May 22, 2019

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000327/2019411 AND 05000328/2019411

Dear Mr. Shea:

On May 10, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Station, Units 1, 2 and discussed the results of this inspection with Mr. M. Rasmussen and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-Identified or self-revealing findings were identified during the inspections.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room, in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch

Division of Reactor Safety

Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79

Enclosure:

NRC IR 05000327/2019411 and 05000328/2019411

Inspection Report

Docket Nos:

05000327 and 05000328

License Nos:

DPR-77 and DPR-79

Report Nos:

05000327/2019411 and 05000328/2019411

Enterprise Identifier:

I-2019-411-003

Licensee:

Tennessee Valley Authority

Facility:

Sequoyah Nuclear Station, Units 1 and 2

Location:

Chattanooga, TN 37402

Dates:

April 1-5, 2019

May 6-10, 2019 (In Office)

Inspectors:

Jon Wallo, Senior Physical Security Inspector

John Tornow, Physical Security Inspector

Jonathan Brown, Physical Security Inspector

Approved by:

Binoy Desai, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at Sequoyah Nuclear Station,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

NRC and self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations

No findings were identified.

INSPECTION SCOPE

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program. The following elements were evaluated from this IP dated January 1, 2019.

Tier I:

all requirements Tier II:

8 requirements 02.06 (a-d), 02.07 (a), 02.08 (a), (e),

(i) Tier III:

1 requirement 02.10 (a)

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security testing and maintenance program. The following elements were evaluated from this IP dated January 1, 2019.

Tier I:

all 38 requirements Tier II:

4 requirements 02.09 (a); 02.12 (a); 02.13 (a),

(d) Tier III:

2 requirements 02.14; 02.15 (a)

71130.07 - Security Training

The inspectors evaluated the nuclear security training program. The following elements were evaluated from this IP dated January 1, 2019.

Tier I:

all 16 requirements Tier II:

8 requirements 02.05 (a), (b), (c), (d); 02.06 (a), (b); 02.09

(a) Tier III:

5 requirements 02.10, 02.11(a); 02.13 (a), (b), (c)

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below for the period from March 2018, through March 2019.

(1) Protected Area Security Equipment Performance Index

EXIT MEETINGS AND DEBRIEFS

On May 10, 2019, the inspectors presented the Baseline Security Inspection results to Mr. M.

Rasmussen and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procecure

Type

Designation

Description of Title

Revision

& Date

71130.02

Procedures

NPG-SPP-

14.10

Fitness-for-Duty-Alcohol and Drug Testing Requirements

Rev. 4

NPG-SPP-

14.11

Fitness-for-Duty-Medical Review Officers Procedure

Rev. 1

NPG-SPP-

14.12

Fitness-for-Duty-Intoxilyzers Requirements

Rev. 4

NPG-SPP-

14.13

Fitness-for-Duty-Administrative Duties

Rev. 3

NPG-SPP-14.3 Security Information Control Program

Rev. 16

NPG-SPP-14.4

Nuclear Security

Rev. 7

NPG-SPP-14.5

Access Authorization

Rev. 18

NPG-SPP-14.6

Safety/Security Interface

Rev. 7

NPG-SPP-14.7

National Threat Advisory System (SSI)

Rev. 2

BP-108

TVA Nuclear Power Group Nuclear Plant Site Check-In and Check-Out

Process

Rev. 24

NSDP-8

Keys and Locks

Rev. 8

NSDP-17

Records

Rev. 4

NSDP-23

Plant Access/Badging Process

Rev. 19

NSDP-24

Access Authorization Program

Rev. 14

NSDP-38

Access Authorization-Reviewing Officials

Rev. 9

NSDP-46

Security Gas Mask Maintenance and Fit Testing Program

Rev. 4

NSDP-49

Underground Pathway

Rev. 0

NSDP-52

Quantitative Enzyme Diagnostic (QED) Saliva Alcohol Testing

Rev. 1

SSI-7.3

Exterior Motor Patrol

Rev. 29

SSI-7.5

Interior Foot Patrol

Rev. 24

SSI-7.6

Personnel Access Control

Rev. 40

SSI-7.7

Vehicle Access Control

Rev. 43

SSI-7.10

Gate 56 Vehicle Access

Rev. 4

71130.02

Procedures

SSI-13.2

Sequoyah Nuclear Plant Law Enforcement Response Plan

Rev. 4

SSI-14.1

Special Situations Affecting Security

Rev. 5

SSI-16.1

Compensatory Measures

Rev. 16

SSI-19.1

Temporary Suspension and/or Alteration of Security Measures

Rev. 13

SSI-20.1

Guidance on the Protection of Unattended Openings that Intersect a

Security Boundary

Rev. 4

SSI-27.1

Radioactive Material / Nuclear Fuel Receipt

Rev. 3

SSI-29.1

Security Seals

Rev. 3

71130.04

Procedures

NPG-SPP-14.2

Target Set Development, Identification and Maintenance (SSI)

Rev. 8

CTP-0-SEC-

FPI-623.W

Card Reader and Balanced Magnetic Switch Operability Test

Rev. 1

CTP-0-SEC-

FPI-625.S

Card Reader and Hand Geometry Performance Test

Rev. 0

CTP-0-SEC-

FPI-645.S

Perimeter Intrusion Detection System Performance Test

Rev. 1

CTP-0-SEC-

FPI-630.W

Perimeter Intrusion Detection and CCTV Systems Operability Test

Rev. 1

CTP-0-SEC-

FPI-643.W

X-Ray Equipment Operability/Performance Test

Rev. 2

CTP-0-SEC-

FPI-644.W

Weekly Vehicle Barrier System Operational Test

CTP-0-SEC-

FPI-645.S

Perimeter Intrusion Detection System Performance Test

Rev. 1

CTP-0-SEC-

FPI-645.W

Hand Held Metal Detector Operability/Performance Test

CTP-0-SEC-

FPI-646.W

Walk Through Metal Detector Operability/Performance Test

Rev. 1

CTP-0-SEC-

FPI-647.W

Explosive Detector Operability/Performance Test

Rev. 2

71130.04

Procedures

CTP-0-SEC-

FPI-676.Q

Owner Controlled, Protected, and Vital Barrier Inspection

CTP-0-SEC-

FPI-678.A

Annual Vehicle Barrier System Inspection

CTP-0-SEC-

FPM-001

CCTV System Preventative Maintenance Procedure Maintenance and

Functional Testing

Rev. 2

CTP-0-SEC-

FPM-002

Annual Metal Detector Preventative Maintenance

Rev. 1

CTP-0-SEC-

FPM-007

Explosive Detector Testing

Rev. 0

SSI-7.1

Central and Secondary Alarm Stations

Rev. 36

SSI-7.4

Bullet Resistant Enclosures / Semi-Static Posts

Rev. 21

SSI-15.1

Testing and Maintenance

Rev. 10

SSI-26.2

Response Equipment Inspection and Inventory

Rev. 0

71130.07

Procedures

BP-106

Administering NPG Medical Examination Process

Rev. 4

NPG-SPP-14.1

Fitness for Duty

Rev. 16

NPG-SPP-14.8

Guideline for Security Response to Indications of Tampering, Vandalism

and Malicious Mischief

Rev. 2

NPG-SPP-

14.14

Fitness-for-Duty-Training and Field Support for the Fitness of Duty

Program

Rev. 3

NSDP-1

Safeguards Event Reporting Guideline

Rev. 14

NSDP-4

Security Organization, Expectations and Standards

Rev. 20

NSDP-18

Administration of Security Training

Rev. 14

NSDP-22

Security Contingency Events (SGI)

Rev. 6

NSDP-26

Weapons Accountability

Rev. 19

NSDP-27

Conduct of Security Drills and Exercises/Performance Evaluation Program

Rev. 15

71130.07

Procedures

NSDP-30

Security Duty Restrictions/Return to Work

Rev. 8

NSDP-32

TVA Nuclear Security Law Enforcement Plan

Rev. 0

NSDP-39

Security Operating Experience

Rev. 2

NSDP-40

Reporting of Non-Threat Security Events

Rev. 2

NSDP-43

Safeguards Adjudication

Rev. 3

NSDP-44

Graded Systematic Approach to Security Training (GSAST)

Rev. 6

NSDP-44.1

Security On-The-Job Training

Rev. 3

NSDP-44.2

Security Task Performance Evaluation

Rev. 2

NSDP-45

Security Plan and Procedure Revision Process

Rev. 1

NSDP-48

NPG Security Physical Fitness Test

Rev. 3

NSDP-51

TVA Nuclear Power Group Access Services Psychological Screening

Manual

Rev. 1

NSDP-53

Security Severe Weather Response

Rev. 0

SSI-7.2

Protected Area Patrol

Rev. 24

71151

Procedures

NSDP-47

Evaluation of Security Related Issues

Rev. 2

NSDP-29

Tracking and Trending and NRC Performance Indicators

Rev. 9

71151

Condition

Reports

1435249

1463233

1481146

1488078

1491906

1434135

1403944

1405846

26570

1461494

1473982

1481621

71151

Corrective

Actions

1435249

The Security UPS HVAC needs to be repaired or replaced

1463233

Negative Trend associated with isolation zone LIU

1481146

Improper testing procedure use

1488078

Negative trend associated with isolation zone XX

1491906

Evaluate the elimination of PM 063601107

1383679

Key Core changout not completed within the specified timeframe

1462938

ACP gatehouse lane duress button should activate entry turnstile lockdown

1405846

Track training pertaining to the elimination of Security Support to

Maintenance

26570

Officers failed to complete LMS course requirements prior to attending

2nd.Trimester T/Q

71151

Corrective

Actions

1461494

Time stoppage while performing Task 27C

1473982

TVA Form 41104 - Administrative Error

1481621

SSA1903 Remediation Forms not in Training Records reviewed. No

Remediation form.

Corrective

Actions

Based on

Inspection

1504377

Evaluate Key, Core and Lock Program

1504383

Use of Cover

1504384

Tester performed wrong test section

1504816

Evaluate Barrier Deployment

1505374

Declining attitude for initiating CRs

1505586

Evaluate the FAC pertaining to assessing Exit alarm

1505588

Moving the jacks in the isolation zone while conducting testing

1505589

Drop down Arm at the Sally port is in need of attention

1505591

Evaluate revising procedure for prioritization of Security Equipment

9