ML19350C041

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-263/81-03 on 810209-13.App a, Notice of Violation,Withheld (Ref 10CFR.2790).No Response Required
ML19350C041
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/17/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gilberts D
NORTHERN STATES POWER CO.
Shared Package
ML19350C042 List:
References
NUDOCS 8103240771
Download: ML19350C041 (2)


See also: IR 05000263/1981003

Text

T i c_.

org

j.

jo

UNITED STATES

g

NUCLEAR REGULATORY COMMISSION

e

n

$

. E

REGION 111

g"[

799 ROOSEVELT ROAD

0,\\

GLEN ELLYN, ILLINOIS 6o137

MAR 17 1981

Docket No. 50-263

3

~

k[f

"

Northern States Power Company

g

ATTN:

Mr. Dennis E. Gilberts

6% Ok

I

Vice President

0 /Sg k

'-3

Power Production and

.

System Operation

414 Nicollet Mall

B

Minneapolis, MN 55401

7

b

  • i

e

Gentlemen:

This refers to the routine physical protection inspection conducted by

Messrs. J. R. Kniceley and G. L. Pirtle of this office on February 9-13,

1981, of activities at the Monticello Nuclear Generating Plant authorized

by NRC Operating License No. DPR-22 and to the discussion of our findings

with Mr. R. Scheinost and other members of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

The inspection showed that action had been taken to correct the identified

noncompliance. The management action you are taking to insure that all

personnel will be briefed on isolation zone requirements and the monitoring

of surveillance test requirements should prevent recurrence.

Consequently,

no reply to this noncompliance is required and we have no further questions

regarding these matters.

Areas examined during this inspection concern a subject matter which is

exempt from disclosure according to Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations.

Consequently,

the enclosure to this letter and our report of this inspection will not be

placed in the Public Document Room.

8 08M 0 PT

ATTACHMENT CONTAINS

10 CFR 2.790(d) INFORMATION

--

..

.

(f-

it

.Nortnern States Power

-2-

ygp;7,g

.

Company-

We will gladly discuss any questions you have concerning this

inspection.

'

Sincerely,

s

g $. )') W0'v

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2. 'IE Inspection Report

No. 50-263/81-03

.

(Part- 2.790(d) Information)

cc w/encls:

-W.

A. Shamla, Plant

-Manager

Central Files

Reproduction. Unit NRC 20b

AEOD-

Resident' Inspector, RIII

cc w/encls, w/o Part 2.790(d)

Information:

PDR

Local PDR

NSIC.

TIC

John W. Ferman

Ph.D.,

Nuclear Engineer, MPCA

_

L

ATTACHMENT CONT INS

10 CFR 2.790(d)-INFORMATION

.

.

. . _

. . -

_

.

. .

.