September 14, 2015
SUBJECT:
SEQUOYAH NUCLEAR PLANT - NRC EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS AND PERMANENT PLANT MODIFICATIONS INSPECTION REPORT 05000327/2015007 AND 05000328/2015007
Dear Mr. Shea:
On July 31, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Sequoyah Nuclear Plant, and discussed the results of this inspection with Mr. Carlin and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
NRC inspectors documented five findings of very low safety significance (Green) in this report.
Five of these findings involved violations of NRC requirements; one of these violations was determined to be Severity Level IV under the traditional enforcement process.
If you contest the violations or significance of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Sequoyah Nuclear Plant.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; and the NRC resident inspector at the Sequoyah Nuclear Plant.
In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room)
Sincerely,
/RA/
Jonathan H. Bartley, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos.: 05000327, 05000328 License Nos.: DPR-77, DPR-79
Enclosure:
Inspection Report 05000327/2015007 and 05000328/2015007 w/Attachment:
Supplementary Information
REGION II==
Docket Nos.:
50-327, 50-328
License Nos.:
Report Nos.:
05000327/2015007, 05000328/2015007
Licensee:
Tennessee Valley Authority (TVA)
Facility:
Sequoyah Nuclear Plant, Units 1 and 2
Location:
Soddy-Daisy, TN 37379
Dates:
July 20 to 31, 2015
Inspectors:
T. Fanelli, Reactor Inspector (Team Leader)
D. Terry-Ward, Construction Inspector
P. Carman, Construction Inspector
J. Bennett, (Intern)
Approved by:
Jonathan H. Bartley, Chief
Engineering Branch 1
Division of Reactor Safety
SUMMARY
Inspection Report (IR) 05000327/2015007, 05000328/2015007; 07/20-31/15; Sequoyah Nuclear
Plant Units 1 & 2; NRC Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications.
This report covers a two-week, on-site inspection by three regional inspectors. The inspectors identified one severity level (SL) IV non-cited violation (NCV), and four Green NCVs. The significance of inspection findings is indicated by their color (Green, White, Yellow, Red) using the NRC Inspection Manual Chapter (IMC) 0609, Significance Determination Process, dated June 2, 2011. Cross-cutting aspects are determined using IMC 0310, Components Within the Cross Cutting Areas, dated December 04, 2014. All violations of NRC requirements are dispositioned in accordance with the NRCs Enforcement Policy, dated January 28, 2013. The Nuclear Regulatory Commissions (NRCs) program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process,
Revision 4, dated December 200
NRC-Identified and Self-Revealing Findings
Cornerstone: Mitigating Systems
Green: The inspectors identified a Green non-cited violation (NCV) of 10 CFR Part 50,
Appendix B, Criterion III, Design Control, for the licensees failure to control safety related calculations that reviewed equipment essential to the function of Class 1E electrical systems. The issue was entered into the licensees corrective action program as CRs 1059281 and 1064042. Planned corrective actions were to revise the calculations.
The inspectors determined that the performance deficiency was determined to be more than minor because it was associated with the Design Control attribute of the Mitigating Systems Cornerstone. The failure to plan and control updates to safety related calculations to review the suitability of new molded case circuit breakers in Class 1E electrical systems adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of the systems that respond to initiating events to prevent undesirable consequences. The finding was determined to have a cross-cutting aspect in the resolution area of Problem Identification and Resolution [P.3], because the licensee failed to take effective corrective actions to address issues in a timely manner commensurate with their safety significance.
(Section 1R17.b.1)
Green: The inspectors identified a Green non-cited violation (NCV) of 10 CFR 50 Appendix B Criterion III, Design Control, for the licensees failure to ensure that plant licensing and design basis for shared Class 1E electrical systems were controlled and maintained. The licensing and design basis of shared electrical systems required mechanical interlocks to prevent an operator error that could parallel these diverse power sources in accordance with IEEE 308-1971 and Regulatory Guides 1.81 and 1.6. A modification removed the kirk-key interlocks. The issue was entered into the licensees corrective action program as CR 1064736. The licensee has administrative controls in place to limit the risk of this configuration pending determination of corrective actions.
The inspectors determined that the performance deficiency was more than minor because it was associated with the Design Control attribute of the Mitigating Systems Cornerstone and the removal of mechanical interlocks that separated diverse shared electrical systems adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences.
The finding was determined to have a cross-cutting aspect in the conservative bias area of Human Performance [H.14] because the licensees decision making-practices did not emphasize prudent choices over those that are simply allowable. (Section 1R17.b.2)
SLIV: The inspectors identified a SLIV violation of 10CFR 50.59.c.(2).ii, Changes, tests and experiments, for the licensees failure to obtain a license amendment prior to implementing a change to the onsite emergency and shutdown AC electric systems supplying the shared Essential Raw Cooling Water (ERCW) systems. The change removed the kirk key interlocking system from the tie breakers that originally prevented an operator error that would parallel the Unit 1A and Unit 2A 480V AC motor control centers (MCCs). The issue was entered into the licensees corrective action program as CR 1076179. The licensee has administrative controls in place to limit the risk of this configuration pending determination of corrective actions.
