IE Insp Rept 50-285/83-13 on 830501-31.No Noncompliance Noted.Major Areas Inspected:Operational Safety Verification, Startup Testing,Surveillance Testing,Maint Activities & Followup on Violations & NUREG-0737 Items
ML20024C329
Person / Time
Site: Fort Calhoun 
Issue date: 06/14/1983
From: Johnson W, Yandell L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20024C319 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.4.1, TASK-2.F.1, TASK-TM 50-285-83-13, NUDOCS 8307120523
Download: ML20024C329 (12)


Text

r

.

.

,

,,

-

' APPENDIX U. S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report:

50-285/83-13 License:

DPR-40 Docket:

50-285 Licensee: Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102 Facility Name: Fort Calhoun Station l

Inspection At:

Fort Calhoun Station, Blair, Nebraska Inspection Conducted: May 1-31, 1983 AhN)

bAO/83 Inspector:

L. A. Yandell, Senior Resident Reactor Inspector Ddte

'

Approved:

/,[//)

6//#/fR W.' D. Topton, Chief, Reactor Project Section C Da'te

'

Inspection Summary Inspection Conducted May 1-31, 1983 (50-285/83-13)

Areas Inspected: Routine, announced inspection of operational safety verifica-tion, startup testing, surveillance testing, maintenance activities, followup of written reports of nonroutine events, followup of violations, and followup of NUREG 0737 (TMI) items. The inspection involved 92 inspector-hours onsite by one NRC inspector.

Results: Within the seven areas inspected, no violations or deviations were identified.

,

8307120523 830614

i DR ADDCK 05000

.

r

)

..

.

,

-2-

'

l DETAILS 1.

Persons Contacted

  • K. J. Morris, Manager, Administrative Services
  • P. M. Surber, Section Manager, Generating Station Engineering
  • R. L. Jaworski, Section Manager, Technical Services
  • M. C. Winter, Manager, Quality Assurance
  • W. G. Gates, Manager, Fort Calhoun Station
  • J. K. Gasper, Manager, Reactor & Computer Technical Services J. J. Fluehr, Reactor Engineer M. R. Core, Supervisor, I&C and Electrical Field Maintenance G. R. Peterson, Supervisor, Maintenance A. W. Richard, Supervisor, Technical L. T. Kusek, Supervisor, Operations D. W. Dale, Senior QC Inspector
  • Denotes attendance at the exit interview.

The NRC inspector also talked with, and interviewed, other licensee employees during the inspection. These employees included licensed and unlicensed operators, craftsmen, engineers, and office personnel.

2.

Operational Safety Verification The NRC inspector performed activities as described below to ascertain that the facility is being maintained in conformance with regulatory re-quirements and that the licensee's management control system is effec-tively discharging its responsibilities for continued safe operation.

a.

The NRC inspector made several control room observations to verify proper shift manning, operator adherence to approved procedures, ad-herence to selected Technical Specifications, and operability of the reactor protective system. Selected logs, records, recorder traces, annunciators, panel indications, and switch positions were reviewed to verify compliance with regulatory requirements. The licensee's equipment control was reviewed for proper implementation by reviewing the maintenance order and tag-out logs, and by verifying selected safety-related tag-outs. Several shift turnovers were observed and shif t turnover sheets were reviewed during this inspection period.

b.

The NRC inspector toured the plant at various times to assess plant-and equipment conditions. The following items were observed during these tours:

general plant conditions

.

vital area. barriers not degraded or appropriately manned by

.

security personnel t

'

}

..

_

,

.

,

..

,

-3-adherence to requirements of radiation work permits (RWPs)

.

proper use of protective clothing and respirators

.

plant housekeeping and cleanliness practices including fire

.

hazards and the control of combustible material work activities being perfomed in accordance with approved

.

activities physical security

.

HP instrumentation is operable and calibrated

.

c.

The NRC inspector verified operability of the following safety-related systems by performing a walkdown or switch verification of the acces-sible portions of the system:

125 Volt DC System per Checklist EE-3-CL-A

.

120 Volt AC System per Checklist EE-4-CL-A

.

High Pressure Safety Injection System per Checklist SI-1-CL-A

.

It was noted that Checklists EE-3-CL-A and EE-4-CL-A had been revised during the 1983 outage to incorporate recent changes, correct previous typo / administrative errors, and utilize a revised format that makes the checklists easier to perform.

