IR 05000302/2013403

From kanterella
Jump to navigation Jump to search
NRC Security Inspection Report 05000302/2013-403
ML13189A088
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/08/2013
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To:
Linda K. Gruhler 404-997-4633
References
IR-13-403
Download: ML13189A088 (4)


Text

July 8, 2013

SUBJECT:

CRYSTAL RIVER NUCLEAR PLANT-NRC SECURITY INSPECTION REPORT 05000302/2013403

Dear Mr. Hobbs:

On June 20, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Crystal River Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results that were discussed on June 20, 2013, with Mr. B. Wunderly and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy Desai, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No. 50-302 License No. DPR-72

Enclosure:

Inspection Report 05000302/2013403 w/Attachment: Supplement Information (OUO)

cc: (See page 3) for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy Desai, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No. 50-302 License No. DPR-72

Enclosure:

Inspection Report 05000302/2013403 w/Attachment: Supplemental Information (OUO)

cc: (See page 3)

DISTRIBUTION:

RidsNrrPMCrystal River Resource C. Evans, RII, EICS L. Douglas, RII, EICS M. Layton, NSIR R. Albert, NSIR S. Coker, NSIR RIDSNRRDIRS OE Mail PUBLIC - (OUO Removed)

X PUBLICLY AVAILABLE (OUO Removed) NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML13189A088 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 HQ:NSIR/RSOB RII: DRP/PSB3 RII: DRS/PSB2

SIGNATURE RLP5 JCS3 FXS1 via e-mail DWR1 BBD

NAME R. Patterson J. Shehee F. Sullivan D. Rich B. Desai

DATE 6/ 27 /2013 7/ 8 /2013 7/ 3 /2013 7/ 2 /2103 7/ 8 /2013

E-MAIL COPY YES NO YES NO YES NO YES NO YES NO

G:\\DRSII\\PSBII\\REACTORS\\CRYSTAL RIVER\\Reports\\2013\\Crystal River NON-PUBLIC Insp Report 2013403 REV0.docx cc:

Mike Delowery

Decommissioning Planning Manager Crystal River Nuclear Plant (NA2C)

15760 West Power Line Street Crystal River, FL 34428-6708

Blair P. Wunderly Plant General Manager Crystal River Nuclear Plant 15760 West Power Line Street Crystal River, FL 34428-6708

Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B)

15760 West Power Line Street Crystal River, FL 34428-6708

Joseph W. Donahue Vice President, Nuclear Oversight Progress Energy (TPP-15)

100 E. Davie Street Raleigh, NC 27601

Edward T. O'Neil Nuclear Protective Services Duke Energy Corporation 526 South Church Street Charlotte, NC 28202