Exam Rept 50-289/90-14OL on 900718.Exam Results:Senior Reactor Operator (SRO) Upgrade Candidate Issued License & SRO Eligible for License Renewal
ML20058L239
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/25/1990
From: Eselgroth P, Norris B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20058L230 List:
References
50-289-90-14OL, NUDOCS 9008070087
Download: ML20058L239 (3)


Text

- - -. - -..............

.

..

,

.

.

,

U. S. NUCLEAR REGULATORY COMMISSION

REGION I

.

OPERATOR LICENSING EXAMINATION REPORT ~

DOCKET No/ REPORT No:

50-289/90-14 (OL)

FACILITY LICENSE No:

DPR-50 LICENSEE:

GPU Nuclear Corporation FACILITY:

Three Mile Island Nuclear Station, Unit 1 EXAMINATION DATES:

July 18, 1990 CHIEF EXAMINER:

Barry S. Norris

SUBMITTED BY:

--

[d</[8

'Barrg S) Norris Dado Projtct Inspector, Shoreham Division of Reactor Projects

  1. 7d APPROVED BY:- M Peter W.

Eselgroth, Chief Date FWR Section

' Division of Reactor Safety.

SUMMARY:

A simulator examination was administered for initial licensing of a'

Senior Reactor Operator (SRO) Upgrade candidate, and a simulator examination was also administered to an SRO-who had failed an earlier requalification examination. Both individuals passed their respective examinations. The SRO-Upgrade candidate was issued a license, and the SRO is eligible for license renewal, per 10CFR55.57 (b) (2) (iv).

0$$k $yf}889 S

Mnh mess e we

~~

G

_1-y

..,, _ ~ ~ ~ _

..

.

L Examination-Recort 50-289/90-14(OL)

.,

DETAILS TYPE OF EXAMINATIONS:

Initial a".d Reqitalification

.

EXAMINATION RESULTS:

SROU Initial Pass / Fail Written N/A Simulator 1/0 Walk-Through N/A OVERALL 1/0 SRO NRC Facility Requalification Pass / Fail Pass / Fail

'

Written N/A N/A Simulator 1/0 1/0

JPMs N/A N/A

'I OVERALL 1/0 1/0 THIEF EXAMINER AT SITE:

B.

S. Norris ATTACHMENT:

Simulation Facility Report o!'

n

{

,.g

-

....

ExamiDation ReDort 50-289/90-14(OL)

SJJiULATION FACILITY REPORT FACILITY LICENSEE:

GPU Nuclear Corporation Three Mile Island Nuclear Station-Unit 1 FACILITY DOCKET No:

50-289 OPERATIaiG TEST ADMINISTEREQL July 18, 1990 i

This form is used only to report observations.

These observations do not constitute audit or inspection findings and are not, without further J

verification and review, indicative of non-compliance with-l 10CFR55. 4 5 (b).

These observations do not affect NRC certification or l

approval of the simulation facility other than to provide information

which may be used in future evaluations.

No licensee action is required in response to these, observations.

l During the conduct of the simulator portion of the operating tests, the following items were observed (if no comments, so state):

1.

A booth has been built around the instructors console since the l

last examinations.

There are some minor problems associated with the. booth usage:

(1) the instructors are getting used to working i

in a booth as opposed to being on the floor with the operators, and l

l (2) there are no microphones on the simuvator floor and thus the

instructors cannot hear the operators if the booth doors are j

closed.

2.

The control room in the plant has undergone major modifications l-with respect to the computer consoles and the layout of the desks f

for the operators, supervisors and the STA, including raising of the floor in the desk area for better visibility.

The simulator

l has also-been modified to replicate the upgraded computer consoles

!

and the new desk layout, j

i 3.

New additions in the simulator and the control room with respect i

to the annunciators are a unique reset horn that is different from

!

the alarm horn, and a switch for global silence of the annunciators j

for two-minutes with the shift supervisor's permission.

i

!

L1 l

~!

i t

z