/E)satrla INDIANA&MICHIGAN PONE8 COMPANY DONALD C.COOK NUCLEAR PLANT P.O.Box 458, Bridgman, Michigan 49106 February 28, 1978 Mr.J.G.Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Comnission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr.Keppler:

Operating License DPR-74 Docket No.50-316 Pursuant to the requirements o'f Appendix A Technical Specifications and the United States Nuclear Regulatory Commission Regulatory Guide 1.16, Revision 4, Section 2.b, the following report is submitted:

RO 50-316/78-02

Sincerely, D.V.Shaller Plant Manager/bab cc: J.E.Dolan R.W.Jurgensen G.E.Lien R.Kilburn R.J.Vollen BPI K.R.Baker RO:III R.C.Callen MPSC P.W.Steketee, Esq.R.Walsh, Esq.G.Charnoff, Esq.G.Olson J.M.Hennigan PNSRC J.F.Stietzel Dir., IE (30 copies)Dir., MIPC (3 copies)tlAR 2 t978

~'--'orm No.4494LICENSEE EVENT REPORT~~01 M 7 89 CONTROL BLOCK: 1 UCENSEE NAME I D C C 2 0 0-0 14 15 LICENSE NUMBER LICENSE TYPE EVENT TYPB 4 1 1 1 1~03 0 0 0-0-0 0 30 31'32 25 26 (PLEASE PRINT ALL REQUIRED INFORMATION)

REPORT.REPORT CATEGORY TYPE SOURCE~a~cow~~L L 0 3 7 8 57 58 59 60 61 DOCKET NUMBER 0-0 3 1 EVENT DATE REPORT DATE 6 0 2 0 2 7 8 0 2 2 8 7 8 68 69 74 75'80 ,7 89 m LIMIT IN TECHNICAL SPECIFICATION 6.8.3.C.7 8 9 QOQ 7 8'9 SYSTEM CODE (RO-050-0316/78-02

)PRME COMPONENT SUPPLER CAUSE CODE COMPONENT CODE Ion>I~ZZ A Z Z Z Z Z Z~Z Z 9 9 9 7 8 9 10 11 12 17.43 44 47 CAUSE DESCRIPTION

[g]THE RESPONSIBLE TEST ENGINEER FAILED TO SUBMIT THE TEMPORARY SH Y 48 7 8 9@os SECTION HEAD FOR PNSRC REVIEW.7 8 9 ,EVENT DESCRIPTION

[op~]A REVIEW OF A PREOPERATIONAL TEST REVEALED THREE TEMPORARY CHANGE SHEETS (TP-2, 3,~7 8 9 m AND 4 for 2-PO-050-575A WERE WRITTEN ON JANUARY 6 1978 BUT NOT APPROVED BY o4 PNSRC AND THE PLANT MANAGER UNTIL FEBRUARY 7, 1978, THIS EXCEEDED THE 14-DAY 80 80 80 80 80 80 80 OTHER STATUS OFFSITE CONSEQUENCES N/A 7 8$CUSS OR DAMAGE TO FACILITY TYPE DESCRIPTION

~Z N/A 7 89 10 PUBLICITY N/A 7 89 FACILITY STATUS POWER P~g 0~oo o 7 8,9 10 12 13 FORM OF ACTIVITY COATENT RELEASEO OF RELEASE AMOUNT OF ACTIVITY Hj'z N/A 7 8 9 10 11 PERSONNEL EXPOSURES 7 89 11, 12 13 PERS'ONNEL INJURIES NUMBER DESCRIPTION

[iia]~00 0 N/A 7 89 11 12 METHOD OF DISCOVERY C 44 45 46 44'5 DISCOVERY DESCRIPTION Proced r LOCATION OF RELEASEN/A 80 80 80 80 80 80 80 7 89 80 ADDITIONAL FACTORS Q~B THE RESPONSIBLE TEST ENGINEER HAS REVIEWED THE TECHNICAL SPECIFICATION REQUIREMENTS 7 89 CONCERNING TEMPORARY CHANGE SHEETS.~19 7~89 CJ.L.Rischling 80 80 PHDNE(616)465-590 1Ext.368 GPO 661~667 U.I