ML17319B132

From kanterella
Jump to navigation Jump to search
Forwards IE Enforcement Conference Repts 50-315/81-27 & 50-316/81-31 on 811102.No Noncompliance Noted
ML17319B132
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/30/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO.
Shared Package
ML17319B133 List:
References
NUDOCS 8201180529
Download: ML17319B132 (4)


See also: IR 05000315/1981027

Text

OEC

3 0 198)

XgHQZ~yggg,

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Electric Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

gpQPgl oo

Jgg g'5 198K

5~~ gyggg Q

'gQC

This refers to the Enforcement

Conference

held on November 2, 1981, at the

American Electric Power office in Columbus,

Ohio, between

me and members of

my staff and you and members of your staff for the purpose of discussing

your proposed plans for upgrading the operations

at the D.

C.

Cook Nuclear

Plant

as documented in your letter dated October 16,

1981

(AEP:NRC:0625).

The enclosed

copy of our report of this Enforcement

Conference identifies

areas

discussed

during the meeting.

No items of noncompliance with NRC requirements

were identified during

the course of this meeting.,

During this Enforcement

Conference

we requested

that you supplement your

October 16,

1981 letter to provide more details

on your corrective action

plans including schedules

and commitments.

We also expect to be kept fully

informed of steps

taken and the results

achieved for each part of your

current plan,

as well as any additional areas

you find that need to be

addressed.

Additionally, you are reminded that during our review of these

matters, particular attention will be given to the accuracy of the infor-

mation you provide.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter, the enclosures,

and your response

to this letter will be placed

in the NRC's Public Document

Room, If this report contains

any information

that you (or your contractors)

believe to be exempt from disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

820ii80529 811230

PDR

ADQCK 05000315

PDR

~~+/

51

0

f,

tl

A

( F

V

'r

s J)t,;

'l4'

I

'g$ ~Jf ~a

)~ i! g,

~

1.

t

l'

k

(1

'N

American Electric Power Service

Corporation

to file a request for withholding; and (b) submit within twenty-five (25)

days

from the date of this letter

a written application to this office to

withhold such information. If your receipt of this letter has been delayed

such that less

than seven

(7) days are available for your review, please

notify this office promptly so that

a new due date

may be established.

Consistent with Section 2.790(b)(l),

any such application must be accom-

panied by an affidavit executed

by the owner of the information which

identifies the document or part sought to be withheld,

and which contains

a full statement

of the reasons

which are the bases

for the claim that

the information should be withheld from public disclosure.

This section

further requires

the statement

to address

with specificity the considera-

tions listed in 10 CFR 2.790(b)(4).

The information sought to be withheld

shall be incorporated

as far as possible into a separate

part of the affi-

davit. If we do not hear from you in this regard within the specified

periods noted above,

a copy of this letter, the enclosures,

and your

response

to this letter will be placed in the Public Document

Room.

The responses

directed by this letter

(and the accompanying Notice) are

not subject to the clearance

procedures

of the Office of Management

and

Budget as required by the Paperwork Reduction Act of 1980,

PL 96-511.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

Originai signed

bY

James

G. Keppler

James

G. Keppler

Regional Administrator

cc:

D. V. Shaller, Plant Manager

DMB/Document Control Desk

(RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

ay

jp

12/28/81

y'I

RIII

Knop

Spessard

Warnick

13/i!//f/

RI I

RII

Davis

K pplgr

)@IsOJ et

II

l

I

'

l