IE Safeguards Insp Rept 50-336/82-21 on 820928-29.No Noncompliance Noted.Major Areas Inspected:Snm Control & Accounting,Facility Organization & Operation,Shipping & Receiving,Storage & Internal Control
ML20028B717
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/22/1982
From: Gody A, Woltner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20028B705 List:
References
50-336-82-21, NUDOCS 8212030177
Download: ML20028B717 (5)


Text

{{#Wiki_filter:( - -

. U.S. NUCLEAR REGULATORY COMMISSION REGION 1 Report No.

50-336/82-21 Docket No.

50-336 License No.

DPR-65 Safeguards Group

Licensee: Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut Facility Name: Millstone Point Unit 2 Inspection at: Waterford, Connecticut Inspection conducted: September 28-29, 1982 Date of Last Material Control and Accounting Inspection: May 11, 1978 Type of Inspection: Unannounced Nuclear Material Control and Accounting Inspector: [[ /0

  • /PA E. Wol ner, Auditor

/ datfe /O /82 8 E Approved by: __ . A.4. Gody d hief, guards and Fuel / Aate Facilities Section, clear Materials & Safeguards Branc Inspection Summary: Inspection on September 28-29, 1982 (Report No. 50-336/82-21) Areas Inspected: Routine, unannounced inspection of special nuclear material control and accounting including Facility Organization and Operation, Shipping and Receiving, Storage and Internal Control, Physical Inventory, and Records and Reports. The inspection involved 14 inspector hours on site by one NRC inspector and was begun during regular hours.

Results: The licensee was in compliance with NRC requirements for the areas examined during the inspection.

i t i ! 8212030177 821117 PDR ADOCK 05000336 Q PDR I

i

. DETAILS 1.

Key Persons Contacted

  • J. Kelley, Superintendent
  • R. Place, Engineering Supervisor
  • J. Parillo, Reactor Engineer
  • Denotes attendance at the exit interview.

2.

30703 - Exit Interview The inspector met with the licensee representatives (denoted in paragraph 1) on September 30, 1982.

The scope and findings of the inspection were summarized.

3.

85102 - Material Control and Accounting a.

Facility Organization and Operation No violations were identified.

The inspection results were obtained through discussions with licensee personnel and review of procedures contained within SNM Inventory and Control Procedure EN 21001, dated April 9, 1981. The procedures were adequate for the control of SNM.

b.

Shipping and Receiving No violations were identified.

The inspector determined that the licensee had established procedures to assure that all SNM received or shipped was accurately accounted ' for.

c.

Storage and Internal Control No violations were identified.

The licensee established a system of storage and internal control which provided for current knowledge of the quantity and identity of all SNM within the facility.

l l ! . I

r n .

.

d.

Physical Inventory No violations were identified.

The inspector reviewed supporting records, which showed physica's inventories were conducted at least annually, as required by 10 CFR 70.51 (d).

In addition, the inspector reviewed supporting records which reconciled with the quantity of SNM shown as of March 31, 1982.

e.

Records and Reports No violations were identified.

The inspection results were attained through an audit of all material status reports (Form NRC-742) submitted as required by 10 CFR 70.53 for the period of April 1, 1978 through March 31, 1982. Material balances for the period reviewed are attached as Exhibits I and II.

I ! ! i I r i I

'

i f

( - - ,. , EXHIBIT I MILLSTONE NUCLEAR POWER STATION UNIT 2 Docket No. 50-336 License No. DPR-65 Material Balance for Period: April 1,1976 - March 31,1982 Reporting Identification Symbol: XBD Reporting Unit: grams Enriched Uranium Element Isotope Beginning Inventory: (4-1-78) 109,082,053 1,746,470 Additions: From Normal Uranium Account: -0- -0-Receipts: 118,220,565 3,634,957 Material to Account for: 227,302,618 5,381,427 Removals: To Enriched Uranium Account: -0- -0-Shipments: 31,630,522 980,335 Degradation to Other Materials: 48,053,244 286,114 Inventory Difference:*

(11) Fission and Transmutation: 3,419,989 1,870,157 Total Removals: 83,103,778 3,136,595 Ending Inventory: (3-31-82) 144,198,840 2,244,832 Material Accounted For: 227,302,618 5,381,427 ,

  • Due to rounding error.

i l !

. I

r ^

. EXHIBIT II MILLSTONE NUCLEAR POWER STATION UNIT 2 Docket No. 50-336 License No. DPR-65 Material Balance for Period: April 1, 1978 - March 31, 1982 Reporting Identification Symbol: XBD Reporting Unit: grams P,'. uto ni um Depleted Uranium Element Isotope Element Isotope BIginning Inventory (4-1-78) 46r,,125 359,351

0 Additions: Production: 705,116 490,982

0 From Other Materials:

0 48,053,244 286,114 Receipts:

0

0 Material to Account For: 1,173,241 850,333 48,053,244 286,114 Removals: Shipments:

0

0 D: cay: 9,549 9,549 Inventory Difference:*

4

0 Total Removals: 9,554 9,553

0 Ending Inventory (3-31-82) 1,163,687 840,780 48,053,244 286,114 Material Accounted For: g 850,333 48,053,244 g

  • Due to rounding error.

}}