IR 05000269/2017404

From kanterella
Jump to navigation Jump to search
Cyber Security Follow-Up Inspection Report 05000269/2017404, 05000270/2017404, and 05000287/2017404 - OUO Removed
ML17165A143
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/12/2017
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Rasmey Robinson
Duke Energy Corp
References
IR 2017404
Download: ML17165A143 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 12, 2017 Mr. Rodney Security Manager Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672 SUBJECT: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000269/2017404, 05000270/2017404, AND 05000287/2017404

Dear Mr. Robinson:

On May 4, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Oconee Nuclear Power Plant, Units 1, 2, and 3 and discussed the results of this inspection with Mr. Chris Nolan and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390. In accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-269, 50-270, and 50-287 License Nos.: DPR-38, DPR-47, and DPR-55 Enclosure:

Inspection Report 05000269/2017404, 05000270/2017404 And 05000287/2017404 w/Attachment: Supplemental Information (OUO)

cc: (See page 3) cc:

Mark McNeely Duke Energy Corporation 526 S. Church Street Charlotte, NC 28202-1802 ___ ____ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE PJB4 JJP3 FJE SMS NAME P. Braaten J. Patel F. Ehrhardt S. Shaeffer DATE 6/ 8 /2017 6/ 8 /2017 6/ 9 /2017 6/8&12/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO