Exam Rept 50-259/93-300 on 930924-1001 for All Units.Exam Results:One RO Candidate Failed Written Exam & All Other Candidates Passed Exam
ML18037A567
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/22/1993
From: Lawyer L, Moorman J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18037A566 List:
References
50-259-93-300, NUDOCS 9311300147
Download: ML18037A567 (8)


Text

~S Atggp~

~c

~e A

e nO I

C lO gO

+eb*e+

UNITED STATES NUCLEAR REGULATORY COMM)SSION

REGION II

101 MARIETTASTREET. N.W., SUITE 2900 ATLANTA,GEORGIA 303234198 Report No.:

gp-259/93-30p Licensee:

Tennessee Yalley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Docket Nos.:

50-259, 50-260 and 50-296 License Nos.:

DPR-33, DPR-52, and DPR-68 Facility Name:

Browns Ferry Nuclear Plant Examination Conducted:

September 24-October 1, 1993 Chief Examiner:

J me H. Moorman, II o-u-0 Date Signe Accompanying Personnel:

D. Draper, PNL T. Bettendorf, PNL K. Mikkelsen, PNL Approved by: ~9m C P Lawrence L. Lawyer, Chief Operator Licensing Section Operations Branch Division of Reactor Safety a-Date Signe SUMMARY Scope:

NRC examiners conducted regular, announced operator licensing initial examinations during the period September 24 - October 1, 1993.

Examiners

'administered examinations under the guidelines of the Examiner Standards (ES),

NUREG-1021, Revision 7.

Seven Senior Reactor Ope} ator (SRO)

and five Reactor Operator (RQ) candidates received written and operating examinations.

931l300147 9310ZB PDR ADOGK 05000259 V

PDR

Candidate Pass/Fail:

Pass Fail SRO p

RO Total Percent 92K No violations or deviations were identifie REPORT DETAILS 1.

Persons Contacted Licensee Employees

  • T. Albright, Simulator Services
  • D. Ashley, Operations Training Manager - Corporate
  • M. Bajestani, Technical Support, Manager J. Bennett, Instructor
  • T. Dexter, Training Manager

"J.

Hammond, Nuclear Assurance

  • D. Hill, Operations Training Manager
  • M. Meek, Hot License Training Lead Instructor
  • R. Moll, Operations Superintendent
  • P. Salas, Licensing Manager
  • O. Zeringue, Site Vice President Other licensee employees contacted included instructors, engineers, technicians, operators, and office personnel.

NRC Personnel

  • R. Musser, Resident Inspector C. Patterson, Senior Resident Inspector

~Attended exit interview 2.

Discussion a.

Scope Initial operator licensing examinations were administered to five RO and seven SRO candidates.

The written examination was administered on September 24, 1993, and the operating tests were administered September 27-29, 1993.

b.

Results One RO candidate failed the written examination; all other candidates passed the examinations.

c.

Exam validation The written exam was pre-reviewed in the Region II office on September 7-9, 1993, by representatives from the Browns Ferry training department.

Simulator scenarios and Job Performance Measures were validated on the Browns Ferry simulator during the week of September 13, 199 Report Details d.

Candidate Performance Candidate performance on written examinations and operating tests indicated no generic weaknesses.

However, the level of satisfactory performance exhibited by this class was noted as being slightly below that of previous license classes at Browns Ferry.

e.

Reference Material Reference material provided to the NRC for exam development continues to be of good quality.

The material includes a separate index that cross-references procedures and lesson plans to the K/A numbers of NUREG 1123, Knowledge and Abilities Catalog for Nuclear Power Plant Operators:

Boiling Mater Reactors.

This index greatly enhanced exam preparation and documentation.

4.

Exit Interview At the conclusion of the site visit, the examiners met with representa-tives of the plant staff listed in paragraph one to discuss the results of the examinations.

The licensee did not identify as proprietary any material provided to, or reviewed by the examiners.

Dissenting comments were not received from the license ENCLOSURE 2 SIMULATOR FACILITY REPORT Facility Licensee:

Tennessee Valley Authority, Browns Ferry Nuclear Plant Facility Docket Nos.:

50-259, 50-260 and 50-296 Operating Tests Administered On:

September 27 - 29, 1993 This form is to be used only to report observations.

These observations do not constitute, in and of themselves, audit or inspection findings and are not, without further verification and review, indicative of noncompliance with

CFR 55.45(b).

These observations do not affect NRC certification or approval of the simulation facility other than to provide information that may be used in future evaluations.

No licensee action is required solely in response to these observations.

While conducting the simulator portion of the operating tests, the following items were observed (if none, so state):

DESCRIPTION No deficiencies were noted.