The inspectors determined that the performance deficiency was more than minor because there was a reasonable likelihood that the change required Commission review and approval prior to implementation and the failure to request approval impacted the regulatory process. Specifically, the departure from acceptance criteria identified in IEEE 308, RG 1.81, and RG 1.6 more than minimally increased the likelihood of occurrence of an ERCW power train malfunction. (Section 1R17.b.3)
Green: The inspectors identified three examples of a Green non-cited (NCV) of 10 CFR 50 Appendix B, Criterion XVI, Corrective Action, for the licensees failure to identify and correct a conditions adverse to quality that were associated with processes for evaluating Class 1E critical characteristics for molded case circuit breakers. The issue was entered into the licensees corrective action program as CRs 1064483, 1064744, 1064479, 1059273 and 1064731. Planned corrective actions were to update procedures to document critical thinking in evaluating CRs and include additional critical characteristics.
The inspectors determined that the performance deficiency was more than minor because it was associated with the Equipment Performance attribute of the Mitigating Systems Cornerstone and the failure to identify and correct nonconformances in Class 1E equipment and the failure to resolve adverse conditions with evaluating Class 1E critical characteristics adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences.
The finding was determined to have a cross-cutting aspect in the change management area of Human Performance [H.3] because Leaders failed to use a systematic process for evaluating and implementing change so that nuclear safety remains the overriding priority.
(Section 1R17.b.4)
Green: The inspectors identified a Green non-cited violation (NCV) of 10 CFR Part 50,
Appendix B, Criterion III, Design Control, for the licensees failure to verify the adequacy of defined shelf life and design life characteristics of Class 1E electrical equipment. The issue was entered into the licensees corrective action program as CR 1064785.
The inspectors determined that the performance deficiency was more than minor because it was associated with the Design Control attribute of the Mitigating Systems Cornerstone and the failure to ensure the Class 1E static and dynamic performance characteristics were identified and evaluated adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of the SSCs that responds to initiating events to prevent undesirable consequences. The finding was determined to have a cross-cutting aspect in the change management area of Human Performance [H.3] because Leaders failed to use a systematic process for evaluating and implementing change so that nuclear safety remains the overriding priority. (Section 1R17.b.5)
REPORT DETAILS
REACTOR SAFETY
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
1R17 Evaluations of Changes, Tests, Experiments and Permanent Plant Modifications
a. Inspection Scope
Evaluations of Changes, Tests, and Experiments: The inspectors reviewed eight safety evaluations performed pursuant to Title 10, Code of Federal Regulations (CFR) 50.59, Changes, tests, and experiments, to determine if the evaluations were adequate and that prior NRC approval was obtained as appropriate. The inspectors also reviewed 18 screenings where licensee personnel had determined that a 10 CFR 50.59 evaluation was not necessary. The inspectors reviewed these documents to determine if:
- the changes, tests, or experiments performed were evaluated in accordance with 10 CFR 50.59 and that sufficient documentation existed to confirm that a license amendment was not required;
- the safety issues requiring the changes, tests or experiments were resolved;
- the licensee conclusions for evaluations of changes, tests, or experiments were correct and consistent with 10 CFR 50.59; and
- the design and licensing basis documentation used to support the change was updated to reflect the change.
The inspectors used, in part, Nuclear Energy Institute (NEI) 96-07, Guidelines for 10 CFR 50.59 Implementation, Revision 1, to determine acceptability of the completed evaluations and screenings. The NEI document was endorsed by the NRC in Regulatory Guide 1.187, Guidance for Implementation of 10 CFR 50.59, Changes, Tests, and Experiments, dated November 2000.
This inspection constituted 7 evaluation samples and 13 screening and/or applicability determination samples as defined in Inspection Procedure (IP) 71111.17-04.
Permanent Plant Modifications: The inspectors reviewed 10 permanent plant modifications that had been installed in the plant during the last three years. The modifications reviewed are listed below:
- DCN 23082, Option To Use Either GE Breaker Model TFJ236J110WL or TFJ236J125WL
- DCN 23288, Replace Undersized Thermal Overload Units With Properly Sized Units
- DCN 23070, Replace Motor SQN-2-MTRB-063-0073-BEC 242408, Containment Spray Pump Full Flow Recirculation Modification, Rev. 0
- DCN 23216-03, Modify Handswitch SQN-2-HS-062-0108C-A
- DCN 22386-03, Modify SQN-2-FCV-001-0022 -T Internals (Poppet Cover & Stem) &
Install Packing
- DCN 22546-11, Fire Area FAA-054, Room 714-A01, Ab Corridor: Install 3-Way Valve For 2-LCV-3-156, -164 to Allow A Local Means of Venting off the Air to the LCV
- DCN 23396, Issue Design Output Portion of the EOP Setpoint Calculation SQS20110.
- DCN 22546-06, To Credit 690-A1 and 714-A1 For TDAFWP 2S-S, Cables 2SG229S, 2SG250S, 2SG251S, and 2SG252S Will Be Rerouted to Avoid 714-A1 and 690-A1.
These Will Instead Be Routed Through the Control Bldg On Elevation 706, and 685.
- DCN 22889-18, This DCN Will Replace the Custom Pull Up Module. Rack 2-R-5
- DCN 23492, Replace Obsolete RWST Level Transmitter
The modifications were selected based upon risk significance, safety significance, and complexity. The inspectors reviewed the modifications selected to determine if:
- the supporting design and licensing basis documentation was updated;
- the changes were in accordance with the specified design requirements;
- the procedures and training plans affected by the modification had been adequately updated;
- the test documentation as required by the applicable test programs had been updated; and
- post-modification testing adequately verified system operability and/or functionality.
The inspectors also used applicable industry standards to evaluate acceptability of the modifications and performed walkdowns of accessible portions of the modifications.
Documents reviewed are listed in the Attachment.
This inspection constituted 10 permanent plant modification samples as defined in IP 71111.17-04.
b. Findings
b.1 Failure to maintain control of and update safety related design output documents (electrical calculations)
Introduction:
The inspectors identified a Green non-cited violation (NCV) of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the licensees failure to control safety related calculations that reviewed equipment essential to the function of Class 1E electrical systems.
Description:
The Sequoyah (SQN) Quality Assurance Program (QAP) document Section 7 Design Control, Subsection 7.2.3 Design Analysis, stated, in part, The performance of design analysis shall be planned and controlled. The suitability of application of materials, parts, equipment, and processes essential to the function of a structure, system, or component shall be reviewed to ensure that functional requirements are met.
The inspectors reviewed Procurement Engineering Group (PEG) package 1071185AO that evaluated replacement Cutler-Hammer MDL3800 molded case circuit breakers (MCCBs) for equivalency to existing and obsolete Westinghouse MCCBs. These MCCBs were used in Class 1E applications. The PEG package specified new technical details for the MDL3800 such as new calibrated trip curves that were different from the existing MCCBs. The inspectors determined that SQN-APS-003, 480VAC APS Class 1E Load coordination study, Rev. 79 was not controlled and updated to review the new trip curves for suitability. A similar performance deficiency was identified in the last Triennial Fire Protection Inspection (TFPI) in NCV 2014007-03. In response, the licensee initiated Problem Evaluation Reports (PERs) 848756 and 875748. These PERs identified that PEG packages 1071185AO and 1163452HO specified new technical details for MCCBs that were not updated to applicable safety related calculations including in SQN-APS-003. Because of the inspectors questions, the licensee identified that safety related calculation, D2SDG-P213350, was not updated with the new MCCB technical details specified in PEG package 1163452HO, which was identified in PER 848756. These PERs were referenced in the TFPI report 2014007 as associated with the NCV. The licensee closed these PERs without completing corrective actions to update the calculations.
The inspectors noted that in addition to PEG packages 1071185AO and 1163452HO, Drawing 1, 2-35W716-1 Wiring Diagrams 480V MOT Cont Ctr 1A-A, 2A-A Single Lines, Rev. 27 also referenced PEG package CQL602X-EQIV. The inspectors requested that the licensee confirm that all safety related calculations were updated for the PEGs packages referenced on the drawing. The licensee determined that calculation SQN-APS-003 was not updated to include the new MCCB technical details specified in CQL602X-EQIV. The PERs initiated because of the TFPI violation did not identify this PEG package.
The inspectors determined that the licensee did not plan and control design analyses in safety related calculations (design outputs) to review Class 1E equipment for suitability as specified by the QAP. The licensee initiated condition reports (CRs) 1059281 and 1064042 to assess the findings. Planned corrective actions included updating the calculations.
Analysis:
The licensees failure to assure that the performance of design analysis was planned and controlled and that the suitability of application of parts and equipment essential to the function of a structure, system, or component was reviewed to ensure that functional requirements were met, as specified in the QAP Section 7 Design Control, was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the Design Control attribute of the Mitigating Systems Cornerstone. The failure to plan and control updates to safety related calculations to review the suitability of new molded case circuit breakers in Class 1E electrical systems adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of the systems that respond to initiating events to prevent undesirable consequences. The finding was screened in accordance with NRC IMC 0609, Significance Determination Process, dated April 29, 2015; Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012.
Using IMC 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, the finding screened to green, because the deficiency affected the design or qualification of a mitigating SSC but the SSC maintained its operability or functionality. The finding was determined to have a cross-cutting aspect in the resolution area of Problem Identification and Resolution [P.3], because the organization failed to take effective corrective actions to address issues in a timely manner commensurate with their safety significance.
Enforcement:
Title 10 CFR Part 50, Appendix B, Criterion III, Design Control, states, in part, that measures shall also be established for the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-related functions of the structures, systems and components. Contrary to the above since April 15, 2014, the licensee failed to establish measures for the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-related functions of the structures, systems and components.