The NRC inspector performed an indepth review of the High Pressure Safety Injection System (HPSI) to confirm that the system lineup pro-cedures agree with the plant drawings (E-23866-210-130, Sheet 1 of 2, Rev. 21 and E-23866-210-130, Sheet 2 or 2, Rev. 19) and the as-built configuration. The Jumper Log and Annunciator Status Log were reviewed to ensure they reflected current conditions.

Equipment and piping was inspected to verify hanger and support operability and to assess house-keeping practices in these areas.

Checklist SI-1-CL-A was compared with Checklists RC-28-CL-D, " Reactor Startup Locked Valves," and ES-1-CL-A, " Engineered Safeguards Controls," for consistency and the appropriate locked valves were verified in the proper position. Minor typographical errors were identified and discussed with the licensee.

d.

The NRC inspector reviewed Pemit 83009 for a containment purge and verified that Technical Specification limits were being met.

It was noted that the licensee was taking the appropriate samples and record-ing the required meteorological data, and that the automatic trip functions were tested prior to initiating the purge.

i

.,_

..

.

.

..

,

-4-e.

The plant coninenced a power reduction on April 29, 1983, to replace a failed RTD for Instrument Channel A/TI-122H. Other items of mainte-nance were planned and the plant anticipated being back online by Tuesday, May 3.

While at hot standby, it was determined that the Pressurizer Mini-Spray Valve RC-133 had a broken packing follower stud.

To correct this problem, the plant was shutdown and cooled down to 508 F and depressurized to 1200 psi to allow repairs.

Fo110 wing re-pairs, the plant was started up and placed back online at about 9 a.m.,

on May 5, 1983.

No violations or deviations were identified.

3.

Startup Testing The licensee completed startup physics testing for the Cycle 8 core in accordance with Special Procedure SP-PRCPT-1, " Post Refueling Core Physics Testing and Power Ascension." The NRC inspector reviewed the completed procedure, Sections F.1 through F.13, and verified that results were within the limits established in Appendix D to SP-PRCPT-1 and Amendment No. 70 to the facility operating license that was issued on March 15, 1983, by the NRC. As part of this evaluation, the NRC inspector reviewed the following supplementary information to address specific core parameters:

a.

Core Power Distribution Limits. The NRC inspector had the opportunity to review three incore flux maps taken at various times during power Fpnge testing to verify that core power distribytion limits (specifically r

R-total integrated radial peaking factor, Fxy total planar radial peaking factor, YI-axial shape index,and linear heat rate) were within specifications. The NRC inspector reviewed Control Room Log FC-71 to verify that YI was within the acceptable limits of Technical Specifi-cation Figure 2-7, and that the Azimuthal Power Tilt did not exceed 0.03 above 70% rated power. OPPD utilizes an incore data analysis code that is qualified and maintained by the NSSS vendor. The NRC inspector discussed the licensee's procedures for using this code with the Mana-ger, Reactor and Computer Technical Services and verified that proper controls are in effect.

b.

Incore/Excore Calibration. This calibration is accomplished by Sur-veillance Test ST-RPS-13, "Incore/Excore Calibration," which was performed at various power levels during power escalation. The NRC inspector reviewed three completed tests (two of which required re-calibration) and verified that the tests were performed in accordance with the procedure, that data was recorded and processed properly, and that Technical Specification limits were met.

c.

Core Thermal Power Evaluation. Special Procedure SP-CTPC-1, " Core Thennal Power Calculation," is utilized to determine core thermal power.

The NRC inspector reviewed two separate calculations performed, includ--

ing the data sheets and the calculational wor,

__ _

_____ __________

.

..

l e

..

,

-5-d.

Determination of Reactor Shutdown Margin. This determination is made using Surveillance Test ST-SDM-1, " Shutdown Margin Verification,"

which is performed on a daily basis. ST-SDM-1 refers to Technical Data Book,Section V.9 for the specific work sheets to be used. The NRC inspector reviewed several of these determinations and ensured that current Cycle 8 data as approved in Amendment No. 70 to the facility operating license was being used.

e.

Isothermal Temperature Coefficient. Section F.5 of SP-PRCPT-1 describes the procedure and data to be taken to determine isothermal temperature coefficient. The NRC inspector reviewed this procedure section and the calculation performed by Technical Services at Jones Street Sta-tion to verify the site results, f.

