IR 05000245/1982011

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-245/82-11 & 50-336/82-11 on 820524-28.Deviation Noted:Failure to Meet Commitment.Details Withheld (Ref 10CFR73.21)
ML20062B859
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 07/19/1982
From: Cogan N, Gody A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20062B846 List:
References
50-245-82-11, 50-336-82-11, NUDOCS 8208050085
Download: ML20062B859 (1)


Text

'

.

>

.

U. S. NUCLEAR REGULATORY COMMISSION

REGION I

50-245/82-11 Combined Report Nos.

50-336/82-11 ' -

50-245 DPR-21

.

-

Docket Nos.

50-336 License Nos.

DPR-65 Safeguards Group IV Licensee:

Northeast Nuclear Energy Company P.O. Box 270 Hartford, Connecticut 06101 Facility Name:

Millstone Nuclear Power Station, Units 1 and 2 Inspection At:

Waterford, Connecticut Inspection Conducted:

May 24 - 28, 1982 Date of Last Physical Protection Inspection:

February 1 - 5, 1982 Type of In ection:

Routine, Unannounced Physical Protection b

N

~/7,/7f Inspector:

dea,

~{n~cyJ ysan,fhysicalProtectionInspector

/

pte'/

r 42 /

[/8/dC Approved by:

Anthony T. 5 7, Ch M, Safegu s Section

/datg Inspection Summary:

Inspe ion conducted M 24-28, 1982 (Combined Inspection Report 50-245/82-11 and 50-336/82-11)

l Areas Inspected:

Security Organization (Management, Personnel, Response);

l Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers (Vital Areas); Security System Power Supply; Access Control (Personnel, Packages, Vehicles); Detection Aids (Protected Area, Vital Areas);

Alarm Stations; Communications; Followup on Inspector-identified Problem; and Followup on Violations. The inspection began during non regular hours and involved 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> onsite by one Region-based inspector; 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> were conducted during off-shift periods.

Results:

No violations of NRC requirements were noted.

A deviation was identified which involved the licensee's failure to meet a commitment made to

,

!

the Commission.

l l

l

'

8208050085 820721

'

PDR ADOCM 05000245

PDR

-