MAR 2 41986 Docket Nos. 50-277 50-278 Philadelphia Electric Company ATTN: Mr. S. L. Daltroff Vice President Electric Production 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

Subject: Inspection Nos. 50-277/86-01 and 50-278/86-01 This refers to your letter dated March 7, 1986, in response to our letter dated February 6,1986.

Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely,

,

"

0-'F1"N1 U1W

[

pCr1 Thomas T. Martin, Dftector Division of Radiation Safety and Safeguards cc:

R. S. Fleischmann, Manager John S. Kemper, Vice President, Engineering.and Research Troy B. Conner, Jr. , Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Eugene J. Bradley, Esquire, Assistant General Counsel Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Engineer in Charge, Licensing Section Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania 0FFICIAL RECORD COPY

\\

8603310154 860324 PDR ADOCK 05000277 O PDR

- .. ., . . . . - . . _ --. . .- _ - . . .

'

. .

i

.

Philadelphia Electric Company 2

.

'

.

bcc: ~

'

Region I Docket Room (with concurrences)

Management-Assistant, DRMA (w/o encl)

Section Chief, DRP i

!

6-

'

.- l s

! -

a i

-

i

I

,

A

i

,

!

j

'

I l

l i

l

!

i

'

' RI:0RSS ft f#('8 RI:l 5 ~ RI S 4 Struckmeyer/mm Pascidk. Bellamy-

-

3////86 3/30/86 3/t.l /86

, OFFICIAL RECORD COPY. RL~PECO 86-01 - 0002.0.0 03/19/86' .

i t

?

d

'._________________._________._.__._______._____________._____________________m__ -

_______.__.a__m._

____ ..

.

.

.

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 f', E h rh , 1986 Docket Nos. 50-277 50-278 Inspection Report Nos. 50-277/86-01 50-278/86-01 .,

Mr. Thomas T. Martin, Director Division of Radiation Safety and Safeguards U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Martin:

Your letter dated February 6, 1986 forwarded Combined Inspection Report Nos. 50-277/86-01; 50-278/86-01 for Peach Bottom Atomic Power Station. Appendix A of your letter addresses one item which does not appear to be in full compliance with Nuclear Regulatory Commission requirements. This item is restated below followed by our response.

As a result of the ir. .oection conducted on January 6-10, 1986, and in accordance with the NRC Enforcement' Policy (10 CFR 2, Appendix C), the following violation was identified:

Section 6.9.2.h(2) of the Units 2 and 3 Technical ,

Specifications' states that "The Radioactive Effloent l Release Reports shall include a summary of the l quantities of radioactive liqui. and gaseous effluents and solid waste released from the site."

Contrary to the above, although the sampling and analysis was performed for Fe-55 as required by Table 4.8.1 of the Technical Specifications, this nuclide was not included in the sumraary of liquid effluents.

This is a Severity Level V violation (Supplement I).

fi,/3.i?i'l & $ rP -

_ _ . . . . _ _ - _ _ _ _ _ _

. Mr. Thomac March 7, 1986

- Pcga 2

.

Admission of Alleged Violation:

Philadelphia Electric Company acknowledges the violation as stated.

Reason for Violation:

The reason for the violation is personnel oversight. The results of the isotopic analyses of liquid radioactive releases are compiled and listed in tabular format for incorporation into the Semi-Annual Effluent Releases Report. The pre-established form for identifying the isotopes for which data is required had been revised by the technician. compiling the reportable data. In the process of revising the form, the_Fe-55 isotope was inadvertently deleted, resulting in a failure to provide ~the required release information.

Significance of Violation:

Sampling and analysis for Fe-55 is performed in accordance with Technical Specification 4.8.B.lc. The results of the Fe-55 analyses are documented in surveillance test ST-7.5.1.f. Failure to list this information in the Semi-Annual Effluent Releases Report had no adverse effect on plant or public safety.- The radiation exposure contribution for Fe-55 was less than 0.01 mR for the i

!

subject six-month reporting period.

Corrective Actions Taken and Results Achieved:

The technician responsible for compiling the Semi-Annual Effluent Report data has been counseled on how to properly complete the forms identifying the reportable data. The analysis results pertaining to Fe-55 have been added to Revision 2 of the Semi-Annual Effluent Releases Report No.

19.

Corrective Actions Taken to Avoid Future Non-Compliance:

The Senior Chemist, during his review of the pre-established forms identifying the reportable data prepared by the technician, will confirm that the forms have not-been revised to. exclude reportable data.

s

, .- ._. _ ,

_ . Mr. Thomas T. Mnrtin March 7, 1986

  • Paga 3

'

.

.

Date When Full Compliance was Achieved:

Full compliance was achieved.when Revision 2 of the Semi-Annual Effluent Releases Report No. 19 was submitted to NRC on February 26, 1986.

~