IE Mgt Meeting Rept 50-271/81-17 on 810929.No Noncompliance Noted.Major Areas Discussed:Findings of Region 1 Systematic Assessment of Licensee Performance Program Evaluation Board
ML20039A134
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/30/1981
From: Collins S, Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20039A125 List:
References
50-271-81-17, NUDOCS 8112160262
Download: ML20039A134 (2)


Text

-

~

..

k Z.

'

e

'

'

%

,_

,

. + /m

+

-

'i

,

,

,

  • y

-

s,-,

e N.\\f I-U.S.' NUCLEAR REGULATORY COMMISSION

^

M,,"

0FFICE OF INSPECTION AND ENFORCEMENT w-4-a s

Region I

A Report No. 50-271/81-17

'

Docket No. 50-271

~

License No. DPR-28 Priority Category C

--

'

L'icenseei_ -Vermont Yankee Nuclear Power Corporation

'

1671 Worcester Road s

p

__

A Framingham, Massachusetts 01701

'

Facility Name:

Vermont Yankee Nuclear Power Station Meeting At:

Vernon, Vermont Meeting Conducted:

September 29, 1981

// _PD

/

NRC Personnel w

S. J. Collins, Resident Inspector dite signed

,

-%

m

~5 date signed

,

Approved By:

hhd

//Jo[j;V/

'

t R.' M. GallT,~ Chief, RPS 1A, DRPI date s'igne'd

'

Meeting Summary:

,

Meeting on September 29, 1981 (Report No. 50-271/81-17)

Scope: Special, announced management meeting to discuss the results of the Region I board convened to evaluate the: licensee's performance from July 1, 1980 to June 30, 1981, as part of the NRC's SALP program. Areas addressed included:

Plant Operations; Refueling Operations; Maintenance; Surveillance and Inservice Testing; Personnel Training and Plant Procedures; Fire Protection and Housekeeping; Design Changes and Modifications; Radiation Protection, Radioactive Waste Man'agement, and Transportation; Environmental Protection; Emergency Preparedness; Security and Safeguards; Audits, Reviews, and

,

Committee Activities; Administration, QA and Records, Corrective Actions and Reporting.t Asummahy'ofthelicenseeperformanceevaluationwaspresented.

Results:

..

8112160262 811204%

gDRAnoCM 05000271 PDR;

,

.

_-

-

-.

-

,

.

DETAILS 1.

Licensee Attendees Mr. L. Bozek, Operational Quality Assurance Mr. W. Conway, President and Chief Operating Officer Mr. L. Heider, Vice President Mr. E. Jackson, Manager of Operations Mr. S. Jefferson, Technical Services Superintendent Mr. M. Lyster, Operations Superintendent Mr. W. Murphy, Plant Manager Mr. J. Pellitier, Assistant Plant Manager Mr. D. Pike, Manager Operational Quality Assurance (YAEC)

Mr. D. Reid, Engineering Support Supervisor 2.

NRC Attendees Mr. E. Brunner, Chief, Projects Branch #1, Division of Resident and Project Inspection Mr. S. Collins, Resident Inspector Mr. R. Gallo, Chief, Reactor Projects Section IA, Division of Resident and Project Inspection Mr. R. Haynes, Regional Administrator, Region I Mr. V. Rooney, Licensing Project Manager, NRR Mr. R. Starostecki, Director, Division of Resident and Project l

Inspection 3.

Discussion A brief summary of the Systematic Appraisal of Licensee Performance (SALP) Program wa; presented to explain the basis and purpose of the evaluation.

The NRC Region I evaluation board meeting was discussed, including the appraisal period, performance data and the results of the board's evaluation.

The SALP rycle 2 evaluation report will be issued and distributed subsequerr.