Control Rod Worth Measurement. Sections F.6 through F.8 of SP-PRCPT-1 were performed to determine regulating CEA group worths and sequential group worths to confirm the predicted results from the Cycle 8 cal-culation. The NRC inspector reviewed these results and verified that they were w1 thin the acceptable limits established in Appendix D of SP-PRCPT-1.

No violations or deviations were identified.

4.

Surveillance Testing The NRC inspector witnessed portions of the following surveillance test activities:

a.

Diesel Start and Diesel Fuel Oil Transfer Pump (Prior to Startup)

ST-ESF-6, F.1 for DG-1 and DG-2 b.

Auxiliary Feedwater (Monthly) ST-FW-1, F.3.

The NRC inspector also reviewed ST-FW-1, F.1 which is a monthly, redundant valve lineup of the auxiliary feedwater system c.

High Containment Pressure Channels (Monthly) ST-RPS-8, F.1 and ST-ESF-3, F.1 In the above surveillance tests the NRC inspector verified, where appli-cable, that:

testing was scheduled in accordance with Technical Specification

.

requirements procedures were being followed

.

calibrated test equipment was being used

.

qualified personnel were performing the tests

.

!

.__ _ _ ___ _ _ _ _ _ -__ _ __

A

y

.,

.

.

,

..

,

-6-limiting conditions for operation were being met

.

test data were being accurately recorded

.

No violations or deviations were identified.

5.

Maintenance Activities The NRC inspector witnessed portions of the work performed on the following maintenance items:

a.

Maintenance Order (MO) 20220, "Feedwater Flow Control Valve." Feedwater Regulating Valve FCV-1101 had exhibited erratic behavior and excessive vibration at various times during startup testing. During a plant temperature change, as part of the Moderator Temperature Coefficient Test, valve operation became very erratic and the bypass valve had to be used to reestablish steady conditions. Both Feedwater Regulating Valves were newly installed during the 1983 outage and the valve manufacturer had been contacted *o evaluate the problem. The licensee took advantage of the shutdown at the beginning of the month to make modifications to the valve. The NRC inspector verified that the M0 was properly signed off, and that QC signoffs had been established.

Detailed work instructions which contained the valve manufacturer's recommendations for remachining the valve plug, were attached to the M0 and properly approved by the Plant Review Committee (PRC). The NRC inspector observed part of the machining on the valve plug and verified that Tag-Out 83-959 had been properly administered. Following plant startup, the valve was tested satisfactorily and has not experienced any vibration or erratic behavior since that time.

b.

M0 20306, " Pressurizer Mini-Spray Valve RC-133." During the same plant shutdown, it was discovered that Valve RC-133 had a broken packing follower stud. The NRC inspector reviewed the M0 and noted that a PRC approved procedure had been developed and attached for performing the work. Appropriate QC hold points were established and the work was performed by a qualified craftsman. The NRC inspector verified that the work was tested satisfactorily prior to power operations.

c.

FC-79-1908/SRDC0 82-54, " Installation of Wide Range Noble Gas Monitor."

This installation had been declared operational by the licensee during the 1983 outage and the NRC inspector wished to followup this TMI commitment (Item II.F.1.1) by reviewing the completed design package.

At the time of this review, the package was still waiting to be sub-mitted to the System Acceptance Coninittee (SAC) for the second time for final signoff. The following items were reviewed:

Form E, " Modification Completion Report," signed off February 1,

.

1983, by the plant manager.

e,

-

.

,

..

-7-Form F, " Safety Related Design Change Order," dated November 4,

.

1982, identified the work to be done and contains signoffs by Quality Control, Operations Quality Assurance, and the plant manager. The approved signed off work procedure was attached.

Procedure Changes 9357,, 9378, 9410, 9415, 9422,10101, and 10104, were attached and the NRC inspector verified that they were pro-perly signed off and entered. One procedure change called for a temporary jumper to be installed and for an entry to be made in the Jumper Log. The NRC inspector verified that the entry was made and closed out according to procedure requirements.

Form H, " Pre-Installation Modification Control."

.

Form I, " Post-Installation Modification Control."

.