Specifically, the NRC identified examples where the licensees design control measures failed to review for suitability technical details for components used in Class 1E systems that were specified in PEG packages 1071185AO, CQL602X-EQIV and 1163452HO.
The finding was entered into the licensees corrective action program as CRs 1059281 and 1064042. Planned corrective actions were to revise the calculations. Because the finding was of very low safety significance (Green) and was entered into the licensees corrective action program this violation will be treated as an NCV consistent with section 2.3.2 of the NRC enforcement policy. This violation is identified as NCV 05000327, 328/2015007-01, Failure to maintain control of and update safety related design output documents (electrical calculations).
b.2 Failure to Meet Design Basis Requirements to Provide Interlocks Between Shared Onsite Emergency and Shutdown AC Electric Systems
Introduction:
The inspectors identified a Green NCV of 10 CFR 50 Appendix B Criterion III, Design Control, for the licensees failure to ensure that plant licensing and design basis for shared Class 1E electrical systems were controlled and maintained. The licensing and design basis of shared electrical systems required mechanical interlocks (kirk-key) to prevent an operator error that could parallel these diverse power sources in accordance with IEEE 308-1971 and Regulatory Guides 1.81 and 1.6. A modification removed the kirk-key interlocks.
Description:
On April 2, 2014, the licensee implemented a design modification, DCN 23085 that removed the kirk key interlocks from the crosstie breakers for the Unit 1A and Unit 2A shared Essential Raw Cooling Water (ERCW) 480V AC motor control centers (MCCs). The UFSAR Section 8.1.5 Design Criteria and Standards for the Electric Power Systems, stated, in part, The design meets the intent of IEEE 308-1971 IEEE Standard Criteria for Class IE Electric Systems for Nuclear Power Generating Stations, Regulatory Guide (RG) 1.81 Shared Emergency and Shutdown Electric Systems for Multi-Unit Nuclear Power Plants, and RG 1.6 Independence between Redundant Standby (Onsite) Power Sources and between Their Distribution Systems. Standard IEEE 308-1971 Section 4.1 General stated, in part, the Class 1E electric systems shall be designed to assure that any Single act or event that can cause multiple equipment malfunctions will not cause a loss of electric power to a number of engineered safety features (ESF). Regulatory Guide 1.81 position 2, stated, in part, for multi-unit nuclear power plants, the design of shared onsite emergency and shutdown A.C. electric systems should conform to the recommendations contained in Regulatory Guides 1.6.
Regulatory Guide 1.6 position D.4.d, stated, in part, If means exist for manually connecting redundant load groups together, at least one interlock should be provided to prevent an operator error that would parallel their standby power sources. The original design of the crosstie breakers for the Unit 1A and Unit 2A shared Essential Raw Cooling Water (ERCW) 480V AC MCCs used kirk-key interlocks. The interlocks prevented a single operator act from paralleling the power sources, which met the licensing basis.
The UFSAR Section 1.2.2.7 Plant Electrical System, specifies that, For Unit 1, the Plant Electric Power System consists of the main generator, the common station service transformers, the diesel generators, the batteries, and the electric distribution system.
The UFSAR description for unit 2 is the same. The UFSAR Sections 9.2.2.2 and 9.2.2.3
[ERCW] System Description and Safety Analysis, described four independent diesels generator power trains (two divisions per plant) starting four independent ERCW pumps that are divided into two common ERCW header trains. The safety analysis described the ERCW electrical design was for the loss of an entire plant emergency power train (one of the four divisions).
The inspectors determined that each ERCW power divisions independently met the definition of a redundant Standby Power Source each with individual Load Group as described in RG 1.6. This design provided diversity and defense in depth for the shared power systems. The divisions were incompatible as specified by RG1.6. An inadvertent Interconnection between these Standby AC Power Sources could cause undesirable interactions, as specified by RG 1.81. The original kirk key interlock design prevented these undesirable consequences before they were removed. The licensee was required to maintain at least one interlock to prevent an operator error that could parallel the shared onsite emergency and shutdown AC electric systems.
Analysis:
The licensees failure to ensure that at least one interlock was provided between the Unit 1A and Unit 2A ERCW power trains to prevent a single act or event from paralleling their power sources as specified by IEEE 308-1971, RG1.81, and RG1.6, was a performance deficiency. The performance deficiency was more than minor because it was associated with the Design Control attribute of the Mitigating Systems Cornerstone and the removal of mechanical interlocks that separated diverse shared electrical systems adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The finding was screened in accordance with NRC IMC 0609, Significance Determination Process, dated April 29, 2015; Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012.
Using IMC 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, the finding was screened to green, because the deficiency affected the design or qualification of a mitigating SSC but the SSC maintained its operability or functionality.
The finding was determined to have a cross-cutting aspect in the conservative bias area of Human Performance [H.14] because the licensees decision making-practices did not emphasize prudent choices over those that are simply allowable.
