IR 05000245/1982018

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-245/82-18 on 820929-30.No Noncompliance Noted.Major Areas Inspected:Snm Control & Accounting,Including Facility Organization & Operation, Shipping & Receiving,Storage & Internal Control
ML20028B200
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/22/1982
From: Gody A, Woltner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20028B191 List:
References
50-245-82-18, NUDOCS 8211300162
Download: ML20028B200 (5)


Text

3

..

U. S. NUCLEAR REGULATORY COMMISSION Region I Report No. 50-245/87-18 Docket No. 50-245 License No. OPR-21 Safeguards Group

Licensee:

Northeast Nuclear Energy Company i

P. O. Box 270 Hartford, Connecticut 06101 Facility Name:

Millstone Point, Unit 1 Inspection At:

Waterford, Connecticut Inspection Conducted:

September 29-30, 1982 Date of Last Material Control and Accounting Inspection:

May 11, 1978 Type of Inspection:

Unannounced Inspection of Nuclear Material Control and Accounting Inspector:

[

C

/

22!f 2 E. Woltner, Auditor da'te signed e

Approved By:

/O 88 88

.

A.7. Gody,Nhi e f, S uards & Fuel date signed Facilities Section N clear Materials

& Safeguards Bra

Inspection Summary:

Inspection on September 29-30, 1982 (Report No. 50-245/82-18)

Areas Inspected: Routine, unannounced inspection of special nuclear material control and accounting includina Facility Organization and Operation, Shipping

,

and Receiving, Storage and Internal Control, Physical Inventory, and Records

'

and Reports. The inspection involved 14 inspector hours onsite by one NRC

'

i inspector and was begun c>sring regular hours.

Results:

The licensee was in compliance with NRC requirements for the areas examined during the inspection.

f

.

g oh.

0500

$2

l a

.-

.

.

DETAILS 1.

Key Persons Contacted

  • R. Herbert, Superintendent
  • M. Bigiare!11, Reactor Engineer
  • denotes attendance at the exit interview.

2.

30703 - Exit Interview The inspector met with the licensee representatives (denoted in paragraph 1) at the conclusion of the inspection on September 30, 1982. The scope and findings of the inspection were summarized.

3.

85102 - Material Control and Accounting a.

Facility Organization and Operation No violations were identified.

The inspection results were obtained through discussions with licensee personnel and review of procedures contained within SNM Inventory and Control Procedures, RE 1001, dated July 21, 1982. The procedures were adequate for the control of SNM.

b.

Shipping and Receiving No violations were identified.

The inspector determined that the licensee had established proce-dures to assure that all SNM received or shipped was accurately accounted for.

c.

Storage and Internal Control No violations were identified.

The licensee established a system of storage and internal control which provided for current knowledge of the quantity and identity of all SNM within the facility.

d.

Physical Inventory No violations were identified.

The inspector reviewed supporting records, which showed physical inventories were conducted at least annually, as required by 10 CFR 70.51(d).

In addition, the inspector reviewed supporting records which reconciled with the quantity of SNM shown as of March 31, 198 a e

e.

Records and Reports No violations were identified.

The inspection results were attained through an audit of all material status reports (Form NRC-742) submitted as required by 10 CFR 70.53 for the period of April 1, 1978 through March 31, 1982. Material balances for the period reviewed are attached as Exhibit I and I..

,

.

s'

.

-

'

EXHIBIT I Millstone Nuclear Power Station Unit I Docket No. 50-245 License No. DPR-21 Material Balance for Period:

April 1, 1978 - March ?,'.,

1982

Reporting Identification Symbol: YLG Reporting Unit:

grams Enriched Uranium Normal Uranium

'

Element Isotope Element Isotope Beginning Inventory:

225,775,833 2,889,728-0-

-0-(4-1-78)

Additions:

From Normal Uranium Account: 2,486,584 17,795-0-0-

Receipts:

53,725,872 1,515,840 2,486,584 17,795 Material to Account for:

281,988,289 4,423,363 2,486,584 17,795

,

'

'

Removals:

'

'

To Enriched Uranium Account:

-0-

-0-2,486,584 17,795 Shipments:

57,313 1,143-0-

-0-Degradation to Other

,

  • '

f Materials:

17,248,290 114,302-0-

-0-Inventory Difference:*

6-0-

-0-l Fission and Transmutation:

2,672,466 1,379,296-0-

-0-

!

Total Removals:

19,978,071 1,494,747 2,486,584 17,795 Ending Inventory:

262,010,218 2,928,616-0-

-9-(3-31-82)

Material Accounted For:

281,988,289 4,423,363 2,486,584 17,795

  • Due to rounding error.
  • l

. -.

_

.

.

..

1, t

EXHIBIT II Millstone Nuclear Power Station Unit 1 e

Docket No. 50-245 License No. DPR-21 Material Balance for Period: April 1, 1978 - March 31, 1982 Reporting Identification Symbol: YLG Reporting Unit: grams Plutonium Depleted Uranium Elenient Isotope Element Isotope

,

Beginning Inventory 1,364,274 1,023,909-0-

-0-

,

(4-1-78)

>

Additions:

Production:

602,432 410,633-0-

--0-From Other Materials:

-0-

-0-17,248,290 114,302 Receipts:

--0-

-0-

-0-

-0-Material to Account i

For:

1,966,706 1,434,542 17,248,290 114,302 Removals:

Shipments:

201 157

- 0 --

-0-Decay:

19,851 19,851-0-

-0-Inventory Dif ference:*

(1)

-0

___

-0--

-0-Total Removals:

20,051 20,008-0-

-0-l Ending Inventory 1,946,655 1,414,534 17,248,290 114,302 (3-31-82)

,

.

Material Accounted For:

1,966,706 1,434,542 17,248,290 114,302

.

_fi

-,

  • Due to rounding error.

/.

a

-, _., _