Form J, " Station System Acceptance," dated February 1,1983. The

.

system was not accepted with discrepancies and/or deficiencies noted on the form. Procedure Changes 9023, 9601, 9602, 9608, 9609, and 10196, were identified as required to be incorporated into the operating instructions. A list of eight other problems associated with the modification was attached to the form for consideration and resolution. The system was signed off by the PRC and declared operable by the licensee. The NRC inspector will followup the SAC meeting to verify that the items identified on this form have been resolved.

" Test Procedure for Wide Range Radiation Monitors RM 063 L, M,

.

and H."

This procedure was PRC approved and signed off as com-pleted, with appropriate procedure changes attached.

Welding and Test Control Record for MO 10104.

.

Completed Tag-0ut Sheets82-876 and 82-930.

.

Copy of requisition from general stores for CQE material (cables)

.

under Work Order No. 1906.

Installation drawings.

.

d.

M0 20478, " Steam Generator Blowdown Tank." A leak was identified on the pipe between HCV-1390 and the tank. The NRC inspector reviewed the M0 to ensure that it was properly filled out and approved, and he verified that a welding / grinding permit had been obtained, that a separate RWP had been issued for this job, and that the work was per-formed by qualified personnel.. Tag-Out 83-1010 was issued for this M0 and verified by the NRC inspector.

.

No violations or deviations were identifie r

-

.

,

..

-8-6.

Followup of Written Reports of Nonroutine Events a.

LER 82-16, " Axial Shape Index Negative Setpoint on RPS Channel B Drifted Out-of-Tolerance." Working under MO 15522, the licensee determined that a dirty contact on the " Flow Dependent Setpoint Selector Switch" had caused the negative setpoint to drift. The switch contact was cleaned and the setpoint was returned to allow-able readings as verified by Surveillance Test ST-RPS-12, F.2,

" Axial Power Distribution Channels Test." The NRC inspector reviewed this test and the subsequent test performed at the end of the outage to verify acceptable results. This item is closed, b.

LER 82-17, " Failed Solenoids on Hydrogen Monitor VA-81A Containment Isolation Valves." This failure occurred as the system was going through final testing. The initial cause was ghought to be failed solenoids that were designed for 125 Volts DC - 10%, but had expe-rienced as much as 140 Volts DC during station battery equalizing changes.

Investigation during the 1983 outage revealed that instead the Conax environmental seals had failed. The licensee has postulated that the elevated DC voltage caused the solenoids to heat up and fail the Conax seal. During the outage the Conax seals for the two valves were replaced and the solenoid valve circuitry modified to operate at a lower voltage to avoid the high temperature problems. The NRC inspector ver_ified that the modifications had been installed and ob-served portions of the operability test on the valves. This item is closed.

c.

LER 82-18, "E/P Positioners on SI Valves Found to be Not Environ-mentally Qualified." During a design review the licensee had deter-mined that the E/P positioners.on SI Leakage Cooler Control Valves PCV-2909, 2929, 2949, and 2969, were not environmentally qualified and were subject to failure. This would have resulted in the valves going open due to instrument air leakage and providing a path for diverting part of the safety injection flow from the reactor during an accident. This was corrected during the recent outage under FC-82-140 by relocating the air supply on the E/P operator to ensure that the valve goes to the required accident position regardless of the E/P operator. The NRC inspector reviewed the design change pack-age and observed the modification test procedure. This item is closed.

d.

LER 82-19, " Main Steam Isolation Valves." Main Steam Isolation Valves HCV-1041A and 1042A were called upon to shut but stopped three-to-four degrees off their seats. The problem appeared to be binding between-the valve packing and shaft. The valve packings were sprayed with a penetrant oil and cycled satisfactorily. Operability was verified using Surveillance Test ST-ISI-MS-1, F.2, " Main Steam Valve Inservice Tes ti ng." This test was repeated at the end of the recent outage, and the NRC inspector verified that the test was properly conducted, the

f

.

.

,

..

-9-results were satisfactory, and that proper QC review was performed.

This item is closed, e.

LER 82-20, " Main Steam Safeties With Lift Setpoints Out-0f-Tolerance."

During outage testing, four-out-of-ten main steam safety valves had lift setpoints that were out-of-tolerance. The licensee committed to having one of the valves (MS 282) completely overhauled and the other three adjusted. The NRC inspector reviewed the completed Test Procedure ST-MSSV-1, F.1, " Main Steam Safety Valve Test," to verify that the three other valves had been adjusted and tested pro-perly. The certified test report for MS 282 was reviewed and the certification on the OPPD test equipment (1566 Hydroset, Serial No. Y-645-2) was verified to be current. This item is closed.

