MONTHYEARML24234A0922024-08-21021 August 2024 Requalification Program Inspection RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23013A1362022-12-0808 December 2022 Post Exam Comments and NRC Resolutions ML23247A0102022-11-0404 November 2022 Miscellaneous Exam Material ML23012A0772022-10-14014 October 2022 Administered Written Examination with Answer Key ML23247A0032022-10-14014 October 2022 Handouts to Applicants ML23013A0432022-10-14014 October 2022 Administered Operating Test ML23247A0072022-09-28028 September 2022 NRC Comments on Draft Licensee-Developed Operating Test ML23247A0082022-09-28028 September 2022 NRC Comments on Draft Licensee-Developed Written Exam ML23247A0092022-09-28028 September 2022 Final QA Related Forms ML23247A0012022-09-21021 September 2022 Final Written Examination and Operating Test Outlines ML23247A0022022-09-21021 September 2022 Modified Question Source Information ML23247A0062022-09-21021 September 2022 NRC Comments on Draft Licensee-Developed Operating Test Outlines ML23247A0052022-07-21021 July 2022 Draft Written Examination ML23233A0472022-07-21021 July 2022 Draft Operating Test ML23247A0042022-05-19019 May 2022 Draft Written Examination and Operating Test Outlines RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions ML20041E1772019-07-30030 July 2019 Handouts to Applicants (Folder 3) ML20024E8202019-07-23023 July 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20024E8912019-07-23023 July 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20024E7502019-07-23023 July 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20024E6992019-07-23023 July 2019 Draft Written Examination (Folder 2) ML20024E2492019-07-23023 July 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 2024-08-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23013A1362022-12-0808 December 2022 Post Exam Comments and NRC Resolutions ML23247A0102022-11-0404 November 2022 Miscellaneous Exam Material ML23012A0772022-10-14014 October 2022 Administered Written Examination with Answer Key ML23013A0432022-10-14014 October 2022 Administered Operating Test ML23247A0032022-10-14014 October 2022 Handouts to Applicants ML23247A0082022-09-28028 September 2022 NRC Comments on Draft Licensee-Developed Written Exam ML23247A0072022-09-28028 September 2022 NRC Comments on Draft Licensee-Developed Operating Test ML23247A0092022-09-28028 September 2022 Final QA Related Forms ML23247A0062022-09-21021 September 2022 NRC Comments on Draft Licensee-Developed Operating Test Outlines ML23247A0012022-09-21021 September 2022 Final Written Examination and Operating Test Outlines ML23247A0022022-09-21021 September 2022 Modified Question Source Information ML23233A0472022-07-21021 July 2022 Draft Operating Test ML23247A0052022-07-21021 July 2022 Draft Written Examination ML23247A0042022-05-19019 May 2022 Draft Written Examination and Operating Test Outlines RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions ML20041E1772019-07-30030 July 2019 Handouts to Applicants (Folder 3) ML20024E8912019-07-23023 July 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20024E7502019-07-23023 July 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20024E2492019-07-23023 July 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20024E8202019-07-23023 July 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20024E6992019-07-23023 July 2019 Draft Written Examination (Folder 2) RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations 2023-06-16
[Table view] |
Text
ber 10, 2004
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 05000244/2004302
Dear Mrs. Korsnick:
This report transmits the results of the Senior Reactor Operator (SRO) licensing examination conducted by the NRC during the period of November 1 and 2, 2004. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 9).
Based on the results of the examination, the SRO applicant passed all portions of the examination. The applicant was an upgrade SRO. Mr. S. Dennis discussed performance insights observed during the examination with Mr. K. Masker, Operations Training Instructor on November 2, 2004. On November 10, 2004, final examination results, including individual license number, were given during a telephone call between Mr. F. Maciuska, Director Operations Training and Mr. Dennis.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS; SRO Written - Accession Number ML043280258; SRO Operating Section A - Accession Number ML043280262; SRO Operating Section B - Accession Number ML043280280; SRO Operating Section C - Accession Number ML043280287. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Mrs. Mary Should you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@NRC.GOV.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No: 50-244 License No: DPR-18 Enclosure: Initial Examination Report No. 05000244/2004302 cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. M. Petro, Jr., Esquire, Counsel, Constellation Energy Group, Inc.
P. R. Smith, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority D. Stenger, Ballard, Spahr, Andrews and Ingersoll, LLP T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network R. Watts, Manager, Nuclear Training F. Maciuska, Director, Operations Training
Mrs. Mary
SUMMARY OF FINDINGS
IR 05000244/2004302; November 1-2, 2004; R. E. Ginna Nuclear Power Plant; Initial Operator
Licensing Examination. One of one applicant passed the examination (SRO upgrade).
The written examination and operating test were administered by two NRC region-based examiners. There were no inspection findings of significance associated with the examinations.
A. Inspector Identified Findings No findings of significance were identified.
B. Licensee Identified Findings No findings of significance were identified.
ii
REPORT DETAILS
REACTOR SAFETY
Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial License Examination
a. Scope
of Review The Ginna training staff developed the written and operating initial examination and together with NRC examiners verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines of Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. A review was conducted both in the Region I office and at the Ginna plant and training facility. Final resolution of comments and incorporation of test revisions were conducted during and following the onsite preparation week.
- Simulation facility operation was proper.
- A test item analysis was completed on the written examination for feedback into the systems approach to training program.
- Examination security requirements were met.
The NRC examiners administered the written and operating portions of the examination to all applicants on November 1 and 2, 2004.
b. Findings
Grading and Results The applicant, one SRO upgrade, passed all portions of the initial licensing examination.
The facility had no post-examination comments.
Examination Administration and Performance No findings of significance were identified.
4OA6 Exit Meeting Summary
On November 10, 2004, the NRC provided conclusions and examination results to Ginna management representatives via telephone. The license number for the applicant was also provided during this time.
The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- F. Maciuska, Director, Operations Training
- R. Watts, Manager, Nuclear Training
- K. Masker, Operations Training Instructor
NRC
- T. Fish, Senior Operations Engineer
- S. Dennis, Senior Operations Engineer
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
ITEM NUMBER TYPE DESCRIPTION
NONE
Attachment