IR 05000327/2016005

From kanterella
(Redirected from IR 05000328/2016005)
Jump to navigation Jump to search
Mid-Cycle Assessment Letter for Sequoyah Nuclear Plant Units 1 and 2, NRC Inspection Report 05000327/2016005, 05000328/2016005
ML16245A189
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/31/2016
From: Joel Munday
Division Reactor Projects II
To: James Shea
Tennessee Valley Authority
References
IR 2016005
Download: ML16245A189 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ust 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2, NRC INSPECTION REPORT 05000327/2016005, 05000328/2016005

Dear Mr. Shea:

On August 10, 2016, the NRC completed its mid-cycle performance review of the Sequoyah Nuclear Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Sequoyah Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix due to one White performance indicator for unplanned scrams which crossed the green-to-white threshold in the third quarter of 2015. All inspection findings had very low (i.e., green)

safety significance, and all other performance indicators for Unit 1 were within the nominal, expected range (i.e., green) during this assessment period. The NRC conducted a supplemental inspection using inspection procedure 95001 for Unit 1 after the end of the assessment period. The results of this inspection and any follow-up assessment will be communicated in separate correspondence.

The NRC determined that overall, Sequoyah Plant Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at the Sequoyah Nuclear Plant Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs ROP Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

Although plant performance was within the Regulatory Response Column for Unit 1 and Licensee Response Column for Unit 2, the NRC has not yet finalized the significance of AV 05000327, 328/2016002-01: Isolation of Fire Suppression System to a Significant Portion of the Plant Site.

The final safety significance determination may affect the NRCs assessment of plant performance and the enclosed inspection plan. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Alan Blamey at (404) 997-4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Joel Munday Division Director Division of Reactor Projects Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 Enclosure: Sequoyah Inspection/Activity Plan (09/01/2016 - 06/30/2018)

cc: Distribution via ListSer

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE CRK1 AJB3 JTM NAME C. Kontz A. Blamey J. Munday DATE 8/5/2016 8/31/2016 8/31/2016 9/ /2016 9/ /2016 9/ /2016 9/ /2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Page 1 of 2 Sequoyah 08/31/2016 07:00:00 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP EXERCISE INSPECTION 5 1, 2 09/12/2016 09/16/2016 IP 7111401 Exercise Evaluation 1, 2 09/12/2016 09/16/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 09/12/2016 09/16/2016 IP 7111408 Exercise Evaluation - Scenario Review 1, 2 09/12/2016 09/16/2016 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSP 2 1, 2 10/03/2016 10/07/2016 IP 7111111B Licensed Operator Requalification Program RP - RP OCCUPATIONAL INSPECTION WEEK 1 2 1, 2 11/06/2016 11/10/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/06/2016 11/10/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/06/2016 11/10/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/06/2016 11/10/2016 IP 71124.04 Occupational Dose Assessment 1, 2 11/06/2016 11/10/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/06/2016 11/10/2016 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 11/07/2016 11/11/2016 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2 3 1, 2 11/14/2016 11/18/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/14/2016 11/18/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/14/2016 11/18/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/14/2016 11/18/2016 IP 71124.04 Occupational Dose Assessment 1, 2 11/14/2016 11/18/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/14/2016 11/18/2016 IP 71151 Performance Indicator Verification SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 11/14/2016 11/18/2016 IP 7111108P Inservice Inspection Activities - PWR TI-191 - MITIGATING STRATEGIES 4 1, 2 03/06/2017 03/10/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 5 1, 2 03/20/2017 03/24/2017 IP 7111105T Fire Protection [Triennial]

1, 2 04/03/2017 04/07/2017 IP 7111105T Fire Protection [Triennial]

ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 05/01/2017 05/05/2017 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Sequoyah 08/31/2016 07:00:00 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RAD HAZARDS 1 1, 2 05/01/2017 05/05/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 06/05/2017 06/09/2017 IP 71152B Problem Identification and Resolution 1, 2 06/19/2017 06/23/2017 IP 71152B Problem Identification and Resolution RP - RP PUBLIC RADIATION SAFETY 3 1, 2 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/10/2017 07/14/2017 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/10/2017 07/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 07/10/2017 07/14/2017 IP 71151 Performance Indicator Verification EP - EP PROGRAM INSPECTION 3 1, 2 09/11/2017 09/15/2017 IP 7111402 Alert and Notification System Testing 1, 2 09/11/2017 09/15/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 09/11/2017 09/15/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 09/11/2017 09/15/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 09/11/2017 09/15/2017 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 10/30/2017 11/03/2017 V23503 SEQUOYAH DECEMBER 2017 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM 3 1 12/04/2017 12/15/2017 V23503 SEQUOYAH DECEMBER 2017 INITIAL EXAM AT POWER FACILITIES ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 05/14/2018 05/18/2018 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 05/21/2018 05/25/2018 IP 7111108P Inservice Inspection Activities - PWR MODS - PLANT MODIFICATIONS INSPECTION 3 1, 2 06/11/2018 06/15/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/25/2018 06/29/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.