7.

Followup of Violations Violation 8301-01. The licensee had failed to enter temporary jumpers into the jumper log as required by Surveillance Procedure ST-CONT-7,

" Type A Test (Containment)." Standing Order 0-25, " Electrical Jumpers Control," has been extensively revised to handle temporary jumpers and blocks. A separate, auditable sheet is used for each entry, with appro-priate signatures required for better management cor, trol. The NRC inspec-tor has reviewed the new log and verified that all required entries were transferred over from the old system.

In addition, the NRC inspector has reviewed the entries and verified that the log is being used properly.

This item is closed.

8.

Followup on NUREG 0737 (TMI) Items Item II.E.4.1, " Dedicated Hydrogen Penetrations." The licensee has pro-vided the Dedicated Hydrogen Penetrations M30 and M69 in Room 59 in accord-ance with the requirements of NUREG 0737. This item was discussed and considered complete by R. A. Clark memo of August 14, 1981. OPPD Memo LIC-82-352 dated October 27, 1982, to the NRC identified how surveillance testing was to be performed on these penetrations. The NRC inspector has observed the hydrogen penetration installation and verified that Surveil-lance Test ST-CONT-3, " Containment Isolation Valves Leakage Rate Test-Type C," contains the procedure for testing these penetration isolation valves in accordance with Technical Specification requirements. This item is closed.

'

. Item II.F.1.6, " Containment Hydrogen Monitor System." The Containment Hydrogen Monitor System was declared operational by the licensee on September 30, 1982. Just prior to the outage, two containment isolation valves became inoperable and the lines were capped to maintain contain-ment integrity as discussed in NRC Inspection Report 82-32. The isolation valves were repaired during the recent outage and the NRC inspector ob-served portions of the final valve checkout. This item is close,

-

-

.

.

,

..

-10-9.

Exit Interview The NRC inspector met with licensee representatives on June 3,1983, to summarize the scope and findings of the inspection.

-

_ __

.

,

-

.

Nnc FORM 70s U.S. NUCLEAR REGULATORY COMMISSION PRmCiPAL msPECTOR(Name est. Arst, ana medais este9 INSPECTOR'S REPORT

N

,

,

Office of Inspection and Enforcement yg g Qgg Q, INSPECTORS RENRT NEXY mSPECDATE

  • [O" DOCnET NO is atts# OR LICENSE I"#

LICENSEE / VENDOR

,

l NO ity PRODUCTht3a.gets:

NO.

SEQ.

MO VR nag bat u-Poui o X

n So o a 2 8 6 B 3 i 1

' - * * ' " '

^

M - M00tFY

-

gg 0 - CELETE C

R - REPLACE O

_

__________-

PE/4CO OF iNVESTIGAf tONaNSPECTION INSPECTION PERFORMED ev ORGANIZATON COO REGON/HQ CONDUCT-ING ACTtylTY (See sfMC OSA ' aruxneerReport-g % y,,,,,,,,,g,,,,,,,,g.M. w g j l - REGCNAL OFFICE ST AFF OTHER FROM To g ] 2 - RFSIDENT INSPECTOR REGON 04viscN BRANCM MO DAY VR MO.

DAY VR o 6 ol/ Als df 31/ a 3 l i - "aFoaMA~ci APPa A*A' TiAM C.

REGONAL ACTCN l

TvPE OF Activity CONOUCTED ictwcs one eos onwvi

""

l 02 - SAFETv

_

08 - MGMT. Visif

_

10 - PLANT SEC.

_

14 - INQUIRV 1 - NRC FORM 591 03 - mCIDENT 07 - SPECiAL 11 - INVENT.VER 16 - INVESTIGATION g

2 - REGIONALOFFICE LETTER 04 - ENFORCEMENT 08 - VENDOR 12 - SHIPMENT / EXPORT 06 - MGMT. AUDIT 09 - M AT ACCT.

_

13. iMPOR T l

i.# % +g.

ll 70TAL NUMBE R ENFORCEMENT CCNFERENCE REPORT CONTAIN 2130 ll LETTER OR REPORT TR ANSMiTTAL DATE i

  • w s.* *

OF VCLATIONS AND MELD hFORMATION A

B C

DEylATONS RC FORM S91 REPORT $ENT K

1 - CLEAR OR REG.