Enforcement:
10 CFR Part 50, Appendix B, Criterion III, Design Control, stated, in part, that measures shall include provisions to assure that appropriate quality standards are specified and included in design documents and that deviations from such standards are controlled. Contrary to the above since 2014, the licensee failed to include provisions to assure that appropriate quality standards were specified and included in design documents and that deviations from such standards were controlled. Specifically, design changes to the Unit 1A and Unit 2A ERCW power sources failed to include IEEE 308-1971, Regulatory Guides 1.81 and 1.6 and that deviations from them were controlled subject to design control measures commensurate with those applied to the original design. The issue was entered into the licensees corrective action program as CR 1064736. The licensee has administrative controls in place to limit the risk of this configuration pending determination of corrective actions. Because the finding was of very low safety significance (Green) and was entered into the licensees corrective action program this violation will be treated as an NCV consistent with section 2.3.2 of the NRC enforcement policy. This violation is identified as NCV 05000327, 328/2015007-02, Failure to meet Design Basis Requirements to have Interlocks between Shared systems.
b.3 Failure to request a licensee amendment prior to removing interlocks from shared onsite emergency and shutdown AC electric systems.
Introduction:
The inspectors identified a SLIV violation of 10CFR 50.59.c.(2).ii Changes, tests and experiments for the licensees failure to obtain a license amendment prior to implementing a change to the onsite emergency and shutdown AC electric systems supplying the shared Essential Raw Cooling Water (ERCW) systems.
The change removed the kirk key interlock from the tie breakers that originally prevented an operator error that would parallel the Unit 1A and Unit 2A 480V AC MCCs.
Description:
The licensee is committed to the Nuclear Energy Institute (NEI) standard 96-07 to meet the requirements of 10 CFR 50.59. Standard NEI 96-07 Section 4.3.2, which, stated, in part, Although this criterion [10 CFR 50.59.c.(2).ii ] allows minimal increases, licensees must still meet applicable regulatory requirements and other acceptance criteria to which they are committed (such as contained in regulatory guides and IEEE standards). Further, departures from the design and performance standards as outlined in the General Design Criteria (Appendix A to Part 50) are not compatible with a "no more than minimal increase" standard. The UFSAR Section 8.1.5 Design Criteria and Standards for the Electric Power Systems, stated, in part, The design meets the intent of IEEE 308-1971, Regulatory Guide (RG) 1.6, and RG 1.81. The original design of the ERCW system used tie breakers to interconnect the Unit 1A MCC to the Unit 2A MCC in order to operate both from one division of AC power. Either of the Units could provide this functional diversity and defense in depth. Kirk key interlocks on the tie breakers prevented inadvertent interconnections between the two MCCs power sources. As indicated by RG 1.81 and RG 1.6, inadvertent interconnections between units could cause undesirable interactions. A modification to the MCCs removed these kirk key interlocks and the licensee failed to identify that the design departed from the acceptance criteria outlined in the design and performance standards mentioned above.
Further, the removal of the kirk key interlock made credible the possibility of a single act or event paralleling the two MCCs power sources, which could now cause undesirable interactions. The inspectors determined that this modification more than minimally increased the likelihood of occurrence of a malfunction of the shared ERCW A train, which would have required NRC approval prior to implementation.
Analysis:
The licensees change to the facility resulted in a departure from acceptance criteria in design and performance standards, which resulted in a more than a minimal increase in the likelihood of occurrence of a malfunction as specified by NEI 96-07 Chapter 4, was a performance deficiency. The performance deficiency was determined to be more than minor because there was a reasonable likelihood that the change required Commission review and approval prior to implementation and the failure to request approval impacted the regulatory process. Specifically, the departure from acceptance criteria identified in IEEE 308, RG 1.81, and RG 1.6 reasonably required commission review and approval prior to implementation. Using IMC 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, the finding was screened to green, because the deficiency affected the design or qualification of a mitigating SSC but the SSC maintained its operability or functionality. Because this violation was evaluated as having very low safety significance (i.e., green) by the SDP it was dispositioned as a severity level (SL) IV.
Enforcement:
10CFR 50.59.c.(2).ii stated, A licensee shall obtain a license amendment pursuant to Sec. 50.90 prior to implementing a proposed change, test, or experiment if the change, test, or experiment would result in more than a minimal increase in the likelihood of occurrence of a malfunction of a structure, system, or component (SSC)important to safety previously evaluated in the final safety analysis report (as updated).
Contrary to the above since 2014, the licensee did not obtain a license amendment pursuant to Sec 50.90 prior to implementing the change to kirk-key interlocks, which created a more than minimal increase in the likelihood of occurrence of a malfunction of a SSC important to safety previously evaluated in the UFSAR. The issue was entered into the licensees corrective action program as CR 1076179. The licensee has administrative controls in place to limit the risk of this configuration pending determination of corrective actions. Because the finding was of very low safety significance (SLIV) and was entered into the licensees corrective action program this violation will be treated as an NCV consistent with section 2.3.2.a of the NRC enforcement policy. This violation is identified as NCV 05000327, 328/2015007-03, Failure to request a licensee amendment prior to removing interlocks from shared onsite emergency and shutdown AC electric systems.
b.4 Failure to identify and correct conditions adverse to quality
Introduction:
The inspectors identified three examples of a Green NCV of 10 CFR 50 Appendix B, Criterion XVI Corrective Action, for licensees failure to identify and correct conditions adverse to quality that were associated with the processes for evaluating Class 1E critical characteristics for molded case circuit breakers.
Description:
Sequoyah (SQN) issued PER 406695 SQN review of Watts Bar Nuclear (WBN) PER 403095 - Commercial Grade Dedication Process. The PER was closed 2/12/2013 with the comment that No SQN site specific cause identified. This PER will consist of actions to review the WBN disposition of PER 403095. The inspectors identified that the WBN PER identified weaknesses in the TVA Nuclear Power Group (NPG) procedures for identification and verification of Class 1E critical characteristics.
The Quality Assurance Program (QAP) Section 10 Adverse Conditions, Subsection 10.1 General stated, in part, adverse conditions, including non-conforming items,
shall be identified, evaluated, corrected, tracked, trended, and when required, reported to appropriate levels of management. Subsection 10.2.2, Corrective Action for Adverse Conditions states, in part, shall promptly identify and resolve adverse conditions. The inspectors identified examples where the licensee failed to identify non-conforming items in the corrective action program (CAP), and failed to perform adequate critical characteristic evaluations using the corporate procedures as described in PER 403095.
Examples were identified associated with PEG package 1071185AO prepared for DCN 23085. Additional examples were identified associated with equivalent change technical evaluation (EQV) 23082 prepared for Engineering Change Package (ECP) 23082A.
One example where a nonconformance was not entered into the CAP, resulted in a Design Change Notification (DCN), which inappropriately accommodated nonconforming items instead of correcting the nonconformances as specified by the QAP. The inadequate critical characteristics evaluations did not recognize or evaluate circuit breaker interfaces, circuit breaker weight differences, circuit breaker actuating mechanisms, and circuit breaker temperature compensation mechanisms.
The inspectors reviewed TVA NPG Procedure NEP-8.4, Equivalency Evaluation for Procurement and Use of Replacement Material and Items, Rev. 001, section 3.2.2 which stated in part In performing the Equivalency Evaluation, the Procurement Engineer determines whether there are any differences in the physical design characteristics of the replacement item affecting its fit, form, function, manufacturing, or material. The inspectors interviewed the Procurement Engineering Group (PEG) staff and determined that in some instances they relied on part numbers to procure and verify the adequacy of electrical equipment rather than identify the critical characteristics necessary for the component application. Further, the methods identified for procurement engineers in the TVA NPG procedures to identify Class 1E critical characteristics did not provide adequate technical details, which resulted in vague interpretations by procurement engineers.
Example one: The inspectors reviewed PEG package 1071185AO, which purchased replacement molded case circuit breakers (MCCB) under an equivalency process for applications in the plant. The inspectors noted that the Engineering Evaluation, stated, in part, the requirement for kirk-key interlock has been removedthe existing interlock will be reused. Correspondences from the third party dedicator stated, in part, TVA should identify required auxiliary devices for this breaker. In bold TVAs response stated, that As noted above, we have determined that this breaker will not require the addition of a kirk key interlock since the existing interlock will be reused. The existing kirk-key interlock system was not listed as a critical design characteristic and the interlock dimensions were not evaluated for equivalency. Sometime after receipt of the MCCBs, while performing installation, SQN identified that the existing kirk key interlocks were not compatible with the new MCCBs. The inspectors requested the documents, which should have been generated per the SQN QAP and site procedures upon discovery of the above incompatibilities. The inspectors determined that the QAP Section 10.2.1 Control of non-conforming items, stated, in part, Organizations responsible for items determined to be non-conforming during receipt, inspection, construction modifications shall identify and segregate the non-conforming item from acceptable items to prevent installation. The TVA Standard Program Procedure (SPP) NPG-SPP-22.300, Correction Action Program, Rev. 0003, stated, in part, An individual discovering a problem takes immediate actions to address it...
actions include reporting the problem as required and initiating or ensuring the initiation of a problem report document. The licensee provided PERs 315158 and 356903, which were initiated during previous installation attempts. Neither PER was initiated to resolve the non-conforming condition. The inspectors determined that no corrective action was initiated to address the non-conforming condition when this issue was identified. Further, this was identified as an example of deficiencies in the evaluation of Class 1E critical characteristics as presented in PER 406695. As a result of the issues identified by the inspectors, CR 1064483 was initiated.
Example two: A new operating handle feature was added to MCCBs and they were noted under critical characteristic items for review. However, the equivalency evaluation for PEG package 1071185AO stated, in part, For TVA use: no handles are used on the breaker for opening and closing actions, therefore evaluation is not required. However, after work related to DCN 23085 attempted to install the handle it was identified that the rotary style breaker handle would not function with the new Cutler Hammer MDL3800 breakers. The inspectors identified that the handles were used for opening and closing the MCCBs. This was identified as another example of deficiencies in the evaluation of Class 1E critical characteristics as presented in PER 406695. As a result of the issues identified by the inspectors, CRs 1064744 and 1064479 were initiated.
Example three: The inspectors determined from ECP 23082 titled Option to use either GE breaker model TFJ236110WL of TFJ236125WL, Rev. A, that the EQV [the equivalency evaluation] gives the option to use either GE breaker model number TFJ236110WL or TFJ236125WL for breaker 2-BCTC-016-0727 which feeds ice condenser air handling units. The inspectors reviewed SQN-APS-003 referenced by the evaluation and determined that the ambient temperature compensation features on the new circuit breakers were not identified or evaluated as critical characteristics. This was identified as another example of deficiencies in the evaluation of Class 1E critical characteristics as presented in PER 406695. As a result of the issues identified by the inspectors, CR 1064731 was initiated.
Analysis:
The licensees failure to identify and correct conditions adverse to quality for nonconforming items and resolve adverse conditions identified in SQN PER 406695 that were associated with evaluating Class 1E critical characteristics, as specified by the QAP Sections 10.2.1 and 10.2.2 was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the Equipment Performance attribute of the Mitigating Systems Cornerstone and the failure to identify and segregate nonconforming items and resolve adverse conditions with evaluating Class 1E critical characteristics as identified in SQN PER 406695 adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The finding was screened in accordance with NRC IMC 0609, Significance Determination Process, dated April 29, 2015; Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012. Using IMC 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, the finding was screened to green, because the deficiency affected the design or qualification of a mitigating SSC but the SSC maintained its operability or functionality. The finding was determined to have a cross-cutting aspect in the change management area of Human Performance [H.3]
because Leaders failed to use a systematic process for evaluating and implementing change so that nuclear safety remains the overriding priority.
Enforcement:
10 CFR Part 50, Appendix B, Criterion XVI, Corrective Actions, stated, in part, that that Measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected. Contrary to the above since 2013, the licensee failed to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances with procurement processes were promptly identified and corrected. Specifically, the licensee failed to identify and correct nonconformances with Class 1E electrical equipment prior to installation, and failed to identify and correct deficiencies in the evaluation of Class 1E critical characteristics identified in PER 406695. The issue was entered into the licensees corrective action program as CRs 1064483, 1064744, 1064479, 1059273 and 1064731. Planned corrective actions were to update procedures to document critical thinking in evaluating CRs and include additional critical characteristics. Because the finding was of very low safety significance (Green) and was entered into the licensees corrective action program this violation will be treated as an NCV consistent with section 2.3.2 of the NRC enforcement policy. This violation is identified as NCV 05000327, 328/2015007-04, Failure to identify and correct inadequate procurement evaluation processes.
b.5 Failure to Establish Static Performance Characteristics for the Qualification of Class 1E Electrical Equipment
Introduction:
The inspectors identified a Green NCV of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the licensees failure to verify the adequacy of defined shelf life and design life characteristics of Class 1E equipment i.e. molded case circuit breakers.
Description:
The inspectors reviewed procurement packages for DCNs 23085 and 23082 that purchased Class 1E molded case circuit breakers (MCCBs) to assess the qualification criteria. The inspectors identified that the licensee did not establish qualification criteria for design life. The licensee had some MCCBs installed and in service for more than 20 years. The licensee provided a white paper that concluded, regulatory guidance and SQN UFSAR consistently exempt 1E equipment in a mild environment from the requirement to specify a qualified life. Maintenance and testing programs are recognized as an acceptable method of monitoring aging effects for equipment, which is not subjected to significant environmental stresses. SQN
[Sequoyah] 1E breaker test program, Surveillance, and periodic maintenance program provides aging monitoring. The licensees white paper indicated that qualification is required only for harsh environmental service conditions. The inspectors noted that qualified life is the defined period of time for which satisfactory performance can be demonstrated for a specific set of service conditions. Service conditions included normal operating conditions, which included mild environments. Further, the SQN licensing basis required the qualification of Class 1E equipment for normal operating conditions so that it will reliably perform its safety function on a continuing basis. With age, the probability of Class 1E equipment failure increases.
The UFSAR Section 8.1.5 Design Criteria and Standards, for electric power stated, in part, design meets the intent of those standards and guides IEEE Std 279-1971, IEEE Std 308-1971, and IEEE No. 323-1971. Standard IEEE 279-1971, Section 4 Requirements, Subsection 4.4 Equipment Qualification, stated, in part, the protection system equipment shall meet, on a continuing basis, the performance requirements, for the range of transient and steady-state conditions of both the energy supply and the environment during normal, abnormal, and accident circumstances throughout which the system must perform, determined to be necessary for achieving the system requirements. Standard IEEE 308-1971 Section 4.7 Equipment Qualification required similar qualification. Standard IEEE 323-1971 Section 1 Scope and Section 2 Purpose stated, in part, the standard describes the basic requirements for demonstrating the qualification of Class 1 electrical equipment as required in IEEE 279 and IEEE 308. Standard IEEE 323-1971 Section 5, Method and Documentation, specified, in part, the qualification method shall establish that each type of equipment is qualified for its application. The documentation shall include:
- The application requirements
- The equipment specifications, and data from the qualification method used.
- The service conditions and design basis event conditions to be simulated.
- The type test data shall contain the static and dynamic performance characteristics.
The inspectors determined that, the static and dynamic performance characteristics over normal service conditions described conditions related to shelf life and design life. Per IEEE definitions, static and dynamic performance characteristics were defined as the operating limits given for no appreciable changes over long time intervals, such as shelf life, and appreciable changes resulting from the application of an energy source, such as would occur within the expected design life. Normal operating conditions were defined as those that create operating stresses such as voltage, current loading, and mechanical loading including anticipated overloads and periodic testing, but not including accidents or other extraordinary events. The design life was defined as the time during which satisfactory performance can be expected for a specific set of service conditions. The inspectors noted that the primary consideration of design life qualification was degradation associated with aging over long time intervals, and thus unpredictable failures. The inspectors determined that aging from normal environmental effects as well as induced aging from normal service conditions such as electrical and mechanical loading affected the design life. This included the range of transient and steady-state conditions of both the energy supply and the environment during normal, abnormal, and accident circumstances throughout which the system must perform. This included the determination of the shelf life for normal environmental aging. The licensee did not establish the Class 1E static and dynamic performance characteristics under the full range of service conditions as specified by IEEE 323-1971 and required by IEEE 279 and IEEE 308.
Analysis:
The failure to define Class 1E static and dynamic performance characteristics as specified by IEEE 323, Section 5 and as required by IEEE 279 and IEEE 308 was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the Design Control attribute of the Mitigating Systems Cornerstone and the failure to ensure the Class 1E static performance characteristics were identified and evaluated adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of the SSCs that responds to initiating events to prevent undesirable consequences. The finding was screened in accordance with NRC IMC 0609, Significance Determination Process, dated April 29, 2015; Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012. Using IMC 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, the finding was screened to green, because the deficiency affected the design or qualification of a mitigating SSC but the SSC maintained its operability or functionality. The finding was determined to have a cross-cutting aspect in the change management area of Human Performance [H.3] because Leaders failed to use a systematic process for evaluating and implementing change so that nuclear safety remains the overriding priority.
Enforcement:
10 CFR Part 50, Appendix B, Criterion III, Design Control, stated, in part, that Measures shall be established for the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-related functions of the structures, systems and components. Contrary to the above, since 2013, the licensee failed to establish measures for the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-related functions of the structures, systems and components. Specifically, the licensee failed to establish measure for the selection and review for suitability of static and dynamic performance characteristics used in the design and qualification of Class 1E electrical equipment. Because the finding was of very low safety significance (Green) and was entered into the licensees corrective action program as CR 1064785, this violation will be treated as an NCV consistent with section 2.3.2 of the NRC enforcement policy. This violation is identified as NCV 05000327, 328/2015007-05, Failure to Identify Qualification Criteria Associated with Class 1E Electrical Component Static Performance characteristics.
4OA6 Meetings, Including Exit
On July 31, 2015, the inspectors presented inspection results to Mr. Preston Pratt and other members of your licensees staff. On September 10, the inspectors re-exited the inspection results with Mr. Preston Pratt and other members of your licensees staff.
The inspectors verified that any proprietary information retained by the inspectors in order to resolve any violations or unresolved items would be disposed of properly upon resolution of the issues.
ATTACHMENT:
SUPPLEMENTARY INFORMATION
KEY POINTS OF CONTACT
Licensee personnel
- W. Pierce, Director of Engineering
- K. Smith, Director of Training
- T. Marshall, Director of Operations
- E. Henderson, Licensing Manager
- Z. Kitts, Licensing Engineer
- R. Travis, Licensing Engineer
- J. Campbell, Electrical Manager
- M. Rankin, 10 CFR 50.59 Program Owner
- J. Alfultis, Sr. Manager Projects
- C. Roneen, Sr. Manager Design Engineering
- H. Elbeitam, Engineering Support
NRC personnel
- W. Deschaine, Resident Inspector, Sequoyah
- G. Smith, Senior Resident Inspector, Sequoyah
LIST OF ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED
Opened and Closed
- 05000327, 328/2015007-01 NCV Failure to maintain control of and update safety related design out documents (electrical calculations)
- 05000327, 328/2015007-02 NCV Failure to meet Design Basis Requirements to have Interlocks between Shared systems
- 05000327, 328/2015007-03 NCV Failure to request a licensee amendment prior to removing interlocks from shared onsite emergency and shutdown AC electric systems
- 05000327, 328/2015007-04 NCV Failure to identify and correct inadequate procurement evaluation processes
- 05000327, 328/2015007-05 NCV Failure to Identify Qualification Criteria Associated with Class 1E Electrical Component Static Performance Characteristics