IR 05000315/1978033

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-315/78-33 & 50-316/78-32 on 781101-03. No Noncompliance Noted.Major Areas Inspected:Security Organization Training & Qualification.Details Withheld (Ref 10CFR2.790)
ML19263B159
Person / Time
Site: Cook  
Issue date: 12/15/1978
From: Creed J, Howell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19263B160 List:
References
50-315-78-33, 50-316-78-32, NUDOCS 7901080232
Download: ML19263B159 (1)


Text

%

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

_=

Report No. 50-315/78-33; 50-316/78-32

Docket No. 50-315; 50-316 License No. DPR-56; DPR-74

-

Licensee: American Electric Power Service Corporation Indiana and Michigan Power Company 2 Broadway New York, NY 10004 Fa c ili t'j Name:

Donald C. Cook Nuclear Power Plant, Units 1 and 2 Inspection At:

Donald C. Cook Site, Bridgran, MI Inspection Conducted: Nove=ber 1-3, 1976 f.h.R. Creed 3t J[,

Inspectors:

L-G.,

-

f. C. HoweAl

/ - / / f/5 5

I. l h G << f*

/-

-

Approved By: [ d. Nind, Chief 2,.-[/[/7_['

'

  1. afeguards Branch S

In_syection Summarv Inspection on November 1-3, 1978 (Report No. 50-315/78-33; 50-316/75-3D Areas Inseected: Unannounced physical protection inspection regarding:

(a) security organization training and qualification; (b) applicable procedural aspects of 10 CFR 73.55(b) which became effective May 25, 1977; specifically, the inspectors reviewed guard / watch =an training records and programs as described in the Donald C. Cook Nuclear Plant Industrial Security Manual, approved by the Directorate of Licensing, AEC on June 11, 1974 and as described in applicable i=plementing procedures.

The inspec-tion involved 36 inspection hours onsite by two NRC inspectors.

Results: Of the one area specifically inspected, no ite=s of noncom-pliance were identified.

Details (Part 2.790(d) Information)

ry g @ O M 1 i

I