IR 05000269/2017005

From kanterella
(Redirected from IR 05000287/2017005)
Jump to navigation Jump to search
Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 - Inspection Reports 05000269/2017005, 05000270/2017005 and 05000287/2017005
ML17230A223
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/16/2017
From: Frank Ehrhardt
Division Reactor Projects II
To: Teresa Ray
Duke Energy Corp
References
IR 2017005
Download: ML17230A223 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ust 16, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 (NRC INSPECTION REPORT 05000269/2017005, 05000270/2017005, AND 05000287/2017005)

Dear Mr. Ray:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Oconee Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC will conduct Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, in the near future.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Project Branch 1 Division of Reactor Projects Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55 Enclosure:

Oconee Inspection/Activity Plan (09/01/2017 - 06/30/2019)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 (NRC INSPECTION REPORT 05000269/2017005, 05000270/2017005, AND 05000287/2017005) August 16, 2017 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML17230A223 OFFICE RII:DRP RII:DRP RII: DRP NAME JWorosilo MToth FEhrhardt DATE 8/15/2017 8/14/2017 8/15/2017 OFFICIAL AGENCY RECORD

Page 1 of 2 Oconee 08/14/2017 09:04:59 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 3 1, 2, 3 09/25/2017 09/29/2017 IP 7111402 Alert and Notification System Testing 1, 2, 3 09/25/2017 09/29/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2, 3 09/25/2017 09/29/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 09/25/2017 09/29/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2, 3 09/25/2017 09/29/2017 IP 71151 Performance Indicator Verification RP - RP OCCUPATIONAL INSPECTION WEEK 1 2 1, 2, 3 10/30/2017 11/03/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 10/30/2017 11/03/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 10/30/2017 11/03/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 10/30/2017 11/03/2017 IP 71124.04 Occupational Dose Assessment 1, 2, 3 10/30/2017 11/03/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 10/30/2017 11/03/2017 IP 71151 Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 11/06/2017 11/10/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2 3 1, 2, 3 11/13/2017 11/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 11/13/2017 11/17/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 11/13/2017 11/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 11/13/2017 11/17/2017 IP 71124.04 Occupational Dose Assessment 1, 2, 3 11/13/2017 11/17/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 11/13/2017 11/17/2017 IP 71151 Performance Indicator Verification SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 11/13/2017 11/17/2017 IP 7111108P Inservice Inspection Activities - PWR ISI - UNIT 3 IN-SERVICE INSPECTION 1 3 04/30/2018 05/04/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS AND TRANSPORTATION 2 1, 2, 3 04/30/2018 05/04/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 04/30/2018 05/04/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation SGISI - UNIT 3 SG IN-SERVICE INSPECTION 1 3 04/30/2018 05/04/2018 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL LICENSE EXAM PREP 6 1 05/07/2018 05/11/2018 V23512 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Oconee 08/14/2017 09:04:59 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL LICENSE EXAM 4 1 06/04/2018 06/15/2018 V23512 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIES HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2, 3 06/18/2018 06/22/2018 IP 7111107T Heat Sink Performance RP - RP PUBLIC INSPECTION 2 1, 2, 3 06/18/2018 06/22/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2, 3 06/18/2018 06/22/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2, 3 06/18/2018 06/22/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2, 3 06/18/2018 06/22/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences EP - EP EXERCISE 9 1, 2, 3 08/13/2018 08/17/2018 IP 7111401 Exercise Evaluation 1, 2, 3 08/13/2018 08/17/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 08/13/2018 08/17/2018 IP 71151-EP01 Drill/Exercise Performance 1, 2, 3 08/13/2018 08/17/2018 IP 71151-EP02 ERO Readiness 1, 2, 3 08/13/2018 08/17/2018 IP 71151-EP03 Alert & Notification System Reliability 1, 2, 3 08/13/2018 08/17/2018 IP 71151-EP03 Alert & Notification System Reliability EQI - DESIGN BASES ASSURANCE INSPECTION (PROGR 3 1, 2, 3 08/27/2018 08/31/2018 IP 7111121N Design Bases Assurance Inspection (Programs)

1, 2, 3 09/17/2018 09/21/2018 IP 7111121N Design Bases Assurance Inspection (Programs)

3 10/01/2018 10/05/2018 IP 7111121N Design Bases Assurance Inspection (Programs)

ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 11/05/2018 11/09/2018 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 11/05/2018 11/09/2018 IP 7111108P Inservice Inspection Activities - PWR TFPI - OCONEE NFPA 805 TFPI 3 1, 2, 3 05/20/2019 05/24/2019 IP 7111105X-Fire Fire protection inspection activities 1, 2, 3 06/03/2019 06/07/2019 IP 7111105X-Fire Fire protection inspection activities PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2, 3 04/15/2019 04/19/2019 IP 71152B Problem Identification and Resolution 1, 2, 3 04/29/2019 05/03/2019 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.