IE Mgt Meeting Repts 50-313/80-14 & 50-368/80-14 on 800820. No Noncompliance Noted.Major Areas Discussed:Activities at Site from 790101 to 800819
ML19340B178
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/05/1980
From: Callan L, Gagliardo J, Hunnicutt D, Johnson W, Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19340B177 List:
References
50-313-80-14, 50-368-80-14, NUDOCS 8010210605
Download: ML19340B178 (4)


Text

--

u)

.

'

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

Report Nos. 50-313/80-14 50-368/80-14 Docket Nos. 50-313 and 50-368 Licensee: Arkansas Power and Light Company P. O. Box 551 Little Rock, Arkansas 72203 Facility Name:

Arkansas Nuclear One, Units 1.and 2 Meeting at:

AP&L Corporate Office, Little Rock, Arkansas Meeting conducted: August 20, 1980

.

et, ()

&M Y[#/8O NRC/IE Personney :

L. J. Callan, Resident Inspector

'

Date b 9x A. 6 4 Wr/8o gJ.E.Gagliardo, Chief Date

'

'

Nuclear Support Section wLa wu

.

D. M. Hunnicutt, Chief, Project Section No. 2'

Uate hE Y-x W

$/SO eu er.

,

.

Y., W. D. Johnson, Senior Resident Inspector

/ Date NRC/NRR Perso el: R. E. Martin, Project Manager, NRR G. S. Vissing, Project Manager, NRR Approved by:

CS h

$!N

'G.

L. Madsen, Chief, Reactor Operations Date and Nuclear Support Branch, n7.V

'

80I.togy.o g y

--

-

-

-

_

.

- -.

Meeting Summary:

,

I Meeting on August 20, 1980 (Recort Nos. 50-313/80-14 and 50-368/80-14)

Scope:

Special announced management meeting to discuss the region's first annual ~ evaluation of the licensee's performance ' relative to activities at

~

the-ANO-site.during7the period of January 1,- 1979 through August 19, 1980.

>

e The' evaluation involved sixty-eight (68) man-hours onsite by seven (7) NRC personnel and the meeting involved thirty-five (35) man-hours in the corporate office by seven (7) NRC personnel.

Results: Of the seventeen functional areas evaluated, the licensee's perfor-mance in thirteen areas was such that no change in the frequency or scope of the inspection program for those areas is recommended.

The licensee's per-formance in four areas (training, security,. reporting, and quality control)

was such that-increased inspection effort is planned in those areas.

,

i e

i i

.

,

e

.

-.

,

.-.,

- -,,

.

.

.

3

&

DETAILS 1.

Persons Attending the Meeting a.

Arkansas Power and Light Company W. Cavanaugh III, Vice President, Generation and Construction B. Craddock, Manager, Availability Engineering C. Dunn, Manager, Security T. Eras, Licensing Supervisor J. Griffin, Manager, Nuclear Operations L. Humphrey, Manager, Plant Administration T. Kilgore, Director Generation Technology J. Marshall, Manager, I&C Engineering G. Miller, Manager, Engineering and Technical Support B. Morehead, Director, Administrative Services J. O'Hanlon, ANO General Manager M. Pendergrass, Director, Generation Engineering D. Rueter, Director, Technical and Environmental Services L. Schempp, Manager, Nuclear QC D. Sikes, Director, Generation Operations D. Trimble, Manager, Licensing L. Young, Licensing Supervisor b.

NRC J. Callan, Resident Inspector, RIV J. Gagliardo, Section Chief, RIV D. Hunnicutt, Section Chief, RIV G. Madsen, Branch Chief, RIV R. Martin, Project Manager, LRR W. Johnson, Senior Resident Inspector, RIV G. Vissing, Project Manager, NRR 2.

The NRC personnel and the licensee representatives listed above met to

]

discuss the region's first annual evaluation of the licensee's performance.

A regional representative discussed the listing of NRC performance evalu-ation efforts and the details of the current system which includes the annual regional evaluation.

The regional representatives presented the findings of the evaluation

,l (Enclosure 1) and _the enforcement-history and significant reportable i

events that were considered in the eva;uation.

Licensee representatives j

made a detailed presentation of the status and current plans for the security system.. Licensee. representatives also discussed'the problems experienced with the. Unit 2 Emergency Feedwat.er Pump (2P7A) and the actions being rf, to resolve the problem.

._.

_

-

-

.

.. -

4 Tbhjlicensee's Vice: President,' Generation and Construction and the ANO c

.

'

- General Manager: described the reorganization plans for the site and

.

corporate office.

'

,

For:the four-areas in Enclosure 1 that'have been categorized as

requiring: increase inspection-effort, Region IV plans to.take the following. action:

'a.

Training - RIV will closely follow the development and1 implementation of.thel licensee's new training. program as discussed during the

. August 11. 1980 management meeting and as presented in the licensee's letter 1/ of August 13,'1980..The inspection frequency in this area

will be increased until the licensee's commitments have been met.

b.

Security - RIV will increase the inspection frequency in this area

,

--until all security systems are in place and operational.

The-inspections will closely monitor compliance with the licensee's

,

committed compensatory measures.

I

c.

Reporting - RIV management wil-1 supplement the reviews of the resident, inspectors of~LER's to provide more overview of this area.

d.

Quality Control - RIV resident inspectors will increase the frequency

of their observations of QC's involvement in the inspection and monitoring of licensed activities.

- The NRR Project Managers listed above were members of the evaluation board I

and also provided comments during the meeting regarding their perceptior

,

of.the--licensee's performance.

Thetlicensee expressed no significant disagreement with the evaluations.

.1 i

s

-

-

!

.

-

Y

/1/

Letter W. Cavanaugh.'.(AP&L) to K. V. Seyfrit (ilC/RIV) dated August 13, 1980.

-

-

e

.

-

>

-

I

-,

-

w r

-., -,,,,

-

- - >