IR 05000263/1981003

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-263/81-03 on 810209-13.No Noncompliance Noted.Major Areas Inspected:Security Plan,Security Program Audit & Security Organization.Details Withheld (Ref 10CFR2.790)
ML19350C046
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/04/1981
From: Creed J, Kniceley J, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19350C042 List:
References
50-263-81-03, 50-263-81-3, NUDOCS 8103240781
Download: ML19350C046 (2)


Text

.

.

o!

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-263/81-03 Docket No. 50-263 License No. DPR-22 Safeguards Group IV Licensee: Northern States Power Company 414 Nicollet Mall Minneapolis, MN 55401 Facility Name: Monticello Nuclear Generating Station Inspection At: Monticello Site Northern States Power Corporate Office Minneapolis, MN Inspection Conducted: February 9-13, 1981 Date of Last Physical Security Inspection: June 9-13, 1980 Type of Inspection: Routine, Unannounced Physical Security

,

Inspectors:

Sk

'3 / 4 II J. R. Knicele3Q Date Physical Security _ Specialist

-

-d.

M as 3/y/ 8l G. L. Ptftle-Date Physical Security Specialist

' Approved By:

G

. R. Creed, Acting Chief Date Safeguards Section Inspection Summary:

Inspection on February 9-13, 1981 (Report No. 50-263/81-03):

. Areas Inspected:

Included a review of the Security Plan; Security Program -

Audit; Security Organization; Protected Area Physical Barriers; Vital Area Physical Barriers; Lighting; Access Control (Identification, Authorization, and Badging); Access Control (Search); Access Control (Escorting); Access Control-(Vital Areas);-Alarm Stations; Detection Aids: Assessment' Aids; Communications; Testing and Maintenance; Compensatory Measures; Power t

sios24 0 W F

.

-

-

..=

.

.-

o

~

os.

'

Supply; Response; Locks, Keys and Combinations; Records and Reports; Licensee Action of Previous Inspection Findings; Followup on Unresolved

' Items; and Independent Inspection Effort. The inspection involved 66 inspector-hours onsite by two NRC inspectors. The inspection began during the day shift; eight inspection hours were accomplished during offshift periods.

Results: The? licensee was found to be in compliance with NRC require-

,

'

ments within the 20 areas exsmined during the. inspection except for the-following three items:

1.

Testing and Maintenance - Some required testing had not been performed on security related equipment.

2.

Access Control (Identification, Authorization, and Badging) - The

'

' licensee failed to conduct proper personnel screening in accordance -

with security plan commitments.

3.

Physical Barriers (Protected Area) - The licensee placed materials within the isolation zone.

b

'Each-of these items was co rected prior to the conclusion of the inspection.

'

In addition, one unresolved item was identified, which is being Lforwarded to

_.NRC. Headquarters.for evaluation.