Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 - Inspection Reports 05000269/2017005, 05000270/2017005 and 05000287/2017005
ML17230A223
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/16/2017
From: Frank Ehrhardt
Division Reactor Projects II
To: Teresa Ray
Duke Energy Corp
References
IR 2017005
Download: ML17230A223 (5)


Text

August 16, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 (NRC INSPECTION REPORT 05000269/2017005, 05000270/2017005, AND 05000287/2017005)

Dear Mr. Ray:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Oconee Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC will conduct Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, in the near future.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief

Reactor Project Branch 1

Division of Reactor Projects

Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55

Enclosure:

Oconee Inspection/Activity Plan (09/01/2017 - 06/30/2019)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 (NRC INSPECTION REPORT 05000269/2017005, 05000270/2017005, AND 05000287/2017005) August 16, 2017

DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP RII: DRP

NAME JWorosilo MToth FEhrhardt

DATE 8/15/2017 8/14/2017 8/15/2017

OFFICIAL AGENCY RECORD

17230A223

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 1 of 2 08/14/2017 09:04:59 EP

- EP PROGRAM INSPECTION

1, 2, 3 IP Alert and Notification System Testing 7111402 09/25/2017 09/29/2017 1, 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/25/2017 09/29/2017 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 09/25/2017 09/29/2017 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/25/2017 09/29/2017 1, 2, 3 IP Performance Indicator Verification 71151 09/25/2017 09/29/2017 RP

- RP OCCUPATIONAL INSPECTION WEEK 1

1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/30/2017 11/03/2017 1, 2, 3 IP Occupational ALARA Planning and Controls 71124.02 10/30/2017 11/03/2017 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/30/2017 11/03/2017 1, 2, 3 IP Occupational Dose Assessment 71124.04 10/30/2017 11/03/2017 1, 2, 3 IP Radiation Monitoring Instrumentation 71124.05 10/30/2017 11/03/2017 1, 2, 3 IP Performance Indicator Verification 71151 10/30/2017 11/03/2017 ISI

- UNIT 2 IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 11/06/2017 11/10/2017 RP

- RP OCCUPATIONAL INSPECTION WEEK 2

1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/13/2017 11/17/2017 1, 2, 3 IP Occupational ALARA Planning and Controls 71124.02 11/13/2017 11/17/2017 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/13/2017 11/17/2017 1, 2, 3 IP Occupational Dose Assessment 71124.04 11/13/2017 11/17/2017 1, 2, 3 IP Radiation Monitoring Instrumentation 71124.05 11/13/2017 11/17/2017 1, 2, 3 IP Performance Indicator Verification 71151 11/13/2017 11/17/2017 SGISI

- UNIT 2 SG IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 11/13/2017 11/17/2017 ISI

- UNIT 3 IN-SERVICE INSPECTION

3 IP Inservice Inspection Activities - PWR 7111108P 04/30/2018 05/04/2018 RP

- RAD HAZARDS AND TRANSPORTATION

1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/30/2018 05/04/2018 1, 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/30/2018 05/04/2018 SGISI

- UNIT 3 SG IN-SERVICE INSPECTION

3 IP Inservice Inspection Activities - PWR 7111108P 04/30/2018 05/04/2018 OL EXAM

- INITIAL LICENSE EXAM PREP

1 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIES V23512 05/07/2018 05/11/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 2 of 2 08/14/2017 09:04:59 OL EXAM

- INITIAL LICENSE EXAM

1 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIES V23512 06/04/2018 06/15/2018 HS

- TRIENNIAL HEAT SINK PERFORMANCE

1, 2, 3 IP Heat Sink Performance 7111107T 06/18/2018 06/22/2018 RP

- RP PUBLIC INSPECTION

1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/18/2018 06/22/2018 1, 2, 3 IP Radiological Environmental Monitoring Program 71124.07 06/18/2018 06/22/2018 1, 2, 3 IP Occupational Exposure Control Effectiveness 71151-OR01 06/18/2018 06/22/2018 1, 2, 3 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 06/18/2018 06/22/2018 EP

- EP EXERCISE

1, 2, 3 IP Exercise Evaluation 7111401 08/13/2018 08/17/2018 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/13/2018 08/17/2018 1, 2, 3 IP Drill/Exercise Performance 71151-EP01 08/13/2018 08/17/2018 1, 2, 3 IP ERO Readiness 71151-EP02 08/13/2018 08/17/2018 1, 2, 3 IP Alert & Notification System Reliability 71151-EP03 08/13/2018 08/17/2018 1, 2, 3 IP Alert & Notification System Reliability 71151-EP03 08/13/2018 08/17/2018 EQI

- DESIGN BASES ASSURANCE INSPECTION (PROGR

1, 2, 3 IP Design Bases Assurance Inspection (Programs)

7111121N 08/27/2018 08/31/2018 1, 2, 3 IP Design Bases Assurance Inspection (Programs)

7111121N 09/17/2018 09/21/2018

IP Design Bases Assurance Inspection (Programs)

7111121N 10/01/2018 10/05/2018 ISI

- UNIT 1 IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 11/05/2018 11/09/2018 SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 11/05/2018 11/09/2018 TFPI

- OCONEE NFPA 805 TFPI

1, 2, 3 IP Fire protection inspection activities 7111105X-Fire 05/20/2019 05/24/2019 1, 2, 3 IP Fire protection inspection activities 7111105X-Fire 06/03/2019 06/07/2019 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1, 2, 3 IP Problem Identification and Resolution 71152B 04/15/2019 04/19/2019 1, 2, 3 IP Problem Identification and Resolution 71152B 04/29/2019 05/03/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.