Forwards Weekly Preliminary Insp Findings to Be Attached to IE Insp Repts 50-329/79-15 & 50-330/79-15
ML19209A763
Person / Time
Site: Midland
Issue date: 09/14/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 7910050350
Download: ML19209A763 (5)


Text

/

%'o,'

UNITED STATES

.

8

NUCLEAR REGULATORY COMMISSION

n

$

E REGION 111

799 ROOSEVELT ROAD o,

GLEN ELLYN. lLLINOIS 60137 g{p14197g

,

%

o

.....

Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:

Mr. Stephen H. Howell Vice President 1945 West Parnall Road Jackson, MI 49201 Gentlemen:

Due to an administrative error, the Weekly Preliminary Inspection Findings (PIF) were not attached to the Midland inspection report; 50-329/79-15, 50-330/79-15 dated August 22, 1979.

Please attach the enclosed PIF forms to the referenced reports.

Sincerely, A

G. Fiore11i, Chief Reactor Construction and Engineering Support Branch Enclosure: As stated cc w/ enc 1:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigaa Public Service Commission Dr. Wayne E. North Myron M. Cherry, Chicago 1126 216 7 910050

OFFICE OF INSPECTION AND ENFORCEMENT

-

,

PRELIMINARY INSPECTION FINDINGS

,

.

1.

LICENSEE 2.

REGIONAL OFFICE Consumers Power Company USNRC 212 West Michigan Avenue Region III Jackson, MI 49201 799 Roosevelt Road Glen Ellyn, IL 60137 3.

DOCKET NUMBERS 4.

LICENSE NUMBERS 5.

DATE OF INSPECTION h

llc 4 /c2j /7 77 50-329 50-330 CPPR-81 CPPR-82

'

6.

Within the scope of the inspection, no items of noncompliance or deviation were found.

,

The following matters are preliminary inspection findings:

7.

&& f M MA S y b h />

"

// DEA

/foCA. J/65A a pos8.6

'

.

.I 8.

These preliminary inspection findings will be reviewed by NRC Supervision /

Hanagement at the Region III Office and they will correspond with you concerning any enforcement action.

Nuclear Regulatory Commission Inspector

.

1126 217

  • OFFICE OF INSPECTION AND ENFORCEMENT

-

.

.

PRE.IMINARY INSPECTION FINDINGS

,

.

1'

1.

LICENSEE 2.

REGIONAL OFFICE Consumers Power Company USNRC 212 West Michican Avenue Region III Jackson, MI 49201 799 Roosevelt Road Glen Ellyn, IL 60137 3.

DOCKET NUMBERS 4.

LICENSE NUMBERS 5.

DATE OF INSPECTION hM 50-329 50-330 CPPR-81 CPPR-82

'#

<]r 6.

Within the scope of the inspection, no items of noncompliance or deviation

'

were found.

.

7.

The following matters are preliminary inspection findings:

,

.'

./

.

8.

These preliminary inspection findings will be reviewed by NRC Supervision /

Management at the Region III Office and they will correspond with you concerning any enforcement action.

Nuclear Regulatory Commission Inspector

.

1i26 218

~

OFFICE OF INSPECTION AND ENFORCEMENT

.

PRELIMINARY INSPECTION FINDINGS

.

1.

LICENSEE 2.

REGIONAL OFFICE Consumers Power Company USNRC 212 West Michigan Avenue Region III Jackson, MI 49201 799 Roosevelt Road Glen Ellyn, IL 60137 3.

DOCKET NLHBERS 4.

LICENSE NUMBERS 5.

DATE OF INSPECTION 50-329 50-330 CPPR-81 CPPR-82 hM IN 7 N t/

6.

Within the : cope of the inspection, no items of noncompliance or deviation were found.

7.

The following matters are preliminary inspection findings:

ufAAb JAd4*&

y jag Mw"

&b &

&&

-

u w&

b

,

I

.

8.

These preliminary inspection fir ' ings vill be reviewed by NPC Supervision /

Management at the Region III C:

ce and they will correspond with you concerning any enforcement act 'on.

Nuclear Regulatory Com=ission Inspector

.

1126 219

.

.

0FFICE OF INSPECTION AND ENFORCEMENT

-

'

PRELIMINARY INSPECTION FINDINGS

l'

1.

LICENSEE 2.

REGIONAL OFFICE Consumers Power Company USNRC 212 West Michigan Avenue Region III Jackson, MI 49201 799 Roosevelt Road Glen Ellyn, IL 60137 3.

DOCKET NLHBERS 4.

LICENSE NUMBERS 5.

DATE OF INSPECTION 50-329 50-330 CPPR-81 CPPR-82 Q

//, /f7f

U U

.]

6.

Within the scope of the inspection, no items of noncompliance or deviation were found.

7.

The following matters are preliminary inspection findings:

8.

These preliminary inspection findings will be reviewed by NRC Supervision /

Management at the Region III Office and they will correspond with you concerning any enforcement action.

Nuclear Regulatory Commission Inspector 1126 220