IR 05000331/1993016

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-331/93-16
ML20059G493
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/11/1994
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 9401240179
Download: ML20059G493 (1)


Text

{{#Wiki_filter:January 11, 1994 1 , t Docket No. 50-331 License No. DPR-49 , Iowa Electric Light and Power Company - ATTN: Mr. Lee Liu ,

      '

Chairman of the Board and Chief Executive Officer

.IE Towers P. O. Box 351 Cedar Rapids, IA 52406 SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NO.' 50-331/93016(DRS))

Dear Mr. Liu:

This will acknowledge receipt of your letter dated December 22,.1993, in > response to our letter dated November 2,1993, transmitting a Notice.of Violation associated with' Inspection Report No. 50-331/93016. This report summarized the results of an Engineering and Technical Support inspection at

      ..1 your Duane Arnold facility. We have reviewed your corrective actions and have no further questions at this time. These corrective actions will be examined ;

l during future inspections. ) l

Sincerely, !i Original Signed By G. C. Wright, Chief Engineering Branch cc: D. Wilson, Plant Superintendent - Nuclear K. Young, Manager, Nuclear Licensing OC/LFDCB Resident Inspector, RIII Stephen Brown, Iowa Dept.

of Commerce l Licensing Project Mgr., NRR

'bec: LIC - IE01'

81Il {{II, R II a V d rn t [S r rg 1 Ol/H/94 01/l(/94 01/(/94- t/offyf 9401240179 940111 PDR ADOCK 05000331. -llt g G PDR 2

      ,
      '

m }}