IR 05000263/1981018
| ML20031B991 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 09/28/1981 |
| From: | Creed J, Kniceley J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20031B989 | List: |
| References | |
| 50-263-81-18, NUDOCS 8110060408 | |
| Download: ML20031B991 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
'
s s
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
i Report No. 50-263/81-18 i
'
Docket No. 50-263 License No. DPR-22 Safeguards Group IV Licensee: Northern States Power Company 414 Nicollet Mall Minneapolis, MN 55401 Facility Name: Monticello Nuclear Generation Station Inspection At: Monticello Site Northern States Power Corporate Office Minneapolis, MN Inspection Conducted: September 8-10, 1981 Date of Last Physical Security Inspection: February 9-13, 1981 Type of Inspection: Routine, Unannounced Physical Security Inspectors: Q. R.
1[MI J. R. Kniceley)
Date Physical Security Specialist
'
Approved By:
d it; Q
/
hjR.~ Creed,ActingChief 8 / Date Safeguards Section Inspection Summary Inspection on September 8-10, 1981 (Report No. 50-263/81-18)
Areas Inspected:
Included a review of the Security Plan and Implementing Procedures; Records and Reports, Testing and Maintenance; Physical Barriers
- Protected Areas; Physical Barriers-Vital Areas; Lighting; Access Control
- Personnel; Detection Aids - Protected Area; Detection Aids - Vital Area; Independent Inspection Effort; Followup of an Unresolved Item; and Imple-mentation of the Safeguards Event Reporting Requirements. The inspection involved 23 inspector-hours onsite by one NRC inspector. The inspection began during the day shift; three inspection hours were accomplishc.d during offshift periods.
8110060408 810929 CDR ADOCK 05000263
PDR l
_--
)
- -
.
%
k Results: The licensee was found to be in compliance with NRC requirements j
within the areas examined during the inspection. The unresolved item from Inspection Report No. 50-263/81-03 remains open. A commitment was made by t
the licensee to report dual computer failure under the provision of 10 CFR i
73.71(c).
i (Details Part 2.790(d) Information)
.
.
!