Discusses Insp Rept 50-313/72-05 on 720621-22.No Noncompliance Noted.Major Areas Inspected:Preoperational Testing Program Status & Control Procedures,Bechtel Startup Manual & Sys Release Packages & Plant Personnel
ML19320A098
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/07/1972
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Phillips J
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8004140704
Download: ML19320A098 (2)


Text

,

- _ - _ - _ _

_

  • .

.N.

',,

.

-

j

,

'

'

.

,,

,i.s

-

-

-

-

.

t'#4'\\

ATOMIC ENERGY CiOMMISSION

-

'

I UNITED STATES hKMU.AJLAfxs_x'?AM I

X*

s

!

.

REG 'O *4 II.- S u l T E 0 8 p

e M[

230 P E AC HT R E E ST A E ET NORT HW EST

.r,

,

g AT L A NT A. GEQAGl A 30303 U (1 IT DIRECTORATF OF REGULATORY OPERATIONS

.

In Reply Refer To:

July 7, 1972 RO:II:RW 50-313/72-5

.

,

Arkansas Power and !".ght Company

.

Attn:

Mr. J. D. Phillips Vice President and Chief Engineer Sixth and Pine Streets Pine Bluff, Arkansas 71601

,

Gentlement This refers to the inspection conducted by Mr. R. F. Warnick and other members of this office on June 21-22, 1972, of the activities s

/

authorized by AEC Construction Permit No. CPPR-57 for the Arkansas

,

V Nuclear One, Unit 1 facility, and to the discussion held with Mr. J. W. Anderson and other members of your staff at the conclusion of the inspection.

'

\\

Areas examined during this inspection included the status of the preoperational testing program and the test program administrative control procedures. Within these areas, the inspection consisted of l

selective examination of operation and test procedures, the Bechtel Startup Manual, system release packages, interviews with plant per-sonnel, and observations by the inspectors.

.

Within the scope of this inspection, no items of nonco=pliance were identified.

A reply to this letter is not necessary; however, should you have any '

questions regarding this inspection, we vill be glad to discuss them

.vith you.

Very truly yours,

\\

!

\\

/,

.

,

f~)

[JohnG. Davis (

)

Director v

,

'

800414078Y k

,

i

,-

,. A.

w

-

'

.

..

...

Ltr to Arkansas Power and Light Company dtd T/7/72

.

DISTRIBUTION:

J. B. Henderson, RO J. G. Keppler, RO RO Office of Operations Evaluation

.

RO AD for Procedures

.

RO AD for Inspection & Enforcement L, DD for Reactor Projects R0 Files DR Central Files PDR Local PDR NSIC DTIE

.

.

.

O

-

l

.