IR 05000266/1983012

From kanterella
Jump to navigation Jump to search

IE Safeguards Insp Repts 50-266/83-12 & 50-301/83-12 on 830627-0701.No Noncompliance Noted.Major Areas Inspected: Security Organization - Mgt,Records & Repts & Safeguards Info.Details Withheld (Ref 10CFR73.21)
ML20024D052
Person / Time
Site: Point Beach  
Issue date: 07/27/1983
From: Belanger J, Creed J, Kniceley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20024D046 List:
References
50-266-83-12, 50-301-83-12, NUDOCS 8308030073
Download: ML20024D052 (2)


Text

I

,

e

'

U.S. NUCLEAR REGULATORY COMMISSION

.

REGION III

Reports No. 50-266/83-12(DRMSP); 50-301/83-12(DRMSP)

Docket Nos. 50-266; 50-301 Licenses No. DPR-24; DPR-27 Safeguards Group IV Licensee: Wisconsin Electric Power Company 231 W. Michigan Milwaukee, WI 53201-Facility Name: Point Beach Nuclear Plant, Units 1 and 2 Inspection At: Point Beach Site, Two Rivers, WI Inspection Conducted: June 27 - July 1, 1983 Date of Last Physical Security Inspection: February 7-11, 1983 Types of Inspection: Unannounced Physical Protection Inspectors:

u.

'l O

f. L. Belanger d Date Physical Protection Specialist h - & by

'lf 27 fD J. R. KniceleyJ Date Physical Protection Specialist 7/8/83 Approved By:

de J. R. Creed, Chief Date afeguard Section i

Inspection Summary Inspection on June 27 - July 1, 1983 (Reports No. 50-266/83-12(DRMSP) ;

50-301/83-12(DRMSP))

Areas Inspected:

Included Security Organization - Management; Security Organization - Personnel; Security Organization - Response; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Access Control-Personnel; Access Control - Packages; Access Control - Vehicles; Detection Aids - Protected Area; Detection Aids - Vital Areas; Alarm Stations; Communications; General Requirements - Power Reactors; Safeguards Contingency Plan; and Safeguards Information. The inspection involved 68 inspector-hours onsite by two NRC inspectors. The inspection began during the day shift; 12 of the 68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br /> were accomplished during off-shift periods.

Enclosure contelns SAFEGUARDS lilFORMATITI 8308030073 830727

'_

Upon Separation This Fa8e is DecontrclicJ PDR ADOCK 05000266 Q

PDR

_ _

_,-_.._. _ __

s

s-

  • ~ 'Results: The licensee was found to be in compliance with NRC requirements within the areas examined during this inspection. The previous items of noncompliance were closed with the exception of one item relating to the protected area intrusion alarm system.

(Details - UNCLASSIFIED )

.