TOMaFOR LETTER f$$UED ACTcN

,

3 - DEVIATON lA B

C D lAl8 C

lA BlC D

lgyb pay hvR,l MO.

DAY v4.

4 - viotATcN & oEviAfoN lg, g l l 1 - vis l

l t - VEs p

J f P9Jl l l

'

,

,

,

uOwttmFoRuAToN ll Mooutt mFomuaToN MC MODULE NuM6ER iNsp dg g MooyLE REo. FOLLOWUP l $',c MODULE NUM8ER INSP MODULE REQ FOLLOWUP yg#~5 i:e

~ o

55h5 12

5 EE r

r a-N,G c:.93-

= :c ;-

g-

<-

s 8-1s 8-gs a-

=

s

-

-

-

-

-

-

.

-

.

-e2 a

=

-:. 5 s3a

1

5 1 s

o

+

=

-:

s a

!:

r

-

15355 W38

.? =1

! $ ! =3:

n

=

-

-

.

.

.

.

.

= v!

!l

!

1

!

E E.s

3

,3

-,3 535

~.a r-

-a-u

-

.

-

u

,

.

.

-

= o

.

.

.,

-

,

-

-

liill45 f(,ial?ioS16 oi aio /ioio c.

i QI f Siol7io,Sl8 oicit ii i

lii l

^

^

.

l,,Il lii I

i i i i i

,,

ii i

Iiill lii l

c c

i i i i i

i,

,i

,

liill i i

,,

i lii l

o o

,,

,,

i hi24 t io o k'-

l i i l !aM M al'AOol8 od G i i i

o2 6%/ l?ici? l6 li, I

^

^

s i

liilI l,i l

i i

, i i

i,

,,

i 1,,Il li,

c c

i,

,,

,

,,

,,

,

i,,il i,,

i

-

e

,,

,,

,

,,

,,

t l i i i IRm f ul ooia le

'

oioi2

, i i

es ?ill7a ola oino rioio c-i Ii.

^

.

liill i i i,

i iii i

-

-

,,

,,

i li,ll l

I,,

I c

c

,,

,,

i

, i

,,

i liill 1,,

o o

,,

,,

,

,,

,,

i

. m( /,i/ I7i M la d 049 /o o c.

liilld f 2isisMRIE>

c oia ii i lii I

^

i liill Iii l

=

,,

i,

,

. i i,

i Iiill lii I

c c

i,

,,

,

i i

,,

i hA

'

g j_ii ii

--

-

gg g

.

.

a

r

[

.f

..

.

,.,

NRCFO*M788 U.S. NUCLEAR REGULATORY COMMISSION Pm'%C: PAL '%$PECT0a mame est. ksr. ew wxpe e,rc d1141)

(g

[h, h" C" INSPECTOR'S REPORT

,

Office of Inspection and Enforcement

\\

N 1040 %

b.) t u.t A M U

'h5*ECTon5

'

A SA '.0%

mEPont

%Ent s%$aEC ; A*E u;ENSEE SEN3Cm 30: sit NC 8e g s C;eu;ENSE No av Pe03sCTnt3 e.g,.

NO.

SEG Mo

,a

--. 9dN L Ell

dQ(gM glg l

g g j s a

'~$*"

M - WOC;8Y l

' -

~ l g l

,

U lQQ C.1" e - EtETE l

l c

,

_

l l l _

f l

D

~ "I

^

p-. -.,

n

-.... - -..

.,

Pf e*C3 C' '%* E 5LGATC% % 57 E 'c%

t%5'ECTC% *t a., ave: sv c asas IAt<% COOE OF REGCN.*C CON;.0T-

NG A0Tavifv (See.iMO 05JC "ud-xae Sem paOM TC 1 nEGioNAE of f #CE STAFF

] CE4 p neee, us co, e. ert,g " 8m ecoe i uo.

Day l vn

DAv l vit 2 - DEstCENT tN5PECT04 J 3'ON C' 3'C" 94'N "

f l

l l ll l

l l l 3 - PEme0RMANCE APPa AISAL TEAU I

-

70.!)5.".

'

31'

.. -. ~.,..,-

-

~ ~ ' ' ~ ~ ~ ' ' ' ~ ~ ~ ~ ~ ' ~ ~ '

'-~3"-] '"~b

[ ~~ b

  • *' ^*" 72-

.;;

.-

PEGICNAL ACTach

_

Tv PE Cs AcTmf v c;%D ;TE: cec.o, x.ow.

  • * " * * * * *

02 - S AFETY 06 - MGMT. V:5lT tc PLANT $EC.

14 = 1%OVIRT 1 - haC FO AM 591 03 - INCICENT 07 - SPEC:AL

'%% E%T VER 15 INVE$7G AT.0%

2 REOs0NAL CSFiCE LE*TER 08 - EN504 CEMENT 08 - VtNDOR 12 - 5 svtNT uponi

_} 06 - VGVT. AUDIT Ob-MATACCT l l ?).VaCa?

_

.,,,,y-,.-.-,

...m.,,.,-.-m,....

- _-

_

, _.

,

,-,m-

-. p a...;.... t s. 5=..a. e.w '. s Ne ce bee aai.

?g A6 NsV9E4 ENscaCEvtNT CC%staENCE

"E*C4' CCN' A % 780 LE*TER Os aEPCRT T* AN5v TT AL CATE g, W'CJfiONS A D

    • ELO

'N ' ' # ' CN A

B C

D CE viAT80NS ga: sCav ss)

SE*3aT5ENT 1 - CLEAR C4AEG TQ nQ. FCS LET'E' t$ 5UED ACTION 2 - VC ATiON l8 l C lD Al9IC l0 l Al8 Cl0

.a'l _

OA,v lva uol DAY l

  • A 3 - CEd1 Af tCN A

,

_

l l l l l 4 - v'C.A' SON &;i.AT'04 j

l

j l lt l

l

vts

_-

, l,

=..x.3.

, v ES 1 % M3

,

,

..

x vr-- - --erv,9.:

--

--

. ~..,, - - - - - l,,

,; g -- -

,,

.

.: x.E,%. C.. A r oN

.m. I s.c.

AT cN

.

h{

MODJLE #EQ FCLLCb%up

,k MODULE NuveE4 sN$P.

.;, g e MODULE REQ FoL60.'. *

YODULENvvBEA+458 TNI5 ie i

r

NI5 39 I

E r

s

5 a5

=

.,,

-i, as

85

c::s s :i :

.

g,!

s 5
:

a 3. :g 1c--, a y82

-

g.:

5 s.

2 :

-.

-

-

-

,-

se

-

.

,

.

c.

=

-

.

,,

.

,!52s"$

! g $

,.

g3

,

8 a-

L
5l 5 Er a:.y t82

%

,.

-

,

c--

,

.

2 <

o

-;;r ao

_-g g

g g,;

8s

-

,

-

.

rrar

.

<

<

i i5 i

a r

I a5

.

,

,

f a5

s

.

zw 1i

,

s

.di)M43Ja cioi/

i i i liil viss 6/l?ioihlA ot or /

/ioio 4 i

'

li,l

'

'!

li,l Ii,I

,,

i i i

i i i i i

.l Iiil lii!

..

.,

,

,,

i i i

liil

li,i

,,

,,

i

.,

,,

,

UX5 7i Al70 0_IA'Il0103 Nd liil dd f 6i/ l?i oi7 !3 p oM /ioo C li,!

'

,

i

'! I liil lii Ii,l

i i i i i

i !

,

-l 1,,1

-

,,

,,

i l,i i

, i i,

,

l l

.,

1,,1 I,,1

,,

,

,,

,,

,

e u iI 6i/ hica !6 'l oioi3 1,oio c-l liil dr66i/l?idel6

'00i/

!,o d C i li,I

'

i l

le il

'.e i

i i liiI

.'

i i i e i

!,t !

'

,,

i,

,

!,

'

,I

, I i

! l,,

l,l,,!

ll,,

!,', I

,,

, i i

dj$' 6/17i 1514 4 l0oi/

/ioio C.

i J,6[6i/ l A /i01 d'

020i/ /oo

liil H

F._

i lii i Vli, l,il liii

'

,,

,

ii i,

i dli, li,1 liil

i,

.

i,

,,

i m..m....A

i

,

i

.

6*

.'*St

,

i i ii f

i1 i,

i e i

i i

.ps n

.a. -.

.: 3.

v

. p.w

. s. i,

...,

...

,,

.t,

.

c

- _ _ _ _ _ _ _ -

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ -