U. S. NUCLEAR REGULATORY COMMISSION
REGION I
.
OPERATOR LICENSING EXAMINATION REPORT ~
DOCKET No/ REPORT No:
50-289/90-14 (OL)
FACILITY LICENSE No:
DPR-50 LICENSEE:
GPU Nuclear Corporation FACILITY:
Three Mile Island Nuclear Station, Unit 1 EXAMINATION DATES:
July 18, 1990 CHIEF EXAMINER:
Barry S. Norris
SUBMITTED BY:
--
[d</[8
'Barrg S) Norris Dado Projtct Inspector, Shoreham Division of Reactor Projects
- 7d APPROVED BY:- M Peter W.
Eselgroth, Chief Date FWR Section
' Division of Reactor Safety.
SUMMARY:
A simulator examination was administered for initial licensing of a'
Senior Reactor Operator (SRO) Upgrade candidate, and a simulator examination was also administered to an SRO-who had failed an earlier requalification examination. Both individuals passed their respective examinations. The SRO-Upgrade candidate was issued a license, and the SRO is eligible for license renewal, per 10CFR55.57 (b) (2) (iv).
0$$k $yf}889 S
Mnh mess e we
~~
G
_1-y
..,, _ ~ ~ ~ _
..
.
L Examination-Recort 50-289/90-14(OL)
.,
DETAILS TYPE OF EXAMINATIONS:
Initial a".d Reqitalification
.
EXAMINATION RESULTS:
SROU Initial Pass / Fail Written N/A Simulator 1/0 Walk-Through N/A OVERALL 1/0 SRO NRC Facility Requalification Pass / Fail Pass / Fail
'
Written N/A N/A Simulator 1/0 1/0
- JPMs N/A N/A
'I OVERALL 1/0 1/0 THIEF EXAMINER AT SITE:
B.
S. Norris ATTACHMENT:
Simulation Facility Report o!'
n
{
,.g
-
....
ExamiDation ReDort 50-289/90-14(OL)
SJJiULATION FACILITY REPORT FACILITY LICENSEE:
GPU Nuclear Corporation Three Mile Island Nuclear Station-Unit 1 FACILITY DOCKET No:
50-289 OPERATIaiG TEST ADMINISTEREQL July 18, 1990 i
This form is used only to report observations.
These observations do not constitute audit or inspection findings and are not, without further J
verification and review, indicative of non-compliance with-l 10CFR55. 4 5 (b).
These observations do not affect NRC certification or l
approval of the simulation facility other than to provide information
which may be used in future evaluations.
No licensee action is required in response to these, observations.
l During the conduct of the simulator portion of the operating tests, the following items were observed (if no comments, so state):
1.
A booth has been built around the instructors console since the l
last examinations.
There are some minor problems associated with the. booth usage:
(1) the instructors are getting used to working i
in a booth as opposed to being on the floor with the operators, and l
l (2) there are no microphones on the simuvator floor and thus the
instructors cannot hear the operators if the booth doors are j
closed.
2.
The control room in the plant has undergone major modifications l-with respect to the computer consoles and the layout of the desks f
for the operators, supervisors and the STA, including raising of the floor in the desk area for better visibility.
The simulator
l has also-been modified to replicate the upgraded computer consoles
!
and the new desk layout, j
i 3.
New additions in the simulator and the control room with respect i
to the annunciators are a unique reset horn that is different from
!
the alarm horn, and a switch for global silence of the annunciators j
for two-minutes with the shift supervisor's permission.
i
!
L1 l
~!
i t
z