Salem Op Test Comments Job Performance Measures:
Sima: Update cover page-this is not an alternate path JPM.
Sim b: No comment.
Sim c: Change to put 21 charging pump in service instead of PDP for set up.
Sim d: No comment.
Sim e: JPM step 12 is not critical. Remove T-hot from initial conditions. Add cue to elicit C/D rate and observe applicant response to adjust C/D rate.
Sim f: Update cover page-this is not an alternate path JPM.
Sim g: Modify simulator set up regarding procedure IOP-3.
Sim h: No comment.
IP i: At JPM step 5.9.4 clarify droop switch position.
IP j: Clarify how to remove key from lock.
IP k: At step 5.5.4 specify what ~1auge is being used. At steps 5.5.5 & 5.5.6 specify the location of the valves.
RO Admin A 1-1: Conduct in classroom instead of simulator. Clarify cues to focus applicant actions. Correct number of minutes (1 010 vs 1000) or start time to equal 1000 minutes.
RO Admin A 1-2: No comment.
RO Admin A2: Delete last line of initiating cue. Enhance answer key due to possible multiple isolation points.
RO Admin A4: Add set up info for simulator operator.
SRO Admin A1-1: Fix cue sheet to match cover page initial conditions. Add trend data to support conservative decision on application of table.
SRO Admin A 1-2: No comment.
SRO Admin A2: Provide optional tagging point in JPM step 2.
SRO Admin A3: No comment.
SRO Admin A4: No comment.
Scenarios ESG-1: Modify the expected dilution for the reactivity plan.
ESG-2: Correct 21 B vs 23 BOOS in initial conditions. Explain Note on Form ES-D-1 about CTs in parentheses. Make this the spare.
ESG-3: No comment.
ESG-4: Add TS to event 4.
ESG-5: Replace event 7 (LOOP) with RCP 'C' tripping.
Salem Op Test Comments Job Performance Measures:
Sima: Update cover page-this is not an alternate path JPM.
Sim b: No comment.
Sim c: Change to put 21 charging pump in service instead of PDP for set up.
Sim d: No comment.
Sim e: JPM step 12 is not critical. Remove T-hot from initial conditions. Add cue to elicit C/D rate and observe applicant response to adjust C/D rate.
Sim f: Update cover page-this is not an alternate path JPM.
Sim g: Modify simulator set up regarding procedure IOP-3.
Sim h: No comment.
IP i: At JPM step 5.9.4 clarify droop switch position.
IP j: Clarify how to remove key from lock.
IP k: At step 5.5.4 specify what ~1auge is being used. At steps 5.5.5 & 5.5.6 specify the location of the valves.
RO Admin A 1-1: Conduct in classroom instead of simulator. Clarify cues to focus applicant actions. Correct number of minutes (1 010 vs 1000) or start time to equal 1000 minutes.
RO Admin A 1-2: No comment.
RO Admin A2: Delete last line of initiating cue. Enhance answer key due to possible multiple isolation points.
RO Admin A4: Add set up info for simulator operator.
SRO Admin A1-1: Fix cue sheet to match cover page initial conditions. Add trend data to support conservative decision on application of table.
SRO Admin A 1-2: No comment.
SRO Admin A2: Provide optional tagging point in JPM step 2.
SRO Admin A3: No comment.
SRO Admin A4: No comment.
Scenarios ESG-1: Modify the expected dilution for the reactivity plan.
ESG-2: Correct 21 B vs 23 BOOS in initial conditions. Explain Note on Form ES-D-1 about CTs in parentheses. Make this the spare.
ESG-3: No comment.
ESG-4: Add TS to event 4.