September 4, 2025

SUBJECT:

SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 - LICENSE RENEWAL PHASE 4 INSPECTION REPORT 05000272/2025011 AND 05000311/2025011

Dear Charles McFeaters:

On August 21, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Salem Nuclear Generating Station, Units 1 and 2 and discussed the results of this inspection with David Sharbaugh, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Erin E. Carfang, Chief Engineering Branch 1 Division of Operating Reactor Safety

Docket Nos. 05000272 and 05000311 License Nos. DPR-70 and DPR-75

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000272 and 05000311

License Numbers:

DPR-70 and DPR-75

Report Numbers:

05000272/2025011 and 05000311/2025011

Enterprise Identifier: I-2025-011-0010

Licensee:

PSEG Nuclear, LLC

Facility:

Salem Nuclear Generating Station, Units 1 and 2

Location:

Hancocks Bridge, NJ

Inspection Dates:

August 11, 2025 to August 21, 2025

Inspectors:

P. Cataldo, Senior Reactor Inspector

M. Hardgrove, Senior Project Engineer

D. McHugh, Reactor Inspector

Approved By:

Erin E. Carfang, Chief

Engineering Branch 1

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a License Renewal Phase 4 inspection at Salem Nuclear Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===71003 - Post-Approval Site Inspection for License Renewal

The team conducted a Phase 4 license renewal inspection as outlined in NRC IP 71003. The team selected six aging management programs for evaluation based on risk insights and programs that were enhanced or new under the renewed operating license for each unit. The team also considered for selection those programs with monitoring results that were performed for the first time or those that identified examination or test results not experienced in the past.

For the aging management programs selected, the team reviewed records, interviewed plant staff, and conducted plant walk downs to evaluate whether aging management program elements were being implemented in accordance with NRC requirements. The team evaluated the following elements of the aging management programs: scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmation process, administrative controls, and operating experience.

The following aging management programs were evaluated by the team:

Post-Approval Site Inspection for License Renewal===

(1)

(B.2.1.22) Buried Piping Program (2)

(B.2.1.24) External Surfaces Monitoring Program (3)

(B.2.1.26) Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Program (4)

(B.2.1.28) ASME XI, Subsection IWE (5)

(B.2.1.34) Inspection of Water-Cooled Structures Associated with Nuclear Power Plants (6)

(B.2.1.38) Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Program

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified that no proprietary information was retained or documented in this report.

  • On August 21, 2025, the inspectors presented the License Renewal Phase 4 inspection results to David Sharbaugh, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71003

Corrective Action

Documents

Resulting from

Inspection

NOTF 20999450

LRP4 NUCMs Do Not Address Notifications

NOTF 20999508

LRP4 SSPC-VIS-2 Reference in OU-AA-335-018

NOTF 20999514

LRP2 NRC Ineffective SWIS LR Inspections

NOTF 20999519

LRP2 NRC Ineffective Chilled Water System Inspections

NOTF 20999599

LRP4 NRC SWYD Vault PCR

NOTF 20999601

LR-S 11 SW Pump Bay Pit Concrete Slab Repair

NOTF 20999629

Turtle Observed at Salem Circ Water

NOTF 20999733

LRP4 NRC SRB Feed Standing Water 1BDE35

NOTF 20999734

LRP4 NRC SRB Feed Standing Water 1BDE36

NOTF 20999735

LRP4 NRC SRB Feed Standing Water 1BDE37

NOTF 20999736

LRP4 NRC SRB Feed Standing Water 1BDE36

NOTF 20999736

LRP4 NRC SRB Feed Standing Water 1BDE38

NOTF 20999737

LRP4 NRC SRB Feed Standing Water 1BDE39

NOTF 20999738

LRP4 NRC SRB Feed Standing Water 1BDE40

NOTF 20999739

LRP4 NRC SRB Feed Standing Water 1BDE41

NOTF 20999740

LRP4 NRC SRB Feed Standing Water 1BDE42

NOTF 20999741

LRP4 NRC SRB Feed Standing Water 1BDE43

NOTF 20999742

LRP4 NRC SRB Feed Standing Water 1BDE42

NOTF 20999743

LRP4 NRC Switchyard Dewatering Evaluation

NOTF 21000042

LRP4 NRC IWE Visual Exam Enhancement

Miscellaneous

SH-PBD-AMP-

XI.M36

External Surfaces Monitoring

Revision 2

SH-PBD-AMP-

XI.E3

Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements

Revision 2

SH-PBD-AMP-

XI.M34

Buried Piping Inspection

Revision 3

SH-PBD-AMP-

XI.M38

Buried Piping Inspection

Revision 3

SH-PBD-AMP-

XI.S1

ASME Section XI, Subsection IWE

Revision 4

SH-PBD-AMP-

RG 1.127, Inspection of Water-Control Structures

Revision 2

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

XI.S7

Associated with Nuclear Power Plants

NDE Reports

S-IR-6S0-0030

(010)

Service Water Intake Structure (2023), Baseline Database for

Structures Monitoring Program, Salem Generating Station,

Units 1 & 2

Revision 0

Procedures

ER-AA-3003

Cable Condition Monitoring and Aging Management Program

Revision 4

ER-AA-310-101

Condition Monitoring of Structures

Revision 3

ER-AA-5400-100

Underground Piping Examination Guide

Revision 5

ER-AA-700-1012

External Surfaces Monitoring Aging Management Program

Revision 1

ER-AA-700-1014

Inspection of Internal Surfaces in Miscellaneous Piping and

Ducting Components Aging Management Program

Revision 1

MA-AA-716-010-

1000

Maintenance Planning

Revision 19

MA-AA-724-105

VLF Tan Delta and Withstand Cable Testing

Revision 4

SA-AA-117

Excavation, Trenching, and Shoring