Forwards IE Safeguards Insp Rept 50-245/82-18 on 820929-30. No Noncompliance Noted
ML20028B190
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/15/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20028B191 List:
References
NUDOCS 8211300153
Download: ML20028B190 (2)


See also: IR 05000245/1982018

Text

'

w

a

NOV 151982

Docket No. 50-245

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection No. 50-245/82-18

This refers to the safeguards inspection conducted by Mr. E. Woltner of this

office on September 29-30, 1982 at Millstone Nuclear Power Station, Unit 1,

Waterford, Connecticut of activities authorized by NRC License No. DPR-21 and

to the discussions of our findings held by Mr. Woltner with Mr. R. Herbert of

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and represent-

ative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the require-

ments of 2.790(b)(1). The telephone notification of your intent to request

withholding, or any request for an extension of the 10 day period which you

believe necessary, should be made to the Supervisor, Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

urisiaal81 sped 8p

GllMS

T2 YM

y Thomas T. Martin, Director

Division of Engineering and Technical

,

Programs

Enclosure: NRC Region I Inspection Report Number 50-245/82-18

0FFICIAL RECORD COPY

'

8211300153 821115

i

PDR ADOCK 05000245

/p., g y

'

G

PDR

_ _

__

_

_

..

.

.

Northeast Nuclear Energy Company

2

NOV 151982

,

cc w/ enc 1:

J. F. Opeka, Vice President, Nuclear Operations

E. J. Mroczka, Station Superintendent

!

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

,

Public Document Room (PDR)

'

l

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc W/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o enc 1)

i

Chief, RPS IB

1

.

I

t

.

4

b

I/ )N

-

RI:NTP

P

.BM,

DETP

1

Woltner/cgl ' 'Go y

yner,

artin

.

1

10/20/82

j'g7

/ I[/ z/JPts

j

0FFICIAL RECORD COPY

,

!

-__

- . _ _ _

.-

_

.

.

. .

.-.-.--- -

_

- .

- .

-

. . .

. .

.