate the opportunity to meet with the NRC and discuss our position on these items.Very truly yours, D.A.Vice P St.u ager esident ie Plant DAS/JWH/kw cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant DAS/PSL 5590-91