..... _
.
.
-
.
.
,
U. S. ATO>lIC ENERGY C0kt1ISSION
-
.
...
"
DIRECTORATE OF REGULATORY OPERATIONS
REGION I
.
.
) Inspection Report No:
50-289/75-03 Docket No:
50-289 icensce:
Metropolitan Edison Company License No: DPR-50
.
..
P.O. Box 542 Priority:
C Reading, Pennsylvania Category:
aca t' ion :
Middletown, Pennsylvania (Three Mile I.sland 1)'
,
'
,rp'e of Licensce:
- ...
-
,,.s of Inspection:
Management Meeting
-
,
.
atr
'f Inspection:
January 14, 1975
,
.
,
,
.
,
January 9, 1975
.
It ~ of Previous Insp. action:
.
2 porting Inspector
// u I r,;
_'Z., -
/['7/7f
.
Date i
R. L. Spessard, Reactor Inspector
- ccapanying Inspectors:
Date
.
Date Date
.
.
.._
_
Date
,
.
ther Accompanying Perscnnel:
Date
,
1451
.555
-
-
-
re.
! Ey:
Fe%2 3"
'
,
,
/
Date A. B., Davis, Senior Reactor Inspector Reactor Operations Branch
'7910190
$.
,
.
.
.
.
SUMMARY OF FINDINGS
.
..
Enforcemant Action
=
None Licensee Action on Previously Identified Enforcement Items Not Applicable
-
Design Changes
--
..
'
Not Applicable Unusual Occurrences
-
Not Applicable
.
Other Significant Findings
..,...
-
A.
Current
'
=.
A meeting was held with Metropolitan Edison Company management'
representatives regarding the Three Mile Island 1. facility, in i
order to familiarize the licensee with the Regulatory Organization, the Region I staff, the Regulatory Inspection Program, the l.
modifications to Enforcement Action and categories of Noncocpliance, l
and Regulatory policy regarding press releases; to review previous
Enforcement Actions and general conduct of plant operatio,ns; and to provide specific information regarding items of concern to the licensee.
Additionally, RO:I's concerns regarding the most recent inspection findings in the areas of plant design changes and audits were discussed (Refer to Report 50-289/75-01).
Persons Present Metropolitan Edison Company Mr. R. C. Arnold, Vice President Mr. R. M. Klingaman, Manager, Generation Engineering Mr. L. L. Lawyer, Manager, Operational Quality Assurance Mr. J. G, Herbein, Station Superintendent Mr. J. J. Co11tz, Unit i Superintendent Mr. G. P. Miller, Unit 2 Superintendent 1451 356
-
e
.
.
.
-2-
-
,
.
' '
Directorate of Regulatory Operations, RO:I
-
Mr. J. P. O'Reilly, Director Mr. E. J. Brunner, Chief, Reactor Operations Branch Mr. R. T. Carlson, Chief, Facility Construction and Engineering S.upport Branch (part time)
Mr. P. R. Nelson, Chief, Radiological and Environmental Protection Branch (part time)
Mr. W. G. Martin, Chief, Materials and Plant Protection Branch (part time)
Mr. A. B. -Davis, Chief, PWR Projects Section Mr. E. C. McCabe, Chief, Nuclear Support Section
--
- '
Mr. P. S. Knapp, Chief, Facilities Radiation Protection Section
-
Dr. C. O. Gallina, Radiation Specialist, Environmental Protection and Special Programs Section Mr. E. W. Jones,- Security Inspector, Security and Investigation Section Mr. M. J. King, Security Inspector, Security and Investigation Section Mr. K. Abraham, Public Information Officer Mr. R. L. Spessard, Principal Inspector, PWR Projects Section
,
-
-
8.
-
.
'
1451 357
.
p..
.
/
..
r-
!
1 e
s'
..
.
DETAILS
.
W 1.
The Director introduced his principal staff, explained the purpose and objectives of the meeting, and reviewed the scheduled agenda.
2.- A presentation was made by the appropriate RO:I stnff members con-cerning the following items:
a.
Modifications to Enforcement Actions and Categories of Noncompliance (Letter from D. F. Knuth, Director of Regulatory Operations to
-
all AEC Licensees, dated December 31, 1974).
..
..
b.
Functional Description of the Regulatory Operations Organization.
c.
Functional Description of the RO:I Organization.
d.
Description of the Regulatory Inspection Program which included the following:
.
(1) Uniformity (2) Role of Prine: pal Inspector, including use of Construction and Engineering Support Branch Specialist (3) Operating Reactors Inspection Program
'
-
(4) Description of Nuclear Support Section, current and pro-y..
_. -
jected inspections including QA inspection (5) Description of current and projected inspection program in the areas of environmental program, emergency plans, state relations, independent measurements, radiation protection, vaste management, materials and plant protection programs.
e.
Enforcement actions and general conduct of plant operations fc.
. the period of April 19,1974 (Operating License issuance date)
through December 31, 1974 including unplanned releases of radio-active material reported by the licensee.
f.
General review of RO:I's concerns regarding the most recent inspection findings in the areas of plant design changes and audits (Refer to Report 50-289/75-01).
g.
Regulatory policy with respect to press releases.
Licensee quescions which arose during the above presentations were responded to by RO:I staff members in attendance.
.
.
1451 358 s
-
.
.
.
-4-
.
I v
3.
Specific concerns of the licensee were discussed.
The Regulatory
,
position with regard to these concerns was clarified.
4.
Subsequent to the working meeting with RO:I staff members, the Metropolitan Edison Company Vice President met with the Reactor Operations Branch Chief and the PWR Section Chief to furthe' discuss
,
RO:I's concerns regarding the most recent inspection findings in the aruso of plant design changes and audits (Refer to Report 50-289/75-01).
-
5.
Subsequent to the above meetings, the licensee representatives
,,
met with the Director and Reactor Operations 3 ranch me=bers.
The following items were included in the subjects discussed:
a.
RO:I inspection criteria relative to Regulatory Guides, Industry Standards, and Codes not adopted by or formally imposed on the Metropolitan Edison Company.
b.
Method of industry review and comment on Regulatory Guides prior to their issuance.
c.
Enforcement criteria relative to issuance of civil penalties ~,
and conduct of management meetings following RO:I inspections
'
which identified significane Items of Noncompliance.
)
,
d.
The number of RO inspectors on site during inspections.
e.
Status of the FSAR following issuance of an operating license, and changes to the FSAR.
.
f.
Industrial security requirements, and the adverse impact that the proposed regulations (10 CFR 73.55) may have on the quality of plant operations.
1451 359 s
.