IR 05000282/1996011

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-282/96-11 & 50-306/96-11.Corrective Active Will Be Exam During Future Insps
ML20132A370
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/09/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Watzl E
NORTHERN STATES POWER CO.
References
NUDOCS 9612160032
Download: ML20132A370 (2)


Text

December 9, 1996

SUBJECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORTS NO. 50-282/96011(DRS); 50-306/96011(DRS)

Dear Mr. Watzl:

This will acknowledge receipt of your letter dated November 25,1996, in response to our letter dated October 25,1996, transmitung a Notice of Violation associated with

the failure to make an adequate evaluation of radiological conditions within the 121 Spent

{

Resin Tank room. We have reviewed your corrective actions and have no further i

!

questions at this time. These corrective actions will be examined during future inspections.

Sincerely

.

Original Signed by Brent Clayton (for)

Geoffrey E. Grant, Director Division of Reactor Safety I

Dockets No. 50-282: 50-306 Enclosure:

Ltr dtd 11/25/96 cc w/o encl: Plant Manager, Prairie Island John W. Ferman, Ph.D.

Nuclear Engineer, MPCA cc w/ encl:

State Liaison Officer, State of Minnesota State Liaison Officer, State

>j

'

of Wisconsin

/ I Tribal Council, Prairie Island

Dakota Community DOCUMENT NAME: G:DRS\\PRA12036.DRS To enceive e copy of this document. Indicate in the boa: "C" = Copy without attachment / enclosure

"E" = Copy with attachment / enc 60suie

'N" = No copy f

l0FFICE RIII c_ RIII

/A/ RlII I? RIII A lE

_

INAME RGlinski:jp f/r-TKozak M JJacobsonWG BClayton/GGrant

lDATE 12/ 3 /96 12/ J /9C //

12/ 3 /96 12/ / /96

)

'

"

0FFICIAL'k JORD COPY 9612160032 961209 PDR ADOCK 05000282 G

PDR

_ _. _... _ _ _. _ _ _ _.. _. _

'

.

'

.

E. Watz1-2-December 9, 1996 i

Distribution:

Docket File w/enct Rlli PRR w/enct Enf. Coordinator, Rlli w/enci PUBLIClEd1_wjed SRis, Prairie Island, CAA1 w/enci (E-mail)

~OC/LFDCB w/enci Monticello w/enct W. L. Axelson, Rlli w/enci

>

DRP w/ encl LPM, NRR w/enct A. B. Beach, Rlll w/enci DRS w/enci i

l l

i

.

,

.

l l

i

.

. -

.

.. _ _ _ _

,

-_

-.-

-

_,

.-

gy

.

-

,

Northarn Stat:s Power Company

'

Prairie island Puclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 November 25,1996 10 CFR Part 2 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos.50-282 License Nos.DPR-42 50-306 DPR-60 Reply to a Notice of Violation (Inspection Report 96011),

Failure to Make an Adequate Radiological Survey Your letter of October 25,1996, which transmitted Inspection Report No. 96011, (..

required a response to a Notice of Violation. Our response to the violation is contained in the attachment to this letter.

  • In this letter, we have made no new NRC commitments.

Please contact Jack Leveille (612-388-1121, Ext. 4662) if you have any questions related to this letter.

AficY b

Michael D Wadley Plant Manager Prairie Island Nuclear Generating Plant c:

Regional Administrator-Region 111, NRC Senior Resident inspector, NRC NRR Project Manager, NRC J E Silberg Attachment: REPLY TO A NOTICE OF VIOLATION (

-

-

.- -

- -..

-

.

-.

i

.-

.

j

-

i

-

!~

REPLY TO A NOTICE OF VIOLATION

10 CFR 20.1501(a) requires that each licensee make or cause to be made surveys that

i may be necessary for the licensee to comply with the regulations in Part 20 and that are

,

reasonable under the circumstances to evaluate the extent of radiation levels,

'

concentrations or quantities of radioactive materials, and the potential radiological

hazards that could be present.

!

Pursuant to 10 CFR 20.1003, survey means an evaluation of the radiological conditions and potential hazards incident to the production, use, transfer, release, disposal, or presence of radioactive material or other sources of radiation.

Contrary to the above, as of September 18,1996, the licensee did not make an adequate survey to assure compliance with 10 CFR 20.1701, which requires licensees to use, to the extent practical, process or other engineering controls to control the concentrations of radioactive materialin air. Specifically, a contamination survey in the spent resin tank room inaccurately determined levels to be 45,000 disintegrations per minute (dpm) when actual levels were 450,000 dpm. Due to the inadequate evaluation of the contamination survey, the licensee did not use, to the extent practical, process or other engineering controls to control the concentrations of radioactive material in air for i

work in the spent resin tank room.

(

This is a Severity Level IV violation (Supplement IV).

RESPONSE TO VIOLATION Backaround Two laborers and a radiation protection specialist (RPS) entered the Waste Gas Decay Tank (WGDT) room to remove the loose cement blocks for entry into 121 Spent Resin Tank (SRT) room. They took Polaroid pictures of the outer layer of blocks to the SRT room. This was done to assist whoever would replace the block wall at the end of the job. They then removed the small amount of grout surrounding the outer layer of block.

The outer layer was then removed; each cement block was wiped with a wet cloth and laid on the floor. The RPS then surveyed the opening. The survey was for radiation only and revealed < 1 mrem /hr gamma. This sequence was continued until the last of five layers was removed. As each successive layer of blocks was removed they were placed on top of the previously removed blocks in the WGDT room.

Once all the blocks were removed the RPS reached in and conducted a quick radiation survey within 121 SRT room. The survey showed only 10 mrem /hr gamma. He then reached in and grabbed a smear of the floor within the SRT room. He then smeared (

the floor within the opening to the SRT room and on his way out of the WGDT room he i

_., -

.

.

.

,

_

.

.

j o

,

Attachment November 25,1996

!

Page 2 U

_ smeared 5 other locations. He informed the laborers not to go into the SRT room until (

l he returned with the results. The laborers were allowed to clean up some of the dust

,

on tanks and pipes within the WGDT Room. The RPS retumed to the access control station and counted the smears on the smear counter. When the counter was through, he quickly looked at the printout. At this time the access control station lead RPS asked him what he had for results. The RPS covering the job misread the small print

,

on the report as 45000 dpm/100 cm instead of the actual 450000 dpm/100 cm printed -

2 on the printout, and reported this to the lead RPS. He then asked the lead RPS to place the printout on the table and he would complete the paper work later. The lead

>

RPS placed the printout on the table.

The RPS retumed to the work site and informed the workers of the results. The RPS entered 121 SRT room to conduct a more extensive radiation and contamination survey. The second laborer left the area to get a clean mop, mop bucket and new light bulbs. The first laborer then mopped the reachable areas of the SRT room using mop

'

water previously used in the WGDT room.

The second laborer returned to 121 SRT room with another mop bucket of clean water, mop and light bulbs. The first laborer then mopped the reachable areas of the SRT room using clean water. The RPS went from the SRT room to the WGDT room to allow both laborers space to clean. The second laborer entered the SRT room to assist in (

placing a 6 foot ladder in the room for replacing the light bulbs.

p All individuals retumed to the access control station. As the laborers walked near the

!

Gamma 10 Radiation monitor, it alarmed. The access control station lead RPS then i

suweyed the laborers and discovered contamination on their clothing, skin, and nasal '

)

passages. Allindividuals involved with the work in 121 SRT room required

!

decontamination.

I'

-

Reason for the Violation

!

After counting smears used for sumeying the SRT room, the RPS mis-read the printout.

The printout design used a small font size with no commas and no programmed

wamings were used other than the common low level contamination waming. The

!

small font made it difficult for the RPS to read the difference between 45000 dpm/100

2

cm and 450000 dpm/100cm,

Corrective Steos Taken and Results Achieved

'

)

'

!

All individuals involved were successfully decontaminated. Conservative dose assessments based on the contamination showed a dose ofless than 25 mrem.

.

'

(

zau m.coe

_ _, -

.....

.

.. -

-

- - - -

~.-.

- -.. ~ -.-..-..

. ~. - -

.-~.. - ---..

.

[

Attachment November 25.1996

.

Page 3

,

,

Corrective Steos to Avoid Further Violation

.

(

.

)

The computer programming for the smear counter results was changed to include warnings for levels above the current station action levels. These warnings significantly

'

change the survey result printouts' appearance from the routine printouts. In addition,

,

the programming will be changed to eliminate unnecessary data. The elimination of this

data will allow room to use a larger font size.

Date When Full Comoliance Will Be Achieved

?

Full compliance has been achieved.

.

'

Proaram Enhancements

!

i Following this event, an intemal assessment of this violation was done. Weaknesses identified in the areas of Work Order ALARA Review checklist and pre-job briefings for j

infrequently performed tests and evolutions may have prevented management expectations from being fully met for entering the SRT room. The following actions

,

address the identified weaknesses.

4 (

1. A step was added to the Work Order ALARA Review checklist reminding writers to

-

review the Lessons Leamed Radiation Protection implementing Procedure (RPIP).

Reminders of the potential that infrequently entered spaces may have high

,

radiation, contamination, and high airbome were added to the Work Order ALARA

~

' Review checklist. This event was added to the Lessons Learned RPIP.

i

!

2. The Radiation Protection group decided to have the group discuss ALARA reviews prior to work performance. Existing ALARA reviews are being revised to address

the revision of the Work Order ALARA Review checklists.

!

3. The Radiation Protection group evaluated other methods for looking up past

problems for infrequently entered areas and determined to maintain the work history

]

files of radiologically significant work in a manner to provide easy reference.

.

4. The plant will review and update as necessary its definition of Infrequently

l Performed Tests and Evolutions to ensure that they receive additional management j

attention prior to their performance.

i 5. Radiation Protection management has reinforced expectations conceming job planning, communications, pre-job briefings, questioning attitudes and

,

!

conservatism.

j 1R96011. DOC

.

s