U.S. NUCLEAR REGULATORY COMMISSION Region I Report No. 82-02 Docket No. 50-309 License No. DPR-36 Priority Category C

--

Licensee: Maine Yankee Atomic Power Company 20 Turnpike Road Westborough, Massachusetts Facility Name: Maine Yankee Atomic Power Station Inspection at: Wiscasset, Maine Inspection conducted:

February.1 - 4, 1982 Inspector:

h/ <

v8 3/r/Mz_

A. E. Finkel, Reactor Inspector date signed Approved by:

4A afI

  1. L S. D. Ebneter, Acting Chief, Plant date signed Systems Section Inspection Summary Inspection on February 1 - 4, 1982 (Report No. 50-309/82-02)

Areas Inspected:

Routine unannounced inspection of the plant's Fire Protection /

Prevention Program including: implementation of administrative procedures; fire brigade training; observation of ignition source and combustible material control; review and observation of fire protection systems modifications; review of surveillance test records associated with fire protection systems.

The inspection involved 34 hours3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> on site by one NRC regional based inspector.

Results: No items of noncompliance were identified.

.

8203250299 820305 PDR ADOCK 05000309

.

G PDR

,

.

L

-.-.. a

.

.

.

.

Details 1.

Persons Contacted Maine Yankee Atomic Power Company R. Bickford, Assistant Operations Department Head W. Brawn, Fire Protection Coordinator

J. Brinkler, Technical Support Department Head

A. Jordan, Operation QA Coordinator

R. Lawton, Quality Assurance R. Prouty, Maintenance Department Head E. Wood, Plant Manager

U.S. Nuclear Regulatory Commissign P. Swetland, Resident Inspector

  • Denotes those present at the exit interview.

2.

Fire Protection / Prevention Program a.

Administrative Procedures The inspector reviewed the following administrative procedures:

YAEC Safety Manual, dated October 14, 1977;

--

Section 4, Material Storage; Section 5, Hazardous Chemicals, Gases, and Materials; Section 2, Housekeeping; Section 8, Welding, Cutting, Brazing; Section 10, Fire Prevention and Control, a.

The inspector verified that the administrative procedures include control of combustibles as follows:

(1) Special authorization for the use of combustible, flammable or explosive hazardous material in safety-related areas.

(2) Prohibition on the storage of combustible, flammable, or explosive hazardous material in safety-related areas.

b.

Fire Protection Plan Procedure 2.60.1, Revision 2, dated November 6,1980, entitled,

" Fire Emergency Procedure";

-.

.

Procedure 2.60.2, Revision 2, dated December 21, 1981, entitled, " Fire Equipment Inspection Procedure";

Procedure 2.60.5, Revision 3, dated November 6, 1980, entitled,

" Fire Suppression System Maintenance";

Procedure 2.60.6, Revision 3, dated December 21, 1981, entitled, " Fire Training"; and Procedure 2.60.9, Revision 0, dated April 10, 1980, enti tled,

" Fire Fighting Plan for Cable Vault."

Procedure 2.60.10, Revision 0, entitled, " Fire Fighting Plan for Control Room".

The inspector verified that the licensee has established a fire brigade training program in accordance with guidelines outlined in the NRC document entitled, " Nuclear Plant Fire Protection, Functional Responsibilities, Attachment 2."

Adequate facilities are provided for conducting fire fighting practice sessions on site for fire brigade members.

3.

Facility Tour During an inspection of the control room, the inspector identified the following items:

A full aerosol cleaning can marked, " Flammable" was being used by the cleaning people in the control room. The control and authorization of this material for use in the control room could not be identified by the licensee. This item is considered unresolved, pending NRC review of the licensee's corrective action.

(309/82-02-01).

Paper candy wrappers, cigarette butts, and a 1 gallon plastic can of

!

HiGreen wire pulling lubricant were found inside electrical equipment located in the control room by the inspector.

Paper boxes were also i

found inside the Pyra-A-Larm Control cabinets in the control room.

This item is considered unresolved, pending NRC review of the licensee's corrective action.

(309/82-02-02).

!

4.

Maintenance, Inspection and Tests The inspector reviewed the following procedures:

--

Procedure No. 2.60.2, Revision 2, dated December 21, 1980, entitled,

" Fire Equipment Inspection Procedure"; and Procedure No. 2.60.2, Revision 2, dated November 6, 1980, entitled,

--

" Fire Emergency Procedure" and " Fire Pump Testing" No. 3.1.9.,

Revision No. 11, dated December 21, 1981.

. - - _

.

.

_

-

-

-

..

.

.

The inspector verified that the licensee conducts a monthly inspection of the plant's fire protection systems and fire brigade equipment.

The inspector reviewed the 1981 " Fire Pump Testing" test results, as defined in Procedure 3.1.9., and determined that the system met the test requ'irements of the procedure.

