Text
- O.
U.S. NUCLEAR REGULATORY COMMISSI0ff 0FFICE OF INSPECTION AND EllFORCEMENT Region I Report No. 50-322/79-23 Docket No. 50-322 License No. CPPR-95 Priority Category B
--
Licensee:
Long Island Lighting Company 175 East Old Country Road Hicksville, New York 11801 Facility Name:
Shoreham Nuclear Power Station Inspection at:
Shoreham, New York Inspection conducted: December 10, 1979 - January 13, 1980 Inspectors:
b
-
J. C. Higgms, Resident Inspector
' dhte signed date signed date signed Approved by:
W W
<9C)
4. B. Kisfeh,-Thief, Reactor Projects Section
/ dafte signed No. 4, RO&NS Branch Inspection Summary:
Inspection on December 10, 1979 - January 13, 1980 (Report No. 50-322/79-23)
Areas Inspected:
Routine onsite regular, backshift and holiday inspections by the resident inspector (53 inspection-hours) of work activities and preoper-ational testing including:
tours of the facility, test witnessing, quality assurance activities, environmental monitoring, followup on IE Bulletins and followup on previous inspection findings.
Rosults:
No items of noncompliance were identified.
Region I Form 12 (Rev. April 77)
go04 000TT
,
.
.
DETAILS 1.
Persons Contacted T. Arrington, Superintendent, FQC (S&W)
J. Baker, Lead Advisory Engineer (S&W)
T. Czapleski, Training Coordinator (NES)
D. Durand, 0QA Engineer (L)
C. Fonseca, Site Engineering Representative (S&W)
K. Howe, General Superintendent of Construction (S&W)
J. Kelly, Field QA Manager (L)
L. Lewin, Assistant Startup Manager (L)
L. Lilly, Site Manager (L)
R. Murphy, Site Security Supervisor (L)
W. Museler, Assistant Project Manager (L)
J. Notaro, Operating Engineer (L)
J. Novarro, Project Manager (L)
J. Riley, Lead Startup Engineer (GE)
J. Rivello, Plant Manager (L)
W. Steiger, Chief Operating En J. Taylor, Startup Manager (L)gineer (L)
NES - Nuclear Engineering Services L - Long Island Lighting Company S&W - Stone and Webster GE - General Electric The inspector also interviewed other licensee and contractor personnel during the course of the inspection including management, clerical, mainten-ance, operations, security, engineering, testing, quality assurance, and construction personnel.
2.
Previous Inspection Finding Update (0 pen)UnresolvedItem(322/78-13-01):
Beach Accumulation:
The inspector reviewed the specific requirements of Construction Permit CPPR-95; the Fall,1978 survey drawings; and, the condition of erosion / accumulation on the site beaches.
The inspector noted that the condition of the beaches and Wading River appeared acceptable, but also noted that evaluations of the surveys performed in 1978 and 1979 were not completed.
The inspector stated that, without the survey evaluations or conclusions, compliance with the construction pennit requirement to monitor the beach could not be demonstrated.
This item remains unresolved pending review of licensee actions to improve the timeliness of their evaluations of beach survey result.
(0 pen) Item of Noncompliance (322/79-16-01): At various times during the past month the inspector noted additional openings on safety related equip-ment which were not immediately covered after use.
This item remains open pending the licensee's response and implementation of corrective action.
(Closed) Unresolved Item (322/79-16-03):
Fire Walls: The inspector reviewed a memorandum dated December 13, 1979 from C. Fonseca to J. Kelly which detailed the review of specification SH1-459 for Fire Stops and Seals relative to the FSAR and Fire Hazard Analysis Report requirements.
The review of SH1-459 found two discrepancies in addition to the one identified in this unresolved item.
All three changes are being incorporated into the specification in accordance with the project schedule.
This item is closed.
