IR 05000331/1993002
| ML20058E602 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 11/24/1993 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Leslie Liu IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| Shared Package | |
| ML20058E604 | List: |
| References | |
| EA-93-276, NUDOCS 9312070074 | |
| Download: ML20058E602 (3) | |
Text
[g.. : <
l
..
. - - -
,
()c.o >
h
._
!
Q&,
p NOV 2 4 743 E
!
Docket No. 50-331 EA No.93-276
,
e Iowa Electric Light and Power
!
'
Company m
.
ATIN:
.Mr. Lee Liu Chairman of the Board u-and Chief Executive
!
-
Officer IE Towers.
P. O. Box 351 l
Cedar Rapids, IA 52406
[
>
Dear Hr. Liu:
SUBJECT: DUANE ARNOLD ENFORCEMENT CONFERENCE j
This refers to an Enforcement Conference conducted by Mr. P. T'ng and other members of the Region III Staff on November 19, 1993, concerning activities at i
the Duane' Arnold Energy. Center, authorized by NRC License No. DPR-49 and to
!
the discussion of our findings with Mr. J. Franz 'and other members of your
!
staff. We have enclosed a report summarizing the discussion.
You will be-notified by separate correspondence of our decision-regarding the-l Enforcement Action-based on the information presented and discussed at the Enforcement Conference. No response is required until you'are notified of the
. proposed Enforcement Action.
?
'In accordance with 10 CFR 2.790 of'the Commission's regulations, a copy of this letter and enclosed inspection report will be placed in the NRC Public
Document Room.
We will gladly discuss any questions you have concerning'this Enforcement
~ Conference.
[
Sincerely, l
.
3).
"Orginal signed by Cynthia D. Peduson" ADO s
G
. PDft W. L. Axelson, Director t
Division of Radiction Safety and Safeguards j
Enclosures:
o 1.
Enforcement Conference
,
-No. 50-331/93022(DRSS)
_
j
'
2.
Appendix A, Licensee Presentatic.n Material (13 p les)-
See Attached Distribution (SEE ATTACHED SHEET)
RIII RI I RI RIII.
RI I RI ci J
!
W
.
. 9.D$
/M j.
I-l D
y tte
n Lngury Madeda/sd
, re son 11/29/93 [/d j
-
/_
'
m.
.
.
,
Docket No. 50-331 EA No.93-276
Iowa Electric Light and Power Company ATTN: Mr. Lee Liu Chairman of the Board and Chief Executive Officer IE Towers P. O. Box 351 Cedar Rapids, IA 52406
Dear Mr. Liu:
(
SUBJECT: DUANE ARNOLD ENFORCEMENT CONFERENCE This refers to an Enforcement Conference conducted by Mr. P. Ting and other members of the Region III Staff on November 19, 1993, of activities at the Duane Arnold Energy Center, authorized by NRC License No. DPR-49 and to the discussion of our findings with M-J. Franz and other members of your staff.
We have enclosed a report summarizing the discussion.
-You will be notified by separate correspondence of our decision regarding the l
Enforcement Action based on the information presented and discussed at the
,
Enforcement Conference. No response is required until you are notified of the i
proposed Enforcement Action.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
,
this letter and enclosed inspection report will be placed in the NRC Public
Document Room.
!
We will gladly discuss any questions you ha/e concerning this Enforcement Conference.
I
Sincerely,
W. L. Axelson, Director
-
Division of Radiation Safety and Safeguards Enclosures:
1.
Enforcement Conference No. 50-331/93022(DRSS)
2.
Appendix A, Licensee Presentation
'
Material (13 pages)
I'
RI['M See Attached Distribution RIII i
RIII RIII RIII R
Ma
/sd Creed Pederson n s ury D
te Axelson 11/e /93 y 8 l
-
-
-
-
...
-.
.
.
-
..
..
..
-
.,
i
-.,.
!
'
,
!
- Iowa Electric Light and Power
tiGV 2 i N I
Company l
.i
!
Distribution-i i
cc w/ enclosures-
D. Wilson, Plant i
Superintendent - huclear j
K. Young, Manager, Nuclear
Licensing l
OC/LFDCB l
Resident Inspector, RIII
Stephen Brown, Iowa Dept.
of Comerce
!
Licensing Project Mgr., NRR I
!
bec w/ enclosure:
PUBLIC i
,
!
!
i k
!
!
a I
f
$
i i
i i
.!
!
!
!
i
!
-
i
!
>
!
i
i
_
.
.