IR 05000315/2025010

From kanterella
Jump to navigation Jump to search
Fire Protection Team Inspection Report 05000315/2025010 and 05000316/2025010
ML25233A056
Person / Time
Site: Cook  
Issue date: 08/22/2025
From: Jasmine Gilliam
NRC/RGN-III/DORS/EB2
To: Ferneau K
Indiana Michigan Power Co
References
IR 2025010
Download: ML25233A056 (1)


Text

SUBJECT:

DONALD C. COOK NUCLEAR PLANT - FIRE PROTECTION TEAM INSPECTION REPORT 05000315/2025010 AND 05000316/2025010

Dear Kelly Ferneau:

On July 31, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Plant and discussed the results of this inspection with Gary Zimmerman and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jasmine Gilliam, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000315 and 05000316

License Numbers:

DPR-58 and DPR-74

Report Numbers:

05000315/2025010 and 05000316/2025010

Enterprise Identifier:

I-2025-010-0013

Licensee:

Indiana Michigan Power Company

Facility:

Donald C. Cook Nuclear Plant

Location:

Bridgman, MI

Inspection Dates:

July 14, 2025, to July 31, 2025

Inspectors:

A. Dahbur, Senior Reactor Inspector

I. Hafeez, Senior Reactor Inspector

C. Padilla, Reactor Inspector

B. Walden, Reactor Inspector

Approved By:

Jasmine A. Gilliam, Chief

Engineering Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Donald C. Cook Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) Fire Zone 45 (Unit 1 and Unit 2 Engineered Safety Systems and MCC Rooms and Mezzanine)
(2) Unit 1 Auxiliary Feed Water (AFW) System
(3) Most limiting Safe Shutdown Water Suppression System Fire Zone 97 & 98

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees Fire Protection Program (FPP) contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Combustible Control Program (CCP)

Fire Protection Program Changes/Modifications (IP Section 03.03) (1 Sample)

The inspectors verified the following:

a.

Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown b.

The adequacy of the design modification, if applicable c.

Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications d.

The FPP documents, such as the Updated Final Safety Analysis Report, f ire protection report, FHA, and SSA were updated consistent with the FPP or design change e.

Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated

(1) Engineering Change (EC) 53510; 1-FMO-212, Rewire the Motor Operated Valve (MOV) to meet NFPA 805 Transition Project Requirements

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 31, 2025, the inspectors presented the fire protection team inspection results to Gary Zimmerman and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 2020-0355

2-HV-SGTR-FD-17 Failed to Actuate and Drop

01/13/2020

AR 2023-3608

NFPA 805 Cable Ignition Concern

05/10/2023

AR 2023-8972

Dust Loading on Sprinkler Heads

11/27/2023

AR 2024-4363

2-HV-SGTR-FD-27 Failed to Close During Surveillance

05/15/2024

AR 2024-4363-6

Evaluate 2-HV-SGTR-FD-27 Failed to Close During

Surveillance

05/15/2024

AR 2024-6092

Cables Missing Associated Fire Zones

08/06/2024

AR 2024-9099

Issue with Change to Commitment 8249

2/12/2024

AR 2024-9357

Ton CO2 Tank Pressure Alarm

2/26/2024

AR 2025-0402

SS-SE-2023-0037-01 Lacking Detail

01/25/2025

AR 2025-1933

Painted Sprinkler Heads on 2-ZFP-507 and 2-ZFP-202

03/13/2025

AR 2025-2004

License Renewal Inspections Not Maintained as

Quality Record

03/17/2025

AR 2025-2016

PMP-2270-CCM-001 Violation / Missed Combustible

Watch - No Fire Watch On Fire Seal W3073 Removal.

03/17/2025

AR 2025-2687

Required NFPA 805 Tours Not Performed on Time

04/02/2025

Corrective Action

Documents

AR 2025-2763

Missed NFPA 805 Tours

04/04/2025

AR 2025-5582

Loose CO2 Pipe Clamp

07/14/2025

AR 2025-5611

Non-Material Error in PRA HRA Database

07/15/2025

AR 2025-5623

2-ZTA-402 Reading is Lower Than Expected

07/15/2025

AR 2025-5731

Untagged Cut Cable Identified in the U1 CRCV

07/14/2025

Corrective Action

Documents

Resulting from

Inspection

AR 2025-5884

PM 12647702 Not Maintained as Quality Record

07/23/2025

DC-16739

Fire Protection Unit #2 Turbine Building Below El. 633'-0"

Generator End Mezzanine Floor

DC-16740

Fire Protection No. 2 Turbine Room Below El. 633'-0"

Generator End Mezzanine Floor

OP-12-5154A-16

Flow Diagram Halon/FM-200 Fire Protection Unit 1 & 2

OP-12-5154B-12

Flow Diagram Halon/FM-200 Fire Protection Unit 1 & 2

OP-2-5153G-9

Flow Diagram Fire Protection CO2 Lower 4KV Areas Unit 2

OP-298219-16

Motor Driven AUX. Feedwater Supply System

71111.21N.05

Drawings

PS-2-92089-20

Control RM. Southwest Rear A.C. & D.C. Dist. CCV-CD

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

PS-2-92133-20

Hot Shutdown Panel HSD1

PS-2-94257-7

600 VAC Aux Bus 21D 2-EZC-D (ESS) Rear

PS-2-95010-14

Auxiliary Feed Pumps

PS-2-95036-25

Feed Water Valves

EC-53510

1-FMO-212, Rewire the Motor Operated Valve (MOV)

to Meet NFPA 805 Transition Project Requirements

EC-53511

1-FMO-222, Rewire the Motor Operated Valve (MOV)

to Meet NFPA 805 Transition Project Requirements

EC-53512

1-FMO-232, Rewire the Motor Operated Valve (MOV)

to Meet NFPA 805 Transition Project Requirements

EC-53513

1-FMO-242, Rewire the Motor Operated Valve (MOV)

to Meet NFPA 805 Transition Project Requirements

Engineering

Changes

EC1002711

NFPA 805 Cable Ignition Concern DownstreBD-C-R1EL

and 2-ABD-C-R2AR MCC Cubicles

11-68

Closed Head Sprinkler Sampling/Testing/Replacement

Program Plan Basis Document and Proposed Closed Head

Spray Head Sampling Plan

11-73

Review of NRC Commitment #8249 for 50 Year Inspection

of Sprinkler Heads

23-0037-01

License Renewal Program Commitment #8249 Change

DCC-PV-110-

QCF

Shop and Field Fabrication and Erection of Fire and

Protection Piping

EDG-PIPE-06

Pipe Support Design Guideline

EEE-11-62

Fire Water Supply NFPA 20 Code Conformance Review

EEE-11-71

Unit 1 FZ 41 and 42B / Unit 2 FZ 46 and 46B Fire Door

Closure Evaluation

EEE-12-33

Evaluation of Sprinkler Densities Associated with 2-ZFP-185

R1900-0026-001

Recovery Action Transition in Support of NFPA 805

R1900-0411-AA2

Detailed Fire Modeling Report Fire Compartment: AA2 Unit

and Unit 2 Turbine Building, Main Steam Enclosures

and Pipe Tunnels

Engineering

Evaluations

R1900-0411-

AA43

Detailed Fire Modeling Report

Fire Compartment: AA43

Unit 2 Engineered Safeguards Systems and Motor Control

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Center Room (El. 609 ft. 6 in.)

R1900-0411-

AA44

Detailed Fire Modeling Report

Fire Compartment: AA44

Unit 2 Emergency Power Systems Area (El. 609 ft. 6 in.)

R2527-001-001

Fire Protection Water Main Loop and Fire Pump Set Point

Adequacy Determination

FSA

D. C. Cook Fire Safety Analysis (FSA)

R1900-0024-001

Nuclear Safety Capability Assessment

R1900-0024-003

NFPA 805 Nuclear Safety Capability Assessment SAFE

Reports

Fire Plans

R1900-0041-

0001

Plant Boundary Partitioning Drawing

1-2-EDS-109

Cable Identification

1-2-EDS-111

Design Criteria and Documentation of Abandoned and

Spare Items

1-IHP-4030-166-

015

Unit 1 Control Room Cable Vault Halon Fire Protection

System Test

1-OHP-4030-066-

25

UNIT 1 NFPA 805 REQUIREMENTS FOR UNIT 2

2-EHP-5022-

001-001

Facility Inspection and Mitigation Program

2-FPP-2270-

066-011

Fire Watch Activities - Fire Watch Logs

(from 3/31/25 to 4/4/2025)

2-FPP-2270-

066-033

Other Fire Protection Equipment Inspections

2-FPP-2270-

066-034

Monthly Checks of Wet Pipe Sprinkler System Pressure

(Apr-Jul 2025)

2-FPP-4030-

066-002

TRM Wet Pipe Sprinkler Alarm Tests

2-FPP-4030-

066-006

Three Year Fire Protection Water System Unobstructed

Flow Test

Procedures

2-FPP-4030-

066-007

Control Room Cable Vault Halon Bottle Surveillance

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2-FPP-4030-

066-011

Fire Protection Valve Lineup Verification

2-IHP-5021-

EMP-033

Cable Removal and Installation

2-OHP-4025-

001-002

Fire Response Guidelines

2-PPP-2270-

066-001

Portable Fire Extinguisher Inspections

2-IHP-5040-EMP-

20

Provide Temporary Power from Non-Plant Bus Source to

the Unit 2 Containment Welding Receptacles During a Unit 2

Refueling Outage per 2-TM-15-48

2-OHP-4025-001-

001

Emergency Remote Shutdown

2-OHP-4025-LS-

Start-Up AFW

2-OHP-4030-214-

045

Unit Cross-Tie Surveillance

2-OHP-4030-256-

017E

East Motor Driven Auxiliary Feedwater System Test

ES-CABLE-0221-

QCN

Design and Installation Criteria for Cable, Trough, and

Conduit

PMP-2010-PRC-

003

Procedure and Work Instructions Use and Adherence

PMP-4100-SDR-

2

Outage Risk Assessment and Management

PMP-5020-RTM-

001

Restraint of Transient Material

PWROG-18018-

P

RCP Shutdown Seal Conditions

following a Loss of Seal Cooling

with Asymmetric AFW for

D. C. Cook Units 1 & 2

C10025933

Scaffolding Clearance Engineering Review

10/28/2024

Work Orders

C10041805-001

MTI, Perform Surveillance, 2-IHP-4030-266-012, CO2

System Fire Zone 45

07/13/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

C10043825

2-ZFP-185, Inspect All Type 11 & 12 Sprinkler Heads

11/22/2023

C10046461-001

MTP, 2-IHP-4030-266-003, Fire Damper Testing 600V

SWGR Room

05/17/2024

C10075127-001

Fire Protection System Loop Flow Test No. 1

07/01/2025

C10075128-001

Fire Protection System Loop Flow Test No. 2

07/02/2025

C10075142-001

Fire Protection System Loop Flow Test No. 3

07/02/2025