(Closed)UnresolvedItem(322/79-05-01): The inspector reviewed Revision 10 to the Startup Manual which constituted the first complete review and update, where necessary, of the Manual.
Additionally, a memo from J.
Taylor to T. F. Gerecke, dated May 29, 1979, establishes a six month review cycle for the complete Manual.
This item is closed.
(Closed) Unresolved Item (322/79-05-03):
Revision 10 to the Startup Manual contains changes which reflect the new Quality Assurance organization.
-This item is closed.
3.
Plant Tour The inspector conducted periodic tours of accessible areas of the plant during normal, backshift, holiday, and weekend hours.
During these tours, the following specific items were evaluated:
Hot Work.
Adequacy of fire prevention / protection measures used.
--
Fire Equipment.
Operability and evidence of periodic inspection of
--
fire suppression equipment.
Housekeeping.
Minimal accumulations of debris and maintenance of
--
required cleanness levels in systems under or following testing.
Equipment Preservation.
Maintenance of special precautionary measures
--
for installed equipment, as applicable.
Environmental Conditions.
Protection of Wading River marsh and nearby
--
beaches from deposition of sand and other materials from the site.
Component Tagging.
Implementation and observance of equipment tagging
--
for safety, equipment protection, and jurisdictional control.
_
. _ _.
.
.
Instrumentation.
Adequate protection for installed instrumentation
--
and satisfactory installation characteristics.
Logs.
Completeness of logs maintained.
--
,
Security.
Adequate site construction security.
--
Prohibited Items. Observations to determine no cating, drinking, or
--
>
smoking in restricted areas and no alcoholic beverages on site. Minor problem areas were discussed with licensee representatives throughout
!
the inspection.
No items of noncompliance were identified.
4.
Preoperational Quality Assurance a.
Surveillance Activities The inspector reviewed QAP-S-18.2, " Site 0QA Surveillance Procedure (General)," Revision 1; selected Surveillance Plans; and, several completed Surveillances and Verification Reports in order to determine that surveillances of quality related activities were being performed on a regular basis in accordance with approved procedures and schedules.
The inspector also witnessed the performance of tests in progress and observed Quality Assurance (QA)/ Quality Control (QC) participation in these tests via the use of procedural QA hold points and QC Surveillance Plans.
b.
Deficiency Control The inspector reviewed pertinent sections of the plant Startup Manual (SUM), Procedure QAI-15.1-01, " Station 0QA Deficiency Control During C&IO and Preoperational Testing," Revision 2, and selected LILC0 Deficiency Reports (LDR's).
During Checkout and Initial Operation (C&IO) testing of the SUM (P. 29) allows minor deficiencies to be tracked on the C&IO data sheets.
Major deficiencies would be handled via an LDR or Engineering and Design Coordination Report (E&DCR).
During Preoperational Testing, the SUM (P. 8-18) states that out of specification items will be flagged in the Test Engineers test report.-
These items would then be reviewed by the Joint Test Group (JTG).
Other items, such as those identified during system turnover from construction, will be listed on the Master Punch List.
!
.
.
Procedure QAI-15.1-01 recommends that an LDR be written for any deficient condition which is identified.
The method currently being used does not always use an LDR as described above.
This item is considered unresolved pending revision of the procedure (Item No. 322/79-23-01).
At the completion of preoperational testing the 0QA staff reviews the system turnover packages prior to JTG approval, using a standard audit checklist.
The inspector noted that the audit checklist did not have a step to review all exceptions and deficiencies from the various sources and verify that they were either resolved or highlighted for JTG consideration.
The licensee's representative stated that such a step would be added.
This item will be reviewed again and is designated as inspector follow item (322/79-23-02).
c.
Maintenance The inspector reviewed the pertinent sections of the Startup Manual (SUM), Procedure QAI-10.4-01, " Station 0QA Repair / Rework Request Control Prior to Plant Operation," Revision 0, and the files of active and completed Repair / Rework Requests.
