Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 - NRC Inspection Reports 05000324/2024006 and 05000325/2024006
ML25066A155
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/11/2025
From: Matthew Fannon
NRC/RGN-II/DORS/PB2
To: Krakuszeski J
Duke Energy Progress
References
IR 2024006
Download: ML25066A155 (1)


Text

March 11, 2025

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000324/2024006 AND 05000325/2024006

Dear John A. Krakuszeski:

The NRC has completed its end-of-cycle performance assessment of Brunswick Steam Electric Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Brunswick Steam Electric Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2026.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 404-997-4547 with any questions you have regarding this letter.

Sincerely, Matthew S. Fannon, Chief Projects Branch 2 Division of Operating Reactor Safety Docket Nos.: 50-324, 50-325 License Nos.: DPR-62, DPR-71 Enclosure:

Inspection Plan cc: Distribution via ListServ Signed by Fannon, Matthew on 03/11/25 SUBJECT: ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000324/2024006 AND 05000325/2024006 DATED MARCH 11, 2025 DISTRIBUTION:

R2 ACES RidsNRRDRO Resource ROPAssessment Resource RidsNRRPMBrunswick Resource ADAMS ACCESSION NUMBER: ML25066A155 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DORS RII/DORS NAME A. Wilson M. Fannon DATE 03/10/25 03/11/25

Site Inspection Activity Plan Enclosure 07200006 - Brunswick (ISFSI)

03/01/2025 - 12/31/2026 OPERATION OF AN ISFSI

Unit Start End Activity CAC Title Staff Count 5/11/2026 5/15/2026 IP 60855 001001 Operation Of An ISFSI

Site Inspection Activity Plan

Brunswick 03/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count UNIT 2 IN-SERVICE INSPECTION

2 3/10/2025 3/14/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP OCCUPATIONAL RADIATION SAFETY BASELINE INSPECTION

1,2 3/10/2025 3/14/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/10/2025 3/14/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 3/10/2025 3/14/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2 3/10/2025 3/14/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 3/10/2025 3/14/2025 IP 71151 000746 Performance Indicator Verification 1,2 3/24/2025 3/28/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/24/2025 3/28/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 3/24/2025 3/28/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2 3/24/2025 3/28/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 3/24/2025 3/28/2025 IP 71151 000746 Performance Indicator Verification BRUNSWICK INITIAL EXAM

1,2 4/6/2025 4/12/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 5/11/2025 5/23/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

EMERGENCY PREPAREDNESS PROGRAM INSPECTION

1,2 8/11/2025 8/15/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 8/11/2025 8/15/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 8/11/2025 8/15/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 8/11/2025 8/15/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 8/11/2025 8/15/2025 IP 71151 001397 Performance Indicator Verification FOCUSED ENGINEERING INSPECTION (AGE-RELATED)

1,2 9/8/2025 9/12/2025 IP 71111.21N.04 001832 Age-Related Degradation 1,2 9/22/2025 9/26/2025 IP 71111.21N.04 001832 Age-Related Degradation PROBLEM IDENTIFICATION AND RESOLUTION

1,2 10/6/2025 10/10/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 10/20/2025 10/24/2025 IP 71152B 000747 Problem Identification and Resolution SECURITY BASELINE INSPECTION

1,2 10/27/2025 10/30/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 10/27/2025 10/30/2025 IP 71130.07 000739 Security Training SECURITY BASELINE INSPECTION

1,2 11/17/2025 11/20/2025 IP 71130.02 000734 Access Control 1,2 11/17/2025 11/20/2025 IP 71130.05 000737 Protective Strategy Evaluation

Site Inspection Activity Plan

1,2 11/17/2025 11/20/2025 IP 71130.09 001656 Security Plan Changes 1,2 11/17/2025 11/20/2025 IP 71151 001338 Performance Indicator Verification RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION

1,2 3/9/2026 3/13/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/9/2026 3/13/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 3/9/2026 3/13/2026 IP 71151 000746 Performance Indicator Verification UNIT 1 IN-SERVICE INSPECTION

COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI)

OPERATION OF AN ISFSI

CYBER SECURITY INSPECTION

1,2 5/25/2026 5/29/2026 IP 71130.10 000741 Cybersecurity BRUNSWICK INITIAL EXAM

1,2 6/21/2026 6/27/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 8/2/2026 8/15/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

EMERGENCY PREPAREDNESS EXERCISE INSPECTION

1,2 7/27/2026 7/31/2026 IP 71114.01 000716 Exercise Evaluation 1,2 7/27/2026 7/31/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 7/27/2026 7/31/2026 IP 71151 001397 Performance Indicator Verification BRUNSWICK REQUAL INSPECTION

1,2 9/28/2026 10/2/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance SECURITY BASELINE INSPECTION

1,2 10/19/2026 10/22/2026 IP 71130.02 000734 Access Control 1,2 10/19/2026 10/22/2026 IP 71130.09 001656 Security Plan Changes 1,2 10/19/2026 10/22/2026 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 10/19/2026 10/22/2026 IP 71151 001338 Performance Indicator Verification

3/16/2026 3/20/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

1,2 5/11/2026 5/15/2026 IP 60855 001001 Operation Of An ISFSI 1,2 5/4/2026 5/8/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 5/18/2026 5/22/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection