A2 Mb 609D/3%

g 1- UNITED STATES

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30eeH001

\***** March 6, 1997 CAL No. NRR-97-001 Mr. Michael D. Wadley, Senior Vice President of Nuclear Operations Northern States Power Company ,

414 Nicollet Mall l Minneapolis, MN 55401 j SUBJECT: CONFIRMATORY ACTION LETTER - PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2

Dear Mr. Wadley:

The NRC communicated to your staff on October 9, 1996, that an unreviewed safety question (USQ) associated with post-seismic cooling water system operations existed. This was documented in NRC special inspection report nos. 50-282/9605(DRS) and 50-306/96014(DRS) on November 1, 1996.

Specifically, taking credit for the nonseismic intake canal as a source of water following a seismic event and the implementation of operator actions to reduce nonessential cooling water loads following an earthquake involved a USQ. On January 29, 1997, Northern States Power Company (NSP) submitted a license amendment to resolve the USQ. The NRC sent NSP a. request'for additional information on February 21, 1997, in which we asked that additional l analyses be serformed to seismically qualify the intake canal. NSP is l performing t1e additional analyses, which may take several weeks, and is also considering interim measures in order to resolve the USQ.

Pursuant to NSP's letter dated March 3, 1997, it is our understanding that NSP will take the following action:

-

NSP will not take Unit 2 beyond hot shutdown (Mode 3) until the NRC staff determines that the USQ has been satisfactorily resolved.

Pursuant to Section 182 of the Atomic Energy Act, 42 U.S.C. 2232, you are required to:

(1) Notify me immediately if your understanding differs from that set forth above; (2) Promptly notify me if for any reason you intend to change or deviate from the commitment discussed above.

.

g C RECDg 3 COPY y(

9703130079 DR 970306 ADOCK 05000282

~

PDR

..

__ ._. _ _ _ _ . _ . . . . . _ . _ ~ . . _ . . _ _ ._ . _ _ . _ _ _ _.

. .

l March 6, 1997 Issuance of this Confirmatory Action Letter does not preclude issuance of an .

order formalizing the above comitment or requiring other actions on the part of the licensee; nor does it preclude the NRC from taking enforcement action .

for violations of NRC requirements that may have prompted the issuance of this l 1etter. In addition, failure to take the actions addressed in this l

Confirmatory Action Letter r.4y result in enforcement action.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and your letter of intent dated March 3,1997, will be placed in the NRC Public Document Room (PDR).

Sincerely,

Jari. W. Roe, Director l Division of Reactor Projects III/IV j Office of Nuclear Reactor Regulation Docket Nos. 50-282/50-306 cc: See next page .

I

!

J

,

'

.

'

.. . - . _ _ ,

s. .__ _. _

_ ,.

1 -

-

- ,,

.

.

r

'

a r 1

' ' -

a ; l * "

' Mahch.6, 1997  ! < '

~ '

' -

. ;?, ; ; -. ~ , ,' .y

,

. _i,  ;' tv ,

Issuance of this Confirmatory Action Letter 'does not, preclude issuancefof an l..

orderformalizingtheabovecommitmentorrequiring'otheractionson.theparth:"'

of the licensee; nor does it preclude the NRC from taking enforcement" action for violations of NRC requirements that may have prompted the issuance of this letter. In addition, failure to take the actions addressed in this.

'

Confirmatory Action Letter may result in enforcement, action.' ' i, -

j In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of .

this letter and your letter of intent dated March 3,1997, will be 'placed in l I

the NRC Public Document Room (PDR).

!

Sincerely,

l l

Orig. signed by Elinor G. Adensam l for Jack W. Roe, Director  !

l Division of Reactor Projects III/IV l t

Office of Nuclear Reactor Regulation i Docket Nos. 50-282/50-306

! cc: See next page l

l l

DISTRIBVTION:

i Docket File- ACRS S. Collins /F.Miraglia

.

PUBLIC JCaldwell, RIII R.Zimmerman

! PD3-1 Rdg JJacobson, DRP/RIII A.Thadani JRoe EAdensam (EGA1) J.Lieberman, OE OGC MBoyle H. Thompson, EDO DOCUMENT NAME: G:\WPDOCS\ PRAIRIE \PI. CAL *See previous concurrence To receive a copy of this document, Indicate In the box C= Copy w/o attachment / enclosure E= Copy with attachment / enclosure N =

N3 copy _

0FFICE PM:PD31 C LA:PD31 C *0GC *DRP:R3- C D:PD31_ N D;,h NAME BWetZe CJamersonC/ LChandler JCaldwell JHannon be i DATE 3/(o/97 3/h/97[) 3/4/97 3/5/97 3[() /97

'

k3/[f/97 *

'

,

OFFICIAL RECORD COPY <

-s N l

, ,

,

  • ,A

"

b l ,

,

, [}

.+ '

t, 4 '. .

' *

  • '

. /* j

._ . _ _ . _ . _ . . _ _ _ _ _ _ . _ _ . _ . . _ _ _ _ _ _ _ .. . _ _ _ _ _ . . . _ . .

. . Issuance of this Confirmatory Action Letter does not p eclude issuance of an order formalizing the above commitment or requiring her actions on the part

.of the licensee; nor does it preclude the NRC from aking enforcement action .

for violations of NRC requirements that may have rompted the issuance of this

. letter. In addition, failure to take the actio s addressed in this Confirmatory Action Letter may result in enfo ement action.

,

-

Sincer y, u

!

Jack W. Roe, Director Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-282/50-306

'

cc: See next page

.

J DISTRI TION:

Docket / File ACRS PUBLIC JCaldwell, RIII PD3/1Rdg JJacobson,DRP/RIII JRde EAdensam (EGAl)

06C

' DOCUMENT NAME: G:\WPDOCS\ PRAIRIE \PI. CAL l

Tacopy no receive e copy of this document, indicate l /tin thq} boxattachment

_1 CM w/ /erslosure E= Copy with attachment / enclosure N =

L., , 4 0FFIm PM:PD31 Cs LA:PD31 C b k[D3P d '

f D:PD312 0:DRPW j WE BWetZel p CJamersok/ /204#0h YCahcN JHann[ JRoe DATE 3/Y/97 3/f/97[ 3 / u /97 3/ 97 3/[/97 3/ /97 0FF;CIAL RECORD COPY

] f

,

3 -

i

- - - - . - .

. - - . -. . - . _ _ . . . . - - ~ , . . . _ . . - . - - . - .

.

..

Mr. Michael Wadley Prairie Island Nuclear Generating Northern States Power Company Plant cc:

J. E. Silberg, Esquire Tribal Council i Shaw, Pittman, Potts and Trowbridge Prairie Island Indian Community {

2300 N Street, N. W. ATTN: Environmental Department Washington DC 20037 5636 Sturgeon Lake Road Welch, Minnesota 55089 Plant Manager Prairie Island Nuclear Generating Mr. Roger 0. Anderson, Director l Plant Licensing and Management Issues l Northern States Power Company Northern States Power Company l 1717 Wakonade Drive East 414 Nicollet Mall )

Welch, Minnesota 55089 Minneapolis, Minnesota 55401 '

Adonis A. Nebiett Assistant Attorney General ,

Office of the Attorney General '

455 Minnesota Street Suite 900 St. Paul, Minnesota 55101-2127 l U.S. Nuclear Regulatory Commission Resident Inspector's Office .

1719 Wakonade Drive East We1.ch, Minnesota 55089-9642 I Regional Administrator, Region III ,

U.S. Nuclear Regulatory Commission  !

S01 Warrenville Road '

Lisle, Illinois 60532-4351 l l

Mr. Jeff Cole, Auditor / Treasurer l Goodhue County Courthouse Box 408 Red Wing, Minnesota 55066-0408 Kris Sanda, Commissioner Department of Public Service 121 Seventh Place East .

Suite 200 St. Paul, Minnesota 55101-2145 Site Licensing Prairie Island Nuclear Generating Plant Northern States Power Company 1717 Wakonade Drive East Welch, Minnesota 55089 w e im