During a review of the " Fire Protection Water System" drawing No. FM-89-B, the inspector identified valve FS-13, a 20" butterfly valve that cross connects the inputs of the P-4 motor driven fire pump and P-5, diesel driven fire pump as not being tested in the monthly and yearly test requirements portion of " Fire Pump Test" No. 3.1.9. procedure.

The licensee stated that a review of the " Fire Protection Water System" drawing No. FM-89-B and Procedure 3.1.9. to assure that all required testing will be performed on the system valves will be performed.

This item is considered unresolved.

(309/82-02-03).

During the verification of fire protection valve positions, the inspector verified that the post indicator for the underground valves in the yard was locked in the open position and that valve cycling was verified during January, 1981 testing as defined in Procedure 3.1.9.

5.

Review of Surveillance Test Records Associated with Technical Specific-ation Requirements The inspector selected for review the following records to verify that the associated required Fire Protection Program surveillances had been performed and that the acceptance criteria had been met.

Procedure 3.60.1, Carbon Dioxide System Testing;

--

--

Procedure 3.60.2, Fire Main System Testing; Procedure 3.60.3, Smoke Detector Testing;

--

j

--

Procedure 3.60.4, Fire Barrier Penetration Seals; Procedure 3.60.5, Fire Pump Capacity Test;

'

--

--

Procedure 3.60.6, Sprinkler System Testing; Hydrostatic Hose Test Data.

--

.

l The above test reports were in a locked file drawer of the Fire Loss

!

Prevention Coordinator, who was not at the site during this inspection l

period. The licensee was not able to open the locked file cabinet l

while the inspector was on site. The inspector informed the licensee that the NRC Resident will review this test data to assure that the system is in compliance with specification requirements. This item is unresolved pending review of the test data results by the NRC.

(309/82-02-04).

6.

Fire Documentation and Records Fire training and retraining records were locked in the Fire Loss Prevention Coordinator file cabinets, and were not available for the l

l

.

.

inspector to review.

In discussions with site personnel, it appears that fire training has been conducted, but the level and type of training could not be determined by the inspector during this inspection period.

The " Fire Training" Procedure No. 2.60.6 states in paragraph 4.3.4 that, " Plant personnel training shall be documented in accordance with the general plant training program, Procedure 00-00-6, which states in paragraph 4.4.5:

" Attendance at the retraining lectures shall be documented using the lecture attendance sheet MY-T-4-77.

The training group shall then transfer this information to Form MY-T-6-77, annual plant training record." It appears that the fire training records have not been provided to the training group for transfer to the MY-T-6-77 form.

This item is unresolved pending a review of the training records of the licensee.

(309/82-02-05).

Fire Training Procedure 2.60.6, Revision 3, dated December 21, 1981, in paragraph 4.2 entitled, " Operator Training Program" references Procedure 0-00-5.

This procedure has been cancelled and is not available for use.

The 2.60.6 Procedure requires updating to remove 0-00-5 and add in the correct procedure reference.

This item is unresolved.

(309/82-02-06).

7.

Fire Protection Modification Required by Amendment 37 to DPR-36 During this inspection period, the inspector selected the following areas the to assure that the equipment was being maintained in accordance with specification requirements.

Fire Detection Systems

--

The inspector reviewed PDCR 6-79 and verified that the licensee installed fire detection devices in all areas identified in the SER.

Power supply to the system is obtained from a vital bus.

Technical specification surveillance procedure has been updated to reflect the new installation.

The equipment appears to be well maintained.

Hose Stations

--

The inspector verified that the licensee extended hose protection to all areas outlined in the SER. The hose stations appeared in new condition; but, as discussed in paragraph 4 of this Report, the hydrostatic hose test data was not available for review.

_,

.

.

Gas Suppression Systems

--

The inspector reviewed PDCR 7-79 and verified that the licensee installed an automatic halon suppression system to protect the cable room cable chase.

The inspector verified that the licensee installed a manually activated carbon dioxide system to protect the turbine generator bearings area, and the carbon dioxide suppression system in the protected cable tray room has been modified to provide automatic activation.

Control of Combustibles

--

The inspector verified the installation of oil retention curbs around the turbine lube oil storage tank, generator seal oil unit, and diesel generator day tanks.

8.

Unresolved Items Unresolved items are matters about which more information is required to ascertain whether they are acceptable items, items of noncompliance, or deviations.

Unresolved items disclosed during the inspection are discussed in paragraphs 3, 4, 5 and 6.

9.

Exit Meeting The inspector met with the licensee representatives denoted in Details (paragraph 1) at the site on February 4, 1982.

The inspector summarized the purpose and scope of the inspection and identified the inspection findings. The NRC Resident Inspector was present at the exit meeting of February 4, 1982.

!

-

_