The inspector also toured the plant to determine if any unauthorized maintenance was taking place on released components.
None was identified.
0QA observes maintenance work in progress using a Surveillance Plan for major items and a Verification Report for minor ones.
The inspector randomly selected several completed Repair / Rework Requests and reviewed the 0QA surveil-lance for the job. With the exception of some filing difficulties, which are currently being addressed, no discrepancies were identified.
Paragraphs 5.2 and 5.3 of Procedure QAI-10.4-01 discuss the initial review cycle for Repair / Rework Requests.
An appendix to the procedure contains a sample Repair / Rework Form.
The inspector noted that the procedure does not clearly reflect the current practice for assigning QA responsibility to a job and contains an outdated Form in the appendix.
This item is considered unresolved pending revision of the procedure and together with the item in Paragraph b above is designated (322/79-23-01).
d.
Training The inspector reviewed the following documents relating to the training of quality assurance inspectors and auditors:
Regulatory Guide 1.58-1973, " Qualification of Nuclear Power Plant
--
Inspection, Examination, and Testing Personnel."
!
,
.
ANSI N45.26-1973, " Qualifications of Inspection, Examination, and
--
Testing Personnel for the Construction Phase of Nuclear Power Plants."
QAP-S-02.1, " Station 0QA Indoctrination and Training," Revision
--
1.
QAP-S-02.2, " Station 0QA Auditor Qualification and Certification
--
of Auditors," Revision 0.
QAP-S-02.3, " Station 0QA Qualification and Certification of
--
Inspection, Test and Examination Personnel," Revision 1.
Training folders for selected 0QA personnel.
--
The inspector verified that selected 0QA personnel met the education, experience, qualification and certification requirements delineated in the above documents. The inspector also verified that a training program had been established in the quality assurance areas and reviewed selected records of completed training.
No items of noncompliance were identified.
.
5.
IE Bulletins a.
Containment Electrical Penetration Assemblies IE Bulletin 77-07 describes a situation where moisture accumulation in the penetration caused reduced insulation resistance and degraded performance.
Shoreham has established a program whereby construction personnel verify the penetrations are pressurized to approximately 30 psig and vendor recommendations.
The inspector reviewed the records of the weekly checks and toured the containment penetration area and noted that all penetrations appeared to be properly pressurized.
Procedures for use by the plant staff, when the penetrations are released by construction, have not been written yet, and will be reviewed at a later date.
6.
Test Witnessing During the inspection period the inspector witnessed the performance of the following Checkout and Initial Operations (C&IO) Tests:
CG.000.004, Instrument or Control Component Checkout and Calibration.
--
i
!
. _..
.
CG.000.012, Insulation Resistance of Electrical Equipment.
--
These tests were performed satisfactorily on the Core Spray System motor-operated valve lE21*MOV033A.
The inspector also witnessed portions of the preoperational test, PT 651.001,
" Process Computer." During the test witnessing the inspector observed:
Performance of test by qualified personnel;
--
Prerequisites and initial conditions properly documented;
--
Test approved and released for performance by the Joint Test Group
--
(JTG);
Test equipment calibrations current;
--
QA/QC coverage, as required, was provided; and,
--
Test exceptions properly noted.
--
The inspector had no further questions at this time.
7.
Investigation Into Allegations During the current inspection period the NRC has received several allegations relating to inadequate construction activities.
A special NRC investigation into these allegations has commenced to review each of these allegations.
When the review is completed, a report will be issued as Investigation Report Number 322/79-24.
8.
Unresolved Items Areas for which more information is required to determine acceptability are considered unresolved.
An unresolved item is contained in Paragraph 4 of this report.
9.
Management Meetings l
At periodic intervals during the course of this inspection, meetings were held with senior plant management to discuss the scope and findings of this j
inspection.
l l
The resident inspector also attended entrance and exit interviews of region-based inspectors conducted with plant management during the course of this
!