Forwards IE Mgt Meeting Repts 50-313/80-14 & 50-368/80-14 on 800820.No Noncompliance Noted.Performance Evaluation Encl
ML19340B176
Person / Time
Site: Arkansas Nuclear  
Issue date: 09/05/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19340B177 List:
References
NUDOCS 8010210600
Download: ML19340B176 (6)


See also: IR 05000313/1980014

Text

"

-

-

. ..

__.

..

_ , _

8

_.

M arcoi

,

,

.

UNITED STATES

/

..

/

h

. NUCLEAR REGULATORY COMMISSION

8 V [' I

'S

611 RY AN PLAZ A oRIVf., SWTE 1000

REGloN IV

i'l

e

-

/ ,f ..

ARLINGTON TE."*

76012

'%'s

2

/

%

/ /,

September 5, 1980

.....

In Reply. Refer To:

Dockat Nos.' -50-313/80-14

>

,

50-368/80-14'

Arkansas Power and Light Company

' ATTN: Mr. William Cavanaugh III

Vice President of Generation

and Construction

P. O. Box 551

.

Little Rock, Arkansas

72203

Gentlemen:

This refers to the management meeting held at your corporate offices on

August 20,.1980. The purpose of this. meeting was to discuss the Region's

first annual evaluation of AP&L activities relative to the ANO site. This

evalaation was made in accordance with the requirements of Task I.B.2 of the

"NRC Action Plan Developed as a Result of the TMI-2 Accident" (NUREG 0660)

and the NBC program entitled-Systematic Assessment of Licensee Performance

,

!

(SALP).

t

(

The functional areas in which your performance was evaluated and the results

of the evaluation.are documented in Enclosure 1 to this letter. Details of-

the meeting are discussed in Enclosure 2.

No new items'of~ noncompliance were identified during the evaluation.

Based on

the results of.this evaluation Region IV will increase the frequency and/or

scope of' inspection and review activities in four areas. 'The four areas involved

and a summary of the Region's plans for increasing inspection efforts in those.

areas'are discussed in Enclosure 2.

No written reply is required in response

to this' letter.

In accordance with:Section 2.790 of-the NRC's " Rules of Practice," Part 2,

. Title 10, Code of Federal' Regulations, a copy of this letter and the enclosures

will-be.placed in the NRC's Public Document Room.' If this material contains

i

any.information that you or;your-contractors believe to be proprietary,

it is

!

_necessary that'you make'a written application within twenty'(20) days to this

i

.' office to withhold such information :from public disclosure. .. Any such applica-

tion must include a-full: statement of the reasons on the basis of which 'it is .

Lelaimed that the'information is proprietary, and should be' prepared so that

~

l proprietary information identified in the application is contained in a separate

P

part of ti e document.1. If we do not- hear from -you in this regard within the

specified period, the. letter and: enclosures will be.placed in the Public Docu-

ment Room.-

4

8'01021060o

Q

nw;

-

.

..-

-

..

.. =-

.

>j

.

.

Arkansas Power and Light Company

2

September 5, 1980

Should you have'any questions concerning this material, we will be glad to

' discuss them with.you.

Sincerely,

,f.

'

0&

,

G. L. Madsen, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures.

1.

Performance Evaluation - Arkansas

Nuclear One, August 1980:

2.

IE Inspection Report Nos.

50-313/80-14 and 50-368/80-14

cc w/ enclosures:

James P. O'Hanlon, Plant Manager

P. O. Box 608

Russellville, Arkansas

72801

.

)

.

.a

j

_ _ _ _ - _ _ _ _ _ - _ _ _

ENCLOSURE 1

,

.

Parform:nca Evaluation

Arkansas Nuclear One

August 1980'

REGION

IV

LICENSEE PERFORMANCE EVALUATION (OPERATIONS)

Facility:

Arkansas Nuclear One

Licensee:

Arkansas Power and Light Company

Unit Identification:

Docket No.

' License No./Date of Issuance

Unit No.

50-313

DPR 51/May 21, 1974

1

50-368

NPF 6/ September 1, 1978

2

Reactor Information:

Unit 1

Unit 2

Unit 3

NSSS

B&W

CE

MWt

-2568

2815

Appraisal Period:

January 1, 1979 through August 19, 1980

Acoraisal Comoletion Date:

August 19, 1980

Review ~ Board Members:

G. L. Madsen, Chief, Reactor Operations & Nuclear Support Branch, RIV

D. M. Hunnicutt, Chief, Reactor Projects Section #2, RONSB, RIV

J. E. Gagliardo, Chief, Nuclear Support Section, RONSB, RIV

  • l

R. E. Martin, Proj ect Manager, NRR

j

G. S. Vissing,- Proj ect Manager, . NRR

i

W. D. Johnson, Senior Resident Inspector, RONSB, RIV

j

L. J. Callan, Resident Inspector, RONSB RIV

l

!

.

A.

Numoer and Nature of Noncomoliance Itams

Noncomolianca category:

Unit 1 (only)

Unit 2(only)

Unit 1 & 2

Violations

0

0

0

Infractions

13

18

26

Deficiencies

2

0

2

Areas of Noncomolianca:

Unit 1 (only)

Unit 2 (only)

Unit 1 & 2

(List Areas as Required)

Management Control

2

1

Plant Operations

5

7

Maintenance

1

2

1

Surveillance Testing

1

4

2

Training

i

1

Radiation Protection

2

2

5

Emergency Planning

2

Fire Protection

1

1

1

Security

1

13

Design Change

2

Committee Activities

3

Total

15

18

28

3.

Numoer and Nature of Licensee Event Recorts

,

Type of Events:

Unit 1

Unit 2

Unit 3

Personnel errors

14

19

Defective crocedures

4

3

Casually-linked events

5

6

Licensee Event Recorts Reviewed (Recort Nos. )

l

50-313/79-01

through 50-313/79-24

50-313/80-01

through . 50-313/80-25

50-313/80-28

50-368/79-01

through 50-368/79-104

,

50-368/80-01

through 50-368/80-46

_l

'

50-368/80-49

.

-_

-_.

.

-

C.

Escalated Enforcement Actions

Civil Penalties

None.

Orders

None.

Immediate Action Letters

None.

D.

Manacement Conferences Held During Past Twelve Months

Conference held in RIV offices (at the licensee's request) on August 11, 1980

to discuss possible excalated enforcement action from Inspection 80-12 and

licensee's presentation of plans for upgrading training.

E.

Justification of Evaluations of Functional Areas Catecorized as Recuiring

an increase in Insoection Frecuencv/Scoce ( See evaluation sneets )

Training - The licensee's training program, management's overview of the

training area, and the overall effectiveness of the training

program have been weak.

i

Security - The licensee's security program has not been fully implemented

and not all of the prescribed security =easures have been estab-

lished.

Reporting - The extent of management's overview in this area and the communi-

cations between individuals with responsibilities in this area

have been weak and have led to reporting inadequacies.

Quality Control ' - The licensee's program in this area, the extent of manage-

ment's overview, and the attitude toward assuring an effective

-l

inspection program have been weak.

..

. . _ .

_

_ _ .

_ _ . _ _ _ _ _ - _ _ _

- _ _ _ _ _

__

.

k

Inspection

i

Frecuency and/or $ccoe

{

FUNCTIONAL AREA

Increasa

No. Change

Oecrease

.

1.

Management Control

l

l

X

l

1

-

I

2.

Plant Operations

'

4

x

3.

Refueling Ocerations & Activities

x

j

1

Maintenanca

x

.

j

5.

Surveillance & Preoperational Testing

l

x

5.

Training

x

l

7.

Radiation Protection

l

x

3.

Environmental Protection

t

X

t

c-

,

9.

Emergency Planning

x

2

10.

Fire Protection

i

x

i

11.

Security & Safeguards

x

.,

4'

12.

Design Changes & Modifications

x

i

j

13.

Reporting

x

{

14.

QA Audits-

x

}

15.

Committee Activities-

x

i

15.

Quality Control

x

17.

Procurement

l

x

4

1

l

2

j

.a

,

!

r l

? U@J

G. L. Madsen, Chief RONSB

,

jf s to

Cate

.

.

, . ,

~.

,.

-

,

, --

-

. . , - . _ , . . , . .