SUBJECT:
DONALD C. COOK NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000315/2025401 AND 05000316/2025401
Dear Kelly Ferneau:
On July 24, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000315 and 05000316
License Numbers:
Report Numbers:
05000315/2025401 and 05000316/2025401
Enterprise Identifier:
I-2025-401-0065
Licensee:
Indiana Michigan Power Company
Facility:
Donald C. Cook Nuclear Plant
Location:
Bridgman, MI
Inspection Dates:
July 07, 2025 to July 24, 2025
Inspectors:
N. Egan, Sr Physical Security Inspector
K. Maloney, Sr Physical Security Inspector
Approved By:
Michael E. Ziolkowski, Chief
Security, Emergency Preparedness, and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Donald C. Cook Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
(1)
- 02.01 c; 02.02 c-f; 02.04 a-e; 02.05 a; 02.06 a-d; 02.08 f, i; 02.09; 02.10 a
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
procedure elements: Security Training
(1)
- 2.01 a; 2.02 a-e; 2.03 a-c; 2.04 a; 2.05 a; 2.06 b; 2.10; 2.13 a
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements: 02.01 a-e
Security Plan Changes (1 Sample)
- (1) Since the last NRC baseline inspection of this program area, Security Plan Revision 23 to 24 was implemented. Based on Indiana Michigan Power Company's evaluation, and in accordance with 10 CFR 50.54(p)(2), the changes resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change(s)continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those changes. Therefore, the changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) July 1, 2024, through June 30,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On July 24, 2025, the inspectors presented the security baseline inspection results to Kelly Ferneau and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
DTG-SPS-036
Visitor Processing
DTG-SPS-068
PA Fence and Gate Patrol
DTG-SPS-076
Administrative Controls for Safeguards Information
PMP-2030-SIC-
001
Protection of Nuclear Security Documents/Records
SPP-2060-SPS-
209
Protected Area Access/Exit Requirements
Procedures
SPP-2060-SPS-
308
HGU and Card Readers Tests
AR 2025-5440
Approved NRA Rifle Day Fire Qualification Letter has
Incorrect Date.
07/08/2025
AR 2025-5440
Approved Rifle Day Fire Qualification Letter has Incorrect
Date
07/08/2025
Corrective Action
Documents
Resulting from
Inspection
AR 2025-5511
NRC Observations of Tactical Course of Fire Qualifications
07/09/2025
Course of Fire
National Rifle Association Duty Rifle Thermal Qualification
Approval Letter
04/22/2022
Course of Fire
National Rifle Association Duty Rifle Day Qualification
Approval Letter
01/11/2025
Course of Fire
National Rifle Association Duty Rifle Night Qualification
Approval Letter
01/11/2025
Instructor
Qualification
NRA Patrol Rifle Instructor Qualifications (7 total)
03/12/2024
Qual-SE-C-XX-
Base
Qualification
New Hire SE-Q-AR, SE-Q-AO, SE-Q-RT Base
Qualification Training Documents
SE-C-AR019
23 AR-15 Day/Night Response Rifle Qualification
Documents
SE-C-AR019
24 AR-15 Day/Night Response Rifle Qualification
Documents
Miscellaneous
SE-C-AR019
25 AR-15 Day/Night Response Rifle Qualification
Documents
SE-C-WP001
23 Physical Fitness Test Department Results
01/01/2023
SE-C-WP001
24 Physical Fitness Test Department Results
01/01/2024
SE-Q-FOF01-1
New Hire Records Force on Force 40 Hr. Qualification
Card
Miscellaneous
Test B
24 Security Officer Annual Exam
SPP-2060-SFI-
501
Training and Qualification Plant Implementing Procedure
Procedures
TDP-600-SEC
Security Training Program Description
Self-Assessments
24-7622-1
Quick Hit Self Assessment Report for Security Training
01/13/2025
Donald C. Cook Physical Security Plan
Donald C. Cook Physical Security Plan
Miscellaneous
List of Changes Affecting the Donald C Cook Nuclear Plant
Security Plan