IR 05000329/1979009
| ML19263E765 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 05/23/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 7906250149 | |
| Download: ML19263E765 (1) | |
Text
r as
'
zw3
/jannaGoq[
UNITED STATES g
NUCLEAR REGULATORY COMMISSION y 't ) r-(
REGION lli
y
-
g cLEN ELLYN. ILUNOIS 60137
- ...*
y_ii 2 3 UU Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:
Mr. Stephen H. Howell Vice President 1945 West Parnall Road Jackson, MI 49201 Gentlemen:
Please replace page two of the Inspection Report numbered 50-329/
79-09; 50-330/79-09 from NRC Region III Reactor Construction and Engineering Support Branch with the attached replacement.
The original contained an error in nomenclature. Thank you.
Sincerely, Qgon h W%
Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch Attachment: Corrected Page 2, Details cc w/ attachment:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Dr. Wayne E. North Myron M. Cherry, Chicago
'
'7906250/99' p
'
d. -
-
DETAILS Persons Contacted
- D. Miller, Site Manager
- J. Corley, Quality Assurance Section Head IE and TV
- B. Peck, Construction Supervisor
- P. Kyner, Field Quality Assurance Engineer D. Horn, Quality Assurance Engineer
- L. Dreisbach, Bechtel Corporation Quality Assurance Engineer
- E. Smith, Bechtel Corporation Quality Assurance Engineer
- D. Hollar, Bechtel Corporation Quality Assurance Engineer
- R. Shope, B&W Project Engineer W. Lee, B&W Construction Site Consultant Numerous other principal staff and personnel were contacted during the reporting period.
- Denotes those present during at least one of the four exit interviews conducted during the report period.
Licensee Action on Previous Inspection Findings (Closed) Item of Noncompliance (329/78-13-02; 330/78-13-02):
B&W field Procedure FCP No. 11 was developed to allow hydraulic tensioners to be used for setting the steam generator and reactor holddown bolts at the pretension level established by Drawing No. 376Q, Revision 8.
During the reporting period, tensioning of Unit 2.
North Steam Generator holddown bolts were witnessed. Ihe above referenced procedure was being applied at this time.
Reportable Deficiencies - 50.55(e) Items Settlement of Diesel Generator Foundations and Structures (Open) Unresolved Item (329/78-13-03; 330/78-13-03); During the reporting period the licensee has informed the Resident Inspection of additional soil borings and data which have been taken pertinent to monitoring the settlement of the diesel generator building. The prelim-inary qualitative results of this data were subsequently relayed to Regional Office Personnel. A Regional Based Inspector performed an inspection onsite on March 28 and 29,1979, to perform a quantitative review of the settlement monitoring program (NRC Inspection Report No.
50-329/79-06; 50-330/79-06).
-2-
,
b~vi