IR 05000282/1996001

From kanterella
Jump to navigation Jump to search
Discusses M Wadley 961007 Request for Clarification of Comments in Exam Repts 50-282/96-01OL & 50-306/96-01OL. Informs That Addl Details Warranted
ML20134L044
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 11/14/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Watzel E
NORTHERN STATES POWER CO.
References
NUDOCS 9611200134
Download: ML20134L044 (2)


Text

. _._ _ - _ _ __ _ _ _ _ . _ . . . . .

1. ,

>

g i

l November 14, 1996 '

,

i l Mr. ; Vice President, Nuclear Generation

,

l Northern States Power Company '

l 414 Nicollet Mall 'i Minneapolis, MN 55401

!

l SUBJECT: REQUEST FOR CLARIFICATION OF EXAMINATION REPORT COMMENTS l

l

Dear Mr. Watzt:

l l We have reviewed a letter from Mr. M. Wadley dated October 7,1996, requesting clarification of comments in operator licensing examination report OL-96-01 with respect l to procedural inadequacies; specifically "During the course of the examination, the l _ examiners observed a number of operations procedures were lacking consistent, >

! comprehensive operator actions to ensure continued safe operations during normal and abnormal conditions. These procedure discrepancies will be discussed in Inspection  !

Reports 50-282/96007; 50-306/96007." '

l l Inspection Report 96007 identifies two separate proceduralissues. The first was  !

l observed when candidates had difficulty in the simulator responding to a degraded voltage - '

,

event. The procedure referenced in the annunciator response procedure did not exist and

, the crew members took actions they deemed necessary without procedural guidance. The  ;

'

second involved a lack of recording "as found" surveillance test data. Although these  ;

, issues had been identified by you, it still showed a weakness in procedures. l

!

'

.

.

At the time the examination report was issued an additional procedure violation was believed to exist. This item was identified by an examiner and involved a potential l l violation for an inadequate surveillance procedure. This item in concert with the two !

examples of procedural problems identified in Inspection Report 96007. formed the basis for the comment in the examination report. ' However, during independent review of the matter before proceeding with a violation, the surveillsnce procedure was determined to be <

satisfactory and therefore this issue was not discussed in inspection Report 96007. l l

Based upon the issues described above, we do not feel you have a significant problem D with operational procedures; however, some additional attention to procedure details may

,

be warranted.

l

,

9611200134 961114 PDR ADOCK 05000282 PDR i

l

. .- _

- ._ - . . . . - . .-.

!T l ,

L i

!

E. Watzi -2- November 14, 1996

>

We will gladly discuss any questions you may have relative to this letter.

l  !'

j_

Sincerely,

i Original Signed by Brent Clayton (for)

Geoffrey E. Grant, Director Division of Reactor Safety I i Docket No. 50-282  !

Docket No. 50-306 e

cc: Plant Manager, Prairie Island John W. Fermar., Ph.D.

Nuclear Engineer, MPCA -

State Liaison Officer, State of Minnesota l State Liaison Officer, State t of Wisconsin Tribal Council, Prairie Island ,

Dakota Community l Cistribution: i Docket File Rlli PRR Enf. Coordinator, Rlli '

PUBLIC lE-42 SRis, Prairie Island, CAA1 (E-mail)

'

OC/LFDCB Montice!!o W. L. Axelson, Rlli j DRP LPM, NRR A. B. Beach, Rill  ;

'

DRS

!

l DOCUMENT NAME: G:DRS\PRA11d6.DRS

To receive a copy of ibis document, indicate in the box "C" = Copy without attach /enci

"E" = Copy with attach /c9cl "N" = No copy OFFICE Rlli C- Rill ,,,

C-- Rlll gt C NAME MLeach:jp 4Vv4 JJacobsh[ok / BClayton/GGrant i DATE 11/4 /96 11//Y/96 11/19/96

-

OFFICIAL RECORD COPY l

l l

!

l