IR 05000324/2014006

From kanterella
(Redirected from IR 05000325/2014006)
Jump to navigation Jump to search
Mid-Cycle Assessment Letter for Brunswick, Units 1 & 2, Inspection Report 05000325/2014006 and 05000324/2014006
ML14245A158
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/02/2014
From: Hopper G
NRC/RGN-II/DRP/RPB4
To: Hamrick G
Duke Energy Progress
References
IR-2014-006
Download: ML14245A158 (6)


Text

September 2, 2014

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000325/2014006 AND 05000324/2014006

Dear Mr. Hamrick:

On August 13, 2014, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Brunswick Steam Electric Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Brunswick Steam Electric Plant, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Brunswick Steam Electric Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.

Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through December 31, 2015.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

We also plan on conducting the following infrequently performed inspections and temporary instructions: License Renewal Phase 2; Operator Licensing Exams; and TI 2515/190, Near Term Task Force Recommendation 2.1, Flooding.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is scheduled for December 1, 2014. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4645 with any questions you may have regarding this letter.

Sincerely,

/RA/

George T. Hopper, Chief

Reactor Projects Branch 4

Division of Reactor Projects

Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62

Enclosure:

Brunswick Inspection/Activity Plan (09/01/2014 - 12/31/2015)

cc Distribution via ListServ

_______________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE DRP: RII DRP: RII DRP: RII

SIGNATURE DXW /RA/

JSD /RA/

GTH /RA/

NAME DJackson JDodson GHopper

DATE 8/20/2014 8/27/2014 8/27/2014

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO Letter to George Hamrick from George T. Hopper dated September 2, 2014.

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000325/2014006 AND 05000324/2014006

DISTRIBUTION D. Gamberoni, RII S. Price, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 09/02/2014 07:41:05 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Brunswick Inspection / Activity Plan 09/01/2014 - 12/31/2015 TFPI

- TRIENNIAL FIRE PROTECTION INSP

1, 2 IP Fire Protection [Triennial]

7111105T 09/08/2014 09/12/2014 1, 2 IP Fire Protection [Triennial]

7111105T 09/22/2014 09/26/2014 OL EXAM

- INITIAL LICENSE EXAM PREP

1 BRUNSWICK/OCTOBER 2014 INITIAL EXAM AT POWER FACILITIES V23436 09/08/2014 09/12/2014 OL EXAM

- INITIAL LICENSE EXAM WEEK 1

1 BRUNSWICK/OCTOBER 2014 INITIAL EXAM AT POWER FACILITIES V23436 10/06/2014 10/10/2014 OL EXAM

- INITIAL LICENSE EXAM WEEK 2

1 BRUNSWICK/OCTOBER 2014 INITIAL EXAM AT POWER FACILITIES V23436 10/13/2014 10/17/2014 MODS

- PLANT MODIFICATIONS INSPECTION

1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 10/27/2014 10/31/2014 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 11/17/2014 11/21/2014 ISI

- UNIT 2 IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - BWR 7111108G 02/23/2015 02/27/2015 RP

- RP OCCUPATIONAL BASELINE WEEK 1

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/02/2015 03/06/2015 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/02/2015 03/06/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/02/2015 03/06/2015 1, 2 IP Occupational Dose Assessment 71124.04 03/02/2015 03/06/2015 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/02/2015 03/06/2015 1, 2 IP Performance Indicator Verification 71151 03/02/2015 03/06/2015 RP

- RP OCCUPATIONAL BASELINE WEEK 2

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/16/2015 03/20/2015 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/16/2015 03/20/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/16/2015 03/20/2015 1, 2 IP Occupational Dose Assessment 71124.04 03/16/2015 03/20/2015 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/16/2015 03/20/2015 1, 2 IP Performance Indicator Verification 71151 03/16/2015 03/20/2015 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1, 2 IP Problem Identification and Resolution 71152B 05/04/2015 05/08/2015 1, 2 IP Problem Identification and Resolution 71152B 05/18/2015 05/22/2015 HS

- TRIENNIAL HEAT SINK PERFORMANCE

1, 2 IP Heat Sink Performance 7111107T 07/20/2015 07/24/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 09/02/2014 07:41:05 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Brunswick Inspection / Activity Plan 09/01/2014 - 12/31/2015 EP

- EP PROGRAM INSPECTION

1, 2 IP Alert and Notification System Testing 7111402 08/17/2015 08/21/2015 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 08/17/2015 08/21/2015 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 08/17/2015 08/21/2015 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/17/2015 08/21/2015 1, 2 IP Performance Indicator Verification 71151 08/17/2015 08/21/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure