IR 05000327/2019412
| ML19322A010 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/15/2019 |
| From: | Omar Lopez-Santiago NRC/RGN-I/DRP/PB5 |
| To: | Jim Barstow Tennessee Valley Authority |
| M. Toth RGN-II/DRP | |
| References | |
| IR 2019412 | |
| Download: ML19322A010 (2) | |
Text
November 15, 2019
SUBJECT:
SEQUOYAH NUCLEAR PLANT - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000327/2019412 AND 05000328/2019412
Dear Mr. Barstow:
On October 24, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Sequoyah Nuclear Plant and discussed the results of this inspection with Mr. Matthew Rasmussen and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Omar R. López-Santiago, Chief Reactor Projects Branch 5 Division of Reactor Projects
Docket Nos. 05000327 and 05000328 License Nos. DPR-77 and DPR-79
cc w/o encl:
Distribution via LISTSERV
ML193322A010 X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE RII/DRP RII/DRP RII/DRP NAME MToth SNinh OLopez-Santiago DATE 11/14/2019 11/14/2019 11/15/2019