MONTHYEARML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22116A1922022-03-30030 March 2022 Post Exam Comments and NRC Resolutions (Folder 1) ML22175A1682022-02-11011 February 2022 Final Written Examination and Operating Test Outlines (Folder 3) ML22175A1522022-02-11011 February 2022 Amended Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1892022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22175A1932022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22116A1772022-02-11011 February 2022 Final Operating Test (Sections a, B, and C) (Folder 3) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1742022-02-11011 February 2022 Handouts to Applicants (Summary) (Folder 3) ML22175A1782021-11-29029 November 2021 Draft Written Examination (Folder 2) ML22175A1772021-11-29029 November 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML22175A1942021-09-23023 September 2021 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) NTD-21-060, Draft Written Examination and Operating Test Outlines (Folder 2)2021-09-0303 September 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20279A4372020-10-13013 October 2020 September 9, 2020, NRC Generic Fundamentals Examination for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19289C4412019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18107A2302018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval 2023-08-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22116A1922022-03-30030 March 2022 Post Exam Comments and NRC Resolutions (Folder 1) ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22175A1742022-02-11011 February 2022 Handouts to Applicants (Summary) (Folder 3) ML22116A1772022-02-11011 February 2022 Final Operating Test (Sections a, B, and C) (Folder 3) ML22175A1522022-02-11011 February 2022 Amended Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1682022-02-11011 February 2022 Final Written Examination and Operating Test Outlines (Folder 3) ML22175A1932022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22175A1892022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1772021-11-29029 November 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML22175A1782021-11-29029 November 2021 Draft Written Examination (Folder 2) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML22175A1942021-09-23023 September 2021 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) NTD-21-060, Draft Written Examination and Operating Test Outlines (Folder 2)2021-09-0303 September 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17201A0612017-07-19019 July 2017 Senior Reactor and Reactor Operator Initial License Examinations - Salem Nuclear Generating Station IR 05000272/20173022017-06-29029 June 2017 Senior Reactor Operator Retake License Examination Report 05000272/2017302 and 05000311/2017302 ML17249A1322017-06-0707 June 2017 Final Qa/Related Forms (Folder 1) ML17174B2102017-06-0606 June 2017 Final Outlines (Folder 3) 2023-05-23
[Table view] |
Text
Salem Op Test Comments Job Performance Measures:
Sima: Update cover page- this is not an alternate path JPM.
Sim b: No comment.
Sim c: Change to put 21 charging pump in service instead of PDP for set up.
Sim d: No comment.
Sim e: JPM step 12 is not critical. Remove T-hot from initial conditions. Add cue to elicit C/D rate and observe applicant response to adjust C/D rate.
Sim f: Update cover page- this is not an alternate path JPM.
Sim g: Modify simulator set up regarding procedure IOP-3.
Sim h: No comment.
IP i: At JPM step 5.9.4 clarify droop switch position.
IP j: Clarify how to remove key from lock.
IP k: At step 5.5.4 specify what ~1auge is being used. At steps 5.5.5 & 5.5.6 specify the location of the valves.
RO Admin A 1-1: Conduct in classroom instead of simulator. Clarify cues to focus applicant actions. Correct number of minutes (1 010 vs 1000) or start time to equal 1000 minutes.
RO Admin A 1-2: No comment.
RO Admin A2: Delete last line of initiating cue. Enhance answer key due to possible multiple isolation points.
RO Admin A4: Add set up info for simulator operator.
SRO Admin A1-1: Fix cue sheet to match cover page initial conditions. Add trend data to support conservative decision on application of table.
SRO Admin A 1-2: No comment.
SRO Admin A2: Provide optional tagging point in JPM step 2.
SRO Admin A3: No comment.
SRO Admin A4: No comment.
Scenarios ESG-1: Modify the expected dilution for the reactivity plan.
ESG-2: Correct 21 B vs 23 BOOS in initial conditions. Explain Note on Form ES-D-1 about CTs in parentheses. Make this the spare.
ESG-3: No comment.
ESG-4: Add TS to event 4.
ESG-5: Replace event 7 (LOOP) with RCP 'C' tripping.
Salem Op Test Comments Job Performance Measures:
Sima: Update cover page- this is not an alternate path JPM.
Sim b: No comment.
Sim c: Change to put 21 charging pump in service instead of PDP for set up.
Sim d: No comment.
Sim e: JPM step 12 is not critical. Remove T-hot from initial conditions. Add cue to elicit C/D rate and observe applicant response to adjust C/D rate.
Sim f: Update cover page- this is not an alternate path JPM.
Sim g: Modify simulator set up regarding procedure IOP-3.
Sim h: No comment.
IP i: At JPM step 5.9.4 clarify droop switch position.
IP j: Clarify how to remove key from lock.
IP k: At step 5.5.4 specify what ~1auge is being used. At steps 5.5.5 & 5.5.6 specify the location of the valves.
RO Admin A 1-1: Conduct in classroom instead of simulator. Clarify cues to focus applicant actions. Correct number of minutes (1 010 vs 1000) or start time to equal 1000 minutes.
RO Admin A 1-2: No comment.
RO Admin A2: Delete last line of initiating cue. Enhance answer key due to possible multiple isolation points.
RO Admin A4: Add set up info for simulator operator.
SRO Admin A1-1: Fix cue sheet to match cover page initial conditions. Add trend data to support conservative decision on application of table.
SRO Admin A 1-2: No comment.
SRO Admin A2: Provide optional tagging point in JPM step 2.
SRO Admin A3: No comment.
SRO Admin A4: No comment.
Scenarios ESG-1: Modify the expected dilution for the reactivity plan.
ESG-2: Correct 21 B vs 23 BOOS in initial conditions. Explain Note on Form ES-D-1 about CTs in parentheses. Make this the spare.
ESG-3: No comment.
ESG-4: Add TS to event 4.
ESG-5: Replace event 7 (LOOP) with RCP 'C' tripping.