IE Insp Rept 50-247/79-07 on 790319-23.Noncompliance Noted: Defects in Physical Barrier,Illumination Levels, Communication Test Records and Vital Area Access Records. Details Withheld (Ref 10CFR2.790)
ML19254E877
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 04/16/1979
From: Bailey R, Devlin J, Rodgers M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19254E865 List:
References
50-247-79-07, 50-247-79-7, NUDOCS 7911020514
Download: ML19254E877 (4)


Text

^

U.S. NUCLEAR REGULATORY COMMISSION

-

OFFICE OF INSPECTION AND ENFORCEMENT

Region I Report No.

50-247/79-07 Docket No.

50-247 Safeguards Group:

License No. DPR-26 Priority

Category C

Licensee:

Consolidated Edison Company of New York, Inc.

4 Irving Place New York, New York 10003 Facility Name:

Indian Point Nuclear Generating Station, Unit 2

'

Inspection at:

Buchanan, New York Inspection conducted 7 March 19-23,jl979 INr. :.

./ Nf;. /. s g [pf

.

Inspectors:

R. J. Bailey,. Physical SecUr'ity Inspector

' date signed b./6 29 l

C e-w M. Rogers, PhysicafSecurity Inspector date sign'ed date signed Approved by: [

~['h/$wo /

4'-

, e '19

/gJ. W. Deviin, C%1', Secur

& Investigation date signed Section,SafsfuardsBrnch Inspection Summary:

Inspection on March 19-23,1979 (Rept.

No. 50-247/79-07 Areas Inspected:

An implementation of 10 CFR 73.55 and compliance with the accepted security plan relative to security program audit, security organization, physical barriers (P'.), (VA), lighting, access control, alarm stations, detection aids, assessment aids, communications, testing and maintenance, compensatory measures, power supply, response, locks, keys and ~ combinations, records and reports.

Followup on licensee action on previously identified items of noncompliance related to physical security.

The inspection involved 51 inspector-hours onsite by two NRC regional based inspector and commenced during the off-shift hours.

.

.

.

1240 288 Region I Form 12 (Rev. April 77)

7911020 5/4-

..

Inspection Summary (continued)

.

Resul ts: Of the fifteen areas inspected, no apparent items of noncompliance were identified in eleven areas; four apparent items of noncompliance were identified in four areas (infraction-defect in physical barrier - Para 6; infraction - failu.e to meet illumination levels in the protected-area -

Fara 8; infraction - failure to maintain communication test records.

Deficiency-failure to complete